Council archive · source document
0015584F.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
Oo)
BRYAV STREET LEGEND
STORMWATER DRAINAGE PIPE AND
ee i. = WLET PIT
ns
CONSTRUCTION ENTRY/EXIT ROOF DRAINAGE AND CONNECTION POINTS
oe. REFER DETAIL EXISTING CONTOURS [10m INTERVALS)
ate ~
+ -
ea ea
4, - a an EXISTING CONTOURS (0,25m INTERVALS)
att —F
zal
“we -_7 ot > 4c eat il oa FIX TO TOP OF STAKE wiTH Fix TO TOP OF STAKE WITH
_ ~ ar ee = EXISTING SEWER PIPE SHADECLOTH FASTENER OR
i fe Prd EXISTING FENCELINE rei GEOTEXTILE FAB SHADECLOTH FASTENER OR
wt
ron or me ou Ta — > a -> THE TO STEEL PICKET
we? rss Z » Sa =H 4 ym EXISTING SPOT LEVEL GEOTEXTILE FAB! sae 50250 HW STAKE OR STEEL
PICKET 3200mm MIN LONG
waft. bv4 =e ~ - AND F42
ane fo wa SEDIMENT FENCE AS PER DETAR Overtand Flow 50x50 HW STAKE OR STEEL TRS, als
—* PICKET 1200mm MIN LON!
Ae
ws
ae
\ ae ee 1) INLET PROTECTION AS PER DETAR
NK f =—-—— - (MESH & AGGREGATE)
je® wr vo fo as on te. CRUSHED OR GRANNULAR MATE
ay GRADING JO TABLE & OF OT
oe SPECIFICATION MRS11.03.
tye
a
ne \ vr ALTERNATIVE 1 ALTERNATIVE 2
ipo
Wg Sf na“ 4 — rT \
— 4
af
od PT woe 0
AS)
went 4 FS 0%, Fo2 FABRIC ar |
AS 3305
1 wee =. wt i po leet wer zo DISTURBED
241 al AREA ralete es
PSR,
ws ROS
I ae aa ti
ft | "Oy os"
an ran >. Su, GEOTEXTILE FASRIC
aR th
Co Lo ld aN POSTS OR STEEL PICKETS
a=
as DRIVEN 600mm INTO GROUND
Hf" yn as N “| ‘I Ly fy
100 MIN VERTICAL OVERLAP OF FABRIC
nt
aa an 4 Semen oS fee pki nneree hee 1 UNOS TURBED
hei =o
a] BACKFILL
ELEVATION
Ss olM F N D |
ROSION & SEDIMENT CONTROL PLAN NTS
E ee ee
SCALE 1: 250 (Al) SANDBAGS OVERLAP ONTO °°
4000 MiN—————-—--___.____
EROSION AND SEDIMENT CONTROL NOTES 1506 MIN eS = SS
EXTENT AND POSITION OF SILT FENCE AND SAND BAG SILTATION CONTROL PARTING THE SITE RUNOFF WAT |
1, ALL CONSTRUCTION VEHICLES D WITH SEDIMENT
SHED DOWN IN WET WEATHER,
SHALL HAVE THEIR TYRES WA
MEASURES TO BE DETERMINED ON SITE BY SUPERINTENDENT. MEASURES 2, THE CONTRACTOR SHALL INSPECT THE PUBLIC ROADS 600 NOM GAP BETWE —
SHOWN ON THIS DRAWING ARE MINIMUM REQUIREMENTS ONLY. ADJACENT TO THE SITE DAILY AND REMOVE ANY SOIL BAGS ACT AS SPILLWAY
PROVISION TO BE MADE FOR DIRT/SAND REMOVAL FROM CONSTRUCTION OR SILT DEPOSITS.
VEHICLES PRIOR TO TRAVEL ON PUBLIC ROADS. METHOD 10 BE APPROVEO THREE LAYERS OF SANDBAGS
BY SUPERINTENCENT PRIOR COMMENCEMENT OF WORK. WITH ENDS OVERLAPPED
GULLY PIT SILT PROTECTION TO BE USED ON ALL PITS. CONSTRUCTION BA LET S NT AP
ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT SITE Ae CATTLE GRIO 3.0m NOM WIDE NTS
NOOSA SHIRE COUNCIL STANDARD SPECIFICATION METHODS AND SET 300mm ABOVE GROUND
DRAWIBRSRACTOR IS TO TAKE ALL NECESSARY PRECAUTIONS TO CONTROL s/o
EROSION AND DOWNSTREAM SEDIMENTATION DURING ALL STAGES OF mlz LP “eee Zp
CONSTRUCTION INCLUDING THE MAINTENANCE PERIOD. Jo we
ALL SEDIMENT CONTROL OEVICES SHALL BE MONITORED, CLEANED AND/OR a PE Ly
%
REPAIRED WHENEVER THE ACCUMULATED SEDIMENT REDUCES THE CAPACITY
GEOFABRIC FABRIC
BY 50%. BIDUM U34 OR SIMIL
AT ALL TIMES THE CONTRACTOR SHALL MONITOR THE PREVAILING WEATHER ME
CONDITIONS AND PROTECT ANY DOWNSTREAM CONSTRUCTION AND GULLY INLETS. ‘Qs cS
INLETS TO HAVE SILT PROTECTION IN ACCORDANCE WITH KERB INLET PROTECTION < we
DETAIL AT LOCATIONS SHOWN OR AS DIRECTED BY THE SUPERINTENDENT.
ALL LOTS SHALL BE HYOROMULCHED, AS SPECIFIED. WITHIN SEVEN DAYS RUNOFF TO BE OIRECTED To A SEDIMENT® eae
TRAP. REFER DETAIL
OF FINAL TRIMMING.
URFING TO BE PLACEO WITHIN 14 DAYS OF
a TOPSOIL (100mm MINIMUM) AND T TEMPORAR STRUCT ENTRY/EX
FINAL EARTHWORKS TO VERGES AS SPECIFIED.
n PROVIOE ADDITIONAL SILT FENCE PROTECTION AT TOPSOIL STOCKPILE AREA. RAP
12 ALL SILT FENCES TO BE IN PLACE AT END OF BULK EARTHWORKS. NTS
GULLY PIT PROTECTION TO BE SN PLACE AT COMPLETION OF STORMWATER UNBOUND PAVEMENT MATERIAL (GRAVEL) TO GRADING °B’ TABLE 9 0 10 20 30 40 50m
3 DF OT SPECIFICATION MRS11.05, EXCLUDE MATERIAL FINER THAN
DRAINAGE AS, SIEVE 2.26mm
i ALL TEMPORARY EARTH STRUCTURES, INCLUDING SOIL | 1-1000 UNREDUCED }
STOCKPILES ARE TO BE TRACK ROLLED AND SEEDEO WITHIN
14 DAYS OF CONSTRUCTION.
PROMCT DRAWING TITLE
Tt QANTEC McWILLIAM |cOAST APARTMENTS EROSION & SEDIMENT CONTROL PLAN
ORY er Tepe obi Ite wie & part af 11S SocumeO! Wt any a es consulting engineers 56 FERGUSON STREET
i TEC PW RLLLAR Cansed tey
are vitheat Ine -ntten paren ties of es re ee [ Bryant House SUNSHINE BEACH
Creprrers Canetitutes an minngesant af copprighl Suite 3, Level 2, 26 Quporth Avenue
DANTE Mc WRLIAM Conuding Eapeners acteplt ne cexpeesieily Jr yt po Maroochydore Old 4558
the acoracy oF fet any Lomempence resetting trem Ihe ute or |} 0 Box 1196 Marnochydore Qld 4558 SCALES,
alleraten of thet drawing n eiectronn f PT Telephone (07) 5679 4666 CUNT CLEERT PROALT He
Drawings in wlectrenic form should he theched for accuracy eginel 01.03.07 ACN 086 362065 Facsumte (07) 5879 S628 YELLOW OYSTER PROPERTIES PTY. LTD. 1.100
Ih egy alent ard cosy maued by QAATEC Mew! E-Mail. maroachydote@qmew com au
Crar Ve coamenceng censiruchon wecify ail Gmanvont agawns? = Pt North Date Brisbane © Gayndah « Gladstone » M ° ARCHITECT
Adctlecl'y, athar Compultant’s and Suah-Contractar's éeaeegt [veser [em Tt Maryborough « Rockhampton « Darwin « Alice Springs BARK DESIGN ARCHITECTS
Demeraiany are hot 10 b4 Lcaled wr stad wiettrara oly trate thet [oar [vets
eraveg. Soleul me roe spetitic lly thew, are te be
ehlaned from tha Archtect's oe alter Contadlant's dresnngsSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015584F.001.pdfRelated documentPublic source context ↗
07/0528 - Op Works, Landscaping,Access Car Parking & Earthworks - Goode Family Trust [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.