Skip to the record
The gold standard in government transparency.

Council archive · source document

0015584F.001

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

Project No. 306-2474
  November, 2006                                                                          Page 1
                                                                                        Page
  1.0   INTRODUCTION
        This report presents the results of the geotechnical investigation carried out by Soil
        Surveys Engineering Pty. Limited at the site of the proposed duplex residence, located at
        the corner of Bryan and Furguson Streets, Sunshine Beach.
        The report details the scope of the investigation works undertaken and provides
        discussion on existing ground conditions and recommendations on geotechnical design
       parameters to assist with the design and construction of the proposed development.
  2.0  SCOPE OF GEOTECHNICAL SERVICES
 £0 SUUre Ur GEOTECHNICAL SERVICES
       The objectives of this Study were to identify materials and material properties and
       groundwater conditions to enable geotechnical assessment of design parameters to           ©
       assist the design and construction of the proposed development:-
        *  Investigation of the subsurface profile in the area of proposed duplex residence by
           drilling, sampling and insitu testing with three (3) boreholes.
        *  Laboratory testing on selected Samples to assess the geotechnical properties of the
           subsurface material.
        *  Engineering analysis of site investigation and laboratory test results to evaluate:-
           -   Site preparation and earthworks recommendations
           - | Foundation parameters for design, including allowable bearing capacity
3.0   PROPOSED DEVELOPMENT                                                                        ®
St SAME         EY VPEVELOPMENT
      It is understood that the proposed development is to consist of a duplex pair of residential
      units. Referring to the provided architectural plans, the buildings is to be two storeys, with
      a basement carpark. It is expected that the building would have a podium slab,
      Suspended concrete slab floors, and mixed masonry and frame construction.

                                                         YB  SOIL SURVEYS ENGINEERING

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015584F.001.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.