Council archive · source document
0015584F.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
Form 1 Development Application idas
Operational &/or building work %
assessable against a local government’s planning scheme <t |
2 3 s
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.
Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises (J Preliminary approval - provice details of the type of work eg. roadwork, stormwater, water and sewerage
development to occur, while a preliminary infrastructure, elc
approvat is a step in the approval process :
anddoesotauotse deveoomentioocc| [|
© a planning scheme are determined by the AND/ OR
The types of work that are assessable against
wilvany poll erne-vlies govemment and Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
To determine th f work that are infrastructure, etc
assessable under & pariular planing Landscaping, access and/or carparking, site civil works, stormwater drainage, frontage
scheme, contact the relevant tocal works and earthworks.
goverment. :
2. Are the works subsequent to a previous development approval?
[_] NO YES - provide details of all previous approvals (eg. file references)
Development Approval for a Material Change of Use - Application Ref: 2006/1155
3. _ Is the subdivision for a canal estate?
x] NO (] YES
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) YES - complete Q5
Prior to issuing a development pemnit for the
works, the assessment manager is required Lj NO - Q5, 6 & 7 do not apply
by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSLlevy |5. Has the PLSL levy been paid?
has been paid. EX] YES - completeas
© | NO -~ the applicable levy must be paid before a development permit can be given for the works
6. How much was paid?
8535
7. Whatis the receipt number of the payment?
E008884
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
REFERENCESee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015584F.001.pdfRelated documentPublic source context ↗
07/0528 - Op Works, Landscaping,Access Car Parking & Earthworks - Goode Family Trust [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.