                       AGENDA


              Special Meeting



               Tuesday, 29 May 2018

                   commencing at 11am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Tony Wellington (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Frank Wilkie



                    “Noosa Shire – different by nature”
Log in to download the original file

2018-05-29 Special Meeting Agenda(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 32 sections

Section 2

SPECIAL MEETING AGENDA                                       29 MAY 2018


TABLE OF CONTENTS


ITEM                                                               PAGE

ATTENDANCE & APOLOGIES                                                  -

REPORTS                                                                3

1      COUNCIL ENDORSEMENT OF PROPOSED NEW PLANNING SCHEME             3

2      LOCAL GOVERNMENT INFRASTRUCTURE PLAN (FOR ADOPTION)            15

MEETING CLOSURE                                                         -




                                                             Page 2 of 33

Section 3

SPECIAL MEETING AGENDA                                                                               29 MAY 2018


REPORTS
1                        COUNCIL ENDORSEMENT OF PROPOSED NEW PLANNING SCHEME
DOCUMENT INFORM AT ION




Author                              Planning Scheme Project Manager, Raul Weychardt
                                    Environment & Sustainable Development Department

Index                               ECM/ Project and Contract/ Planning Scheme Review 2016 – Project
                                    Planning

Attachment                          1.   Community Engagement Strategy

EXECUTIVE SUMMARY
Not applicable.


RECOMMENDATION
That Council note the report by the Planning Scheme Project Manager to the Special Meeting
dated 29 May 2018 regarding the proposed new Planning Scheme and:
A.                       Endorse the proposed new planning scheme for the purpose of a state interest review;
B.                       Give notice to the Chief Executive of the Department of State Development, Manufacturing,
                         Infrastructure and Planning of this decision;
C.                       Authorise Council’s Chief Executive Officer to consult with the Chief Executive of the
                         Department of State Development, Manufacturing, Infrastructure and Planning about issues
                         arising from the state interest review and to prepare consequential amendments to the
                         proposed planning scheme for Council consideration;
D.                       Authorise Council’s Chief Executive Officer to undertake minor edits to the proposed
                         planning scheme including to correct any anomalies; and
E.                       Note that a further draft of the planning scheme will be presented to Council following the
                         state interest review for the purpose of endorsement for community consultation.



REPORT
This report is intended to enable Council to endorse a new planning scheme (New Noosa Plan) for
the purpose of a first state interest review by the Queensland government.
The proposed New Noosa Plan remains confidential until it has been reviewed by the Queensland
government, is endorsed by Council for community consultation and is subsequently published.
Therefore, it is not publicly available as an attachment to this report.
1                        Preparing the New Noosa Plan
The process to prepare a New Noosa Plan commenced with preparation of a Discussion Paper
that expressed numerous policy ideas addressing seven themes and also the localities in Noosa
Shire. The Discussion Paper was released for community feedback between October and
December 2016 resulting in approximately 500 suggestions.
In September 2016, Council decided to prepare a New Noosa Plan under the Sustainable Planning
Act and staff progressed with drafting. With the introduction of the Planning Act in mid-2017 and,
after guidance material was published by the government, Council considered the option of
continuing the scheme preparation process under the new legislation and subsequently resolved in
November 2017 to continue preparation under the new Planning Act.


                                                                                                     Page 3 of 33

Section 4

SPECIAL MEETING AGENDA                                                            29 MAY 2018


Preparing the New Noosa Plan took into account a large range of inputs, including:
   The current Noosa Plan 2006 as a basis ;
   Queensland government interests as expressed in the State Planning Policy 2017 and the
     South East Queensland Regional Plan 2017;
   The Planning Act 2016 and the Planning Regulation 2017 ;
   Minister’s Guidelines and Rules 2017;
   Queensland government guidance material;
   Community feedback on the Discussion Paper;
   Feedback from a Professional Advisory Group and a Business Advisory Group;
   Feedback from a Social Forum and an Environment Forum;
   Council’s endorsed plans, strategies and principles –
     o     Social Strategy
     o     Local Economic Plan
     o     Noosa Design Principles
     o     Sustainability Principles
     o     Noosa Transport Strategy.
   Additional studies, including –
     o     Agriculture;
     o     Biodiversity including riparian areas;
     o     Centres Hierarchy;
     o     Extractive Resources;
     o     Natural hazards including flood management;
     o     Housing Needs Assessment ;
     o     On-site Effluent Disposal.
During preparation regular contact was made with officers of the Department of State
Development, Manufacturing, Infrastructure and Planning (formerly the Department of Local
Government, Infrastructure and Planning).
The proposed New Noosa Plan has been prepared in an online Tech One module called Eplan
which will offer significant improvements in functionality when the plan is released.
A new Local Government Infrastructure Plan will form part of the New Noosa Plan. It is currently
under preparation and will follow a different process to obtain government approval for
consultation. It will be submitted to Council for endorsement in coming months.


The steps to finalise the New Noosa Plan
The Queensland government was advised of Council’s decision to prepare the New Noosa Plan
under the Planning Act. As required by the Act the Chief Executive of the Department provided
Council with a Notice pursuant to Section 18 of the Act in March. That Notice sets out the
procedural steps and timeframes for making the New Noosa Plan.
Following Council’s endorsement of the proposed New Noosa Plan, it will be sent to the
Queensland government for the first state interest review. The Notice from the Chief Executive
indicates that this phase may take 45 business days but there is a prospect of a longer period if
either the government or Council choose to pause the process. The government will advise of any
changes it requires to be made to the proposed plan as a consequence of this review and these
will need to be incorporated. Following that review process the New Noosa Plan will be presented
to Council for endorsement for community engagement.




                                                                                  Page 4 of 33

Section 5

SPECIAL MEETING AGENDA                                                              29 MAY 2018


In November 2017 Council endorsed a summary community engagement program for information
of the Queensland government. The summary was based on the engagement process undertaken
with the Discussion Paper and has now been expanded to form the full proposed engagement
strategy attached to this report. Staff propose Council endorse this strategy for submission to the
government with the proposed New Noosa Plan. However, in coming months Council will be given
the opportunity to decide if additional or different consultation measures should be undertaken.
After community engagement is completed, Council will consider submissions received and make
deliberations accordingly. The proposed New Noosa Plan will be amended to accommodate
Council’s responses to submissions and then sent to the Queensland government for a second
state interest review. Following that second review process and Council’s consideration to any
matters arising, Council will then be in a position to finally approve the New Noosa Plan. It is
currently anticipated this final approval step may take place by mid to late 2019.


Previous Council Consideration
In December 2015 Council considered a report that provided an overview of the timeline, resource
requirements, estimated budget and other considerations for undertaking a new planning scheme
project. As a consequence, budget provision has been made for preparing the new scheme and
assembling a project team.
Ordinary Meeting, 17 December 2015, Item 3, Page 7
That Council note the report by the Special Projects Officer and Director, Planning & Infrastructure
to the Planning & Organisation Committee Meeting dated 8 December 2015 and:
A.   Note the draft project brief for the new planning scheme project; and
B.   Authorise the CEO to make an application to the Minister for an extension of time to amend
     Council’s Priority Infrastructure Plan in accordance with the Local Government and Other
     Legislation Amendment Act (No. 2) 2015 amendments to the Sustainable Planning Act
     (2009) (SPA) sections 997, 979, 983 and 996.


In September 2016, Council resolved to prepare a new planning scheme. The resolution was made
and acted upon pursuant to the Sustainable Planning Act 2009. However, with the introduction of
the Planning Act 2016, Council decided in November 2017 to discontinue preparation of the New
Noosa Plan under the Sustainable Planning Act and move to comply with the Planning Act.
Ordinary Meeting, 15 September 2016, Item 5, Page 8
That Council note the report by the Planning Scheme Project Manager to the Planning &
Environment Committee Meeting dated 6 September 2016 in relation to the proposal to prepare a
New Planning Scheme and:
A.   Endorse the document The Noosa Plan 2006 - Ten Year Review as provided at Attachment
     1 to the report;
B.   Propose to prepare a new Planning Scheme for the whole of Noosa Shire;
C.   Authorise the Chief Executive Officer to prepare a Statement about State Interests; and
D.   Advise the Minister of this decision.




                                                                                    Page 5 of 33

Section 6

SPECIAL MEETING AGENDA                                                                       29 MAY 2018


Ordinary Meeting, 16 November 2017, Item 2, Page 4
That Council note the report by the Planning Scheme Project Manager to the Planning &
Environment Committee Meeting dated 7 November 2017 and:
A.     Discontinue preparation of the new Planning Scheme under the Sustainable Planning Act
       2009;
B.     Propose to make a new Planning Scheme for the whole of Noosa Shire under the Planning
       Act 2016;
C.     Advise the Minister of this decision;
D.     Authorise the Chief Executive Officer to prepare an amended Statement about State
       Interests and to consult with the Chief Executive of the Department about the matters to be
       included in the notice under Section 18 of the Planning Act; and
E.     Adopt the Draft Communications Strategy (Summary) as set out in Attachment 2 to the report
       in principle and request that Chief Executive Officer provide a further report to the Council
       regarding a detailed community consultation activities plan at the time the Council re-
       considers the draft planning scheme following the first state interest review.

Finance & Risk
Council is likely to incur a cost of nearly $3 million in the preparation of the New Noosa Plan. The
risk of not having an appropriate plan setting out future land use and development forms is
unacceptable to Council and the community. This substantial expenditure is primarily associated
with undertaking extensive investigations to update key technical and background information that
directly feeds into the new plan and the engagement of additional project staff.

Consultation
External Consultation - Community & Stakeholder
The Department of State Development, Manufacturing, Infrastructure and Planning (formerly
Infrastructure, Local Government and Planning) has been regularly consulted about preparing the
New Noosa Plan.
Internal Consultation
A Project Working Group of staff was formed to give occasional feedback to the process. A
separate Working Group was formed to oversee the new local government infrastructure plan.
A significant number of workshops have been held (more than 30) with Councillors regarding all
key aspects of the Draft Noosa Plan over the past 16 months.

Departments/Sections Consulted:

X    Chief Executive Officer   X   Community Services                          Corporate Services
     Executive Officer             Community Development                       Financial Services
     Executive Support             Community Facilities                        ICT
                                   Libraries & Galleries                       Procurement & Fleet
                                   Local Laws                                  Property
                                   Waste & Environmental Health                Revenue Services

     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service          X   Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                             Page 6 of 33

Section 7

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 7 of 33

SPECIAL MEETING AGENDA                                                                            29 MAY 2018

     Community Engagement Strategy

                                                                                                 ATTACHMENT 1
 Project Name               The New Noosa Plan
 Date                       21 May 2018
 Department                 Environment & Sustainable Development      Branch         Strategic Land Use Planning
 Contact                    Noosa Plan Project Support Officer
 Target start date    Mid September 2018                       Target finish date | Mid December 2018
                      (Subject to State review)                                    (Subject to State review)
 Project Description
 A planning scheme is a plan prepared by local government that sets out the long term planning intent for the local
 government area and regulates land use and development. It aims to provide certainty to the community about how the
 local government area will develop in the future and over the life of the plan.

 The Planning Act 2016 requires all Local Governments in Queensland to review a planning scheme every ten years and
 decide whether to make a new planning scheme. The current planning scheme (The Noosa Plan) which came into effect in
 2006 is now 12 years old and requires a comprehensive review. The New Noosa Plan will set out the strategic directions
 for Noosa’s development to 2041.

 The New Noosa Plan project has six stages as follows-
     1.  Prior preparation
     2.  Community consultation with a Discussion Paper
     3.  Drafting of New Noosa Plan
     4.  First State Interest Review
     5.  Community Consultation of draft plan
     6.  Second State Interest Review, Council adoption and commencement

     1.  Design - Project background
 The new Noosa Plan is required under state legislation as set out in the Planning Act 2016. |n addition it is desirable to
 re-engage the community about the future of development in Noosa as it is more than 12 years since Noosa Council has
 undertaken that process.

 Development of the New Noosa Plan is a significant project for Noosa Council and the Noosa community. It is a high
 profile multi-year project, with long-term implications. It is anticipated the project will be finalised by late 2019. As well
 as there being a statutory requirement to undertake consultation, there is an expectation by Council and the
 community for community engagement during the preparation of the New Noosa Plan. Input from the community is
 important to assist Council to develop a plan that appropriately captures the broad community’s values and their
 preferences towards development and new opportunities.

 The project includes community engagement at three stages of the project:
    Stage 2 - Discussion Paper (consult)
    Stage 5 - Draft Noosa Plan (consult)
    Stage 6 — Council adoption and commencement of New Noosa Plan (inform)

 The Discussion Paper stage was finalised in 2016. The Discussion Paper set out the key high-level policy approaches to
 guide the preparation of the New Noosa Plan and was made public for community consultation in late 2016. Feedback on
 the Discussion Paper was presented to Council in February 2017. Council resolved to consider the suggestions made by the

                                                                                                   Page 7 of 33

Section 8

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 8 of 33

SPECIAL MEETING AGENDA                                                                             29 MAY 2018

 community in drafting the New Noosa Plan.

 The New Noosa Plan is being prepared with involvement from the Queensland government and following endorsement of
 the draft by Council and the government it will be made available to the public for consultation purposes. Public release of
 the draft Noosa Plan is anticipated to commence in the last quarter of 2018. Although the minimum statutory period for
 consultation is 40 business days, it is Council’s intention to undertake consultation for a period of 60 business days.

 Adoption and commencement of the New Noosa Plan will be the final stage of the project and final engagement stage.

     2.  Design - Understand context & scope project
 Context
 Political
     e   It is desirable to commence and conclude the project within one term of Council. The next Council election will be
         held in March 2020.
     e   Given the reach within the community and various interest groups, the Noosa Plan will be of considerable interest
         and it is important to keep the community informed during the project.
     e   Changes to state legislation and state guidelines may impact on the New Noosa Plan project.
     e   State elections, have the potential to impact on the progress of the project due to ‘caretaker’ mode and/or change
         of government. This will need to be taken into consideration as the project progresses and relevant information
         provided through the engagement process. A state election was held in late 2017 and so there is limited prospect
         of another election event in the remaining life of the project.
 Economic
     e   The New Noosa Plan will take into consideration other strategies such as the Local Economic Plan and Centres
         Hierarchy and has benefitted from input from key business representatives and groups.
     e   The various interest groups within the business community are key stakeholders and are expected to actively
         participate in the principal community consultation stage.
     e   The New Noosa Plan will revise the zones and development standards for future business and industry land uses.
 Social
     e   The New Noosa Plan will take into consideration other strategies and studies such as the Social Plan, Housing
         Needs Assessment, and other relevant planning studies.
     e   The New Noosa Plan will address social issues such as housing choice, housing affordability, provisions for aged
         care and opportunities for additional education and health facilities.
 Technological
     e   New technology will be available for the legislated consultation requirements (T1 ePlan). This will be a different
         format to previous engagement and will enable easier access across the various components of the plan.
 Legal
     e   State legislation, including the Planning Act 2016, the Planning Regulation 2017, the State Planning Policy, the SEQ
         Regional Plan 2017 and state-prepared guidelines govern the preparation of the New Noosa Plan.
 Environmental
     e   Council is continuing to improve our knowledge of the environment and its processes. Council is undertaking a
         Climate Change Adaptation Strategy and has undertaken further study of biodiversity and natural hazards. The
         New Noosa Plan will be informed by the latest available information.
     e   Noosa Design Principles & Sustainability Principles will be referenced.
 Historical
     e   Local heritage has been recognised in the current Noosa Plan 2006 and these measures will be again considered in
         the New Noosa Plan.

                                                                                                   Page 8 of 33

Section 9

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 9 of 33

SPECIAL MEETING AGENDA                                                                              29 MAY 2018

 Community
     e   The Noosa community has a long history of activism aimed at protecting the values and character of Noosa.
         Around 50 years ago the community began to monitor environmental management and forms of development.
         The community’s participation in the preparation and review of the draft New Noosa Plan continues this
         longstanding tradition.

 Scope
 Community engagement at this stage of the project (stage 5) will be designed to consult with the whole community to gain
 feedback on the policy and content of the draft Noosa Plan. Activities already determined to be included are-
     e   The period of engagement being 4 weeks more than the required 40 business days,
     e   Pop-up stalls will be offered to the community in 8 locations throughout the Shire.
     e   A dedicated space in Tewantin has been chosen for displaying the New Noosa Plan with staff available to talk to
         every day of the consultation period.
     e   Owners of property with significant change to entitlements will be directly advised.
     e   Briefings to particular stakeholder groups.
 Additional engagement activities are nominated in Section 5 below.

 Consultation on the New Noosa Plan will be supported by additional background information including Council and
 Queensland government endorsed strategies, plans, policies and studies.

 Stage 6 of the project will be focussed on informing community and stakeholders of the New Noosa Plan’s adoption and
 commencement.

     3.  Design - Project Purpose

     e   The statutory obligations of the Planning Act 2016 and Minister’s Guidelines and Rules are met
     e   The community is engaged and actively takes part in the New Noosa Plan process
     e   Meaningful feedback is received from the community and stakeholders on the New Noosa Plan
     e   Asense of ownership/interest around the New Noosa Plan is held amongst the community
     e   The community is aware they are being heard by providing responses (and changes if appropriate) to
         community feedback
     e   The community and stakeholders are informed of the New Noosa Plan’s commencement

     4.  Design
 Direct communication will be made to inform internal and external stakeholders about the consultation opportunities with
 the New Noosa Plan.

 External key stakeholders
  Interest                                   Stakeholder
  State planning policies                    State agencies
                                             Adjoining LGA’s

  Business                                   Noosa Chamber of Commerce & Industry
                                             Noosaville Association
                                             Cooroy Chamber of Commerce
                                             Country Noosa

                                                                                                    Page 9 of 33

Section 10

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 10 of 33

SPECIAL MEETING AGENDA                                                                                  29 MAY 2018

 [                                           Hastings St Association
                                             Sunshine Coast Business Council
                                             Noosa Junction Association
                                             Tourism Noosa
                                             Create Noosa
                                             Innovate Noosa
                                             Sunshine Coast Creative Alliance

   Community / Environment                   Noosa Community Partnership Roundtable
                                             Northern Sunshine Coast Network (Human Services)
                                             Gubbi Gubbi / Kabi Kabi Traditional owners
                                             Noosa Residents and Rate Payers Association
                                             Noosa Biosphere Reserve Foundation Ltd
                                             Noosa Community Biosphere Association
                                             Noosa Parks Assoc.
                                             Noosa Integrated Catchment Association
                                             Noosa & District Landcare
                                             Healthy Land and Water
                                             Mary River Catchment Coordination Assoc Inc
                                             Heritage groups

   Development                               Architects
                                             Building Design Association
                                             Planning & Development Consultants
                                             Urban Development Institute Australia
                                             Property Council of Australia (Sunshine Coast Committee)
                                             Key property investors/holders

  Internal key stakeholders
       Stakeholder                           Interest
       Development Assessment Branch         New Noosa Plan
       Environment Branch                    Environment provisions
       Community Development                 Social provisions
       Waste & Environmental Health          Waste management
       Economic Development                  Business facilitation in accordance with the Local Economic Plan
       Community Engagement                  Community engagement
       Building & Plumbing                   Certain aspects regarding building works
       Infrastructure Planning & Design      Infrastructure provisions
       Asset Planning                        Infrastructure provisions
       Customer Service                      Community engagement strategy
       Property                              Provisions affecting Council property
       Councillors                           New Noosa Plan
       Council staff generally               New Noosa Plan

 Aboriginal and Torres Strait Islander communities
      e   Determining appropriate Council representatives who understand the social, cultural and political contexts.
      e  Ask Indigenous contacts how best to consult with them, including representatives of the Gubbi Gubbi / Kabi Kabi
 |       traditional owners.

                                                                                                       Page 10 of 33

Section 11

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 11 of 33

SPECIAL MEETING AGENDA                                                                              29 MAY 2018

     e   Organise a face to face meeting in an appropriate place.
     e   Provide a summary of planning scheme content as it relates to Indigenous interests — including cultural heritage,
         environmental protection and landscape values, important known sites.
     e   Give the Indigenous community enough time to participate.
     e   Be flexible and acknowledge that written responses may not be an appropriate way to capture feedback.

 Impacted areas
 e   The whole of the Noosa local government area.

     5.  Plan- Components and sequence
 Project Stage 5 — draft New Noosa Plan — Community engagement
 Internal Methods — Consult/Collaborate
     e   Home page intranet
     e   Staff newsletter
     e   Emails directly to all branches listed in part 4 above (including Executive Office/Councillors) tailored to their
         particular interests
     e   Personal briefings for Councillors and teams as requested
     e   Project Working Group

 External Methods — Consult
     General Notification to Community
     Formal public notice in local paper
     Media release(s)
     Home page on Council’s internet site
     Dedicated page on Council’s internet site
     Outline on Your Say Noosa site
     Noosa Council Facebook
     Static display of public notice, posters, and explanatory statements at dedicated premises adjacent to Council
     Chambers, Cooroy Library and Noosaville Library
     Series of explanatory statements (facts sheets) around topics

     Targeted Notification to Community
     Direct mail out/email to certain property owners affected by zone or overlay changes (in circumstances of significant
     change)
     Direct mail out/email to people who made a submission to the Discussion Paper
     Direct mail out/email to database of consultants, building certifiers, designers etc
     Direct emails to external key stakeholders as listed in Section 4 above
     Brief Professional Advisory Group
     Brief Business Advisory Group
     Social forum
     Environment forum

     Assistance with Interpreting and Submitting
     Interactive Mapping/ ePlan online planning tool
     Your Say Noosa as well as a dedicated page on Council’s web page.
     Dedicated shopfront in Pelican Place in Pelican Street, Tewantin with staff available to advise on the New Noosa Plan
     during business hours

                                                                                                   Page 11 of 33

Section 12

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 12 of 33

SPECIAL MEETING AGENDA                                                                            29 MAY 2018

     Pop —up ‘talk to a planner’ information kiosks at 8 locations (Kin Kin, Cooran, Pomona, Cooroy, Boreen Point,
     Noosaville, Noosa Junction, Peregian Beach)
     Hard copy documents at the libraries and Pelican Place for accessibility by users uncomfortable with computers.
     Extensive explanatory material on using/ navigating the scheme, on particular key messages and snapshots on the local
     area plans.
     Direct email address for enquiries on and submissions to the draft New Noosa Plan

     Feedback to Submitters
     Initial acknowledgement
     Responses to submitters informing outcome of submission consideration

 Project Stage 6 — Adoption and commencement - 2 weeks for notification and information
 Methods for informing
     e   Inform through Your Say Noosa on outcomes, where to find information etc.
     e   Media Releases
     e   Launch activities
     e   Direct mail out as required
     e   Industry briefings and training (eg consultants, building designers, real estate agents)
     6.  Manage — Deliver, monitor response and establish success metrics
 The New Noosa Plan’s engagement success can be measured by:
     e   media articles about the Noosa Plan
     e   number of submissions received
     e   content of community feedback
     e   meeting legislative requirements
     e   meeting community expectations/aspirations -from submissions received (Stages 2 and 5) and Council’s decisions
         in response
     e   approval by the State and adoption by Council in a timely manner
     e   other feedback from the community about the adequacy of the engagement process.
     7.  Databases used and file location
 N:\07 Planning\19 Strategic Planning\New Noosa Plan 2016\Community Engagement.
 ECM\Project and Contract Index\PSR — 01 Noosa Plan Review 2016 Consultation / Community Engagement & Feedback
 (and relevant sub folders/ activities).
     8.  Expected media required
 It is expected that a variety of media will be required at the different stages of the project as highlighted above. The
 Planning Scheme Project Manager will work with the corporate Community Engagement team to develop these prior to
 commencement of each stage.
     9.  Closing the gap
 For the formal consultation process, submitters will initially receive a brief acknowledgement but following Council
 consideration of their submission they will receive detail of the consideration of the matter(s) and what, if any, changes are
 being made as a result of the submission.

                                                                                                 Page 12 of 33

Section 13

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 13 of 33

SPECIAL MEETING AGENDA                                                                               29 MAY 2018

            Figure 1. IAP2 Diagram: Set Purpose

            This diagram is useful at the outset of a Community Engagement Project to help ensure that all the
            essential steps are covered to avoid wasting time later or making mistakes.

                             Start here

                                                       Scope project —
                               Understand context —    what is in scope
                                 consider historical   and what is out,
                             political, social, economic, parameters       Understand people
                                  environmental,                          — understand
                                echnological contexts                      people and
                                                                          stakeholders

               Debrief, review,                                                           sta) eae i
                    learn

                                                              Design
                                                                                             Shape influence — identify
                                                                                             roles and influence of
                                                                                             groups and individuals.
      Evaluate                                                                                Fig.2
                                   Manage                                                    (Fie2)

                                                                                              Secure leadership
                                                                                              Commitment

          Monitor response

                     Deliver                                                            Plan engagement
                                                                                            sequence

                               Resources
                                                                      Select method/s
                                                 Relationships

                                                                                                    Page 13 of 33

Section 14

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 14 of 33

SPECIAL MEETING AGENDA                                                                      29 MAY 2018

             Figure. 2. IAP2 Diagram: Stakeholder Groups — Levels of Impact and Interest

            This diagram helps when developing an understanding of which groups and individuals require most
            communicating with and engaging with to have a successful project.

            Where there is a low level of interest, but the impact of Councils decisions will be high, creative
            thinking will be required to ensure that these groups or individuals are reached during the
            consultation.

High
Impact

Low
impact

      Low Interest                                                                             High Interest
                                   ss>s)iiznngtgg gg

                                                                                           Page 14 of 33

Section 15

SPECIAL MEETING AGENDA                                                                                        29 MAY 2018


2                        LOCAL GOVERNMENT INFRASTRUCTURE PLAN (FOR ADOPTION)
DOCUMENT INFORM AT ION




Author                              Infrastructure Assessment Coordinator, Oddbjorn Ludvigsen
                                    Environment and Sustainable Development Department

Index                               ECM/ Subject/ Local Government Infrastructure Plan (LGIP); and
                                    Subject / LGIP Reviews (Independent / State / Community)

Attachments                         1.    LGIP Second Compliance Checklist
                                    2.    LGIP Second Compliance Report
                                    3.    Minister’s Letter dated 17 May 2018 - LGIP Approval
                                    4.    Noosa LGIP (v2) – Council Adoption      (Note: Attachment 4 is provided
                                          separately to this report - electronic USB copies provided to Councillors)



EXECUTIVE SUMMARY
This report presents the final step required for Council to complete the legislative process to
amend its current Priority Infrastructure Plan (PIP) to an adopted Local Government Infrastructure
Plan (LGIP) by 30 June 2018 to continue issuing infrastructure charges and impose conditions for
trunk infrastructure on development.
RECOMMENDATION
That Council note the report by the Infrastructure Assessment Coordinator to the Special Meeting
dated 29 May 2018 regarding the Local Government Infrastructure Plan and:
A.                       Adopt the Local Government Infrastructure Plan (LGIP) (v2) (provided at Attachment 4 to the
                         report) to replace the Priority Infrastructure Plan (PIP) of The Noosa Plan 2006 to commence
                         on 8 June 2018; and
B.                       Request the Chief Executive Officer to complete the remaining processes required in
                         accordance with Stage 4 – Adoption, Step 8 of the Statutory Guideline 01/16 “Making and
                         amending local planning instruments”.


REPORT
At the Special Meeting of 26 April 2018, Council resolved to proceed with the LGIP amendment
version (v2) that was released for public consultation with no significant change other than one
minor typographical correction. The remaining actions from Council’s resolution were completed as
follows:
 The proposed LGIP (v2) was provided to the Appointed Independent Reviewer to undertake a
   second compliance check with final supplementary documentation provided on Friday 27 April
   2018.
 Council received the Appointed Independent Reviewer’s second compliance checklist
   (Attachment 1) and second compliance report (Attachment 2) on Friday 27 April 2018.
 On Monday 30 April 2018, the CEO wrote to the Minister for State Development,
   Manufacturing, Infrastructure and Planning requesting approval for Council to adopt the
   proposed LGIP (v2) amendment to the Noosa Plan 2006. The final proposed LGIP (v2) with all
   supplementary documentation was provided electronically to the Minister and uploaded onto
   the Department’s “ePlan Portal”. An electronic copy was also provided to the Manager
   (Planning) of the Department’s Maroochydore office.
 On Tuesday 1 May 2018, all submitters were advised and provided with full details of Council’s
   decision to proceed with the proposed LGIP.

                                                                                                             Page 15 of 33

Section 16

SPECIAL MEETING AGENDA                                                             29 MAY 2018


Council has now received the Minister’s approval dated 17 May 2018 (Attachment 3) allowing
adoption of the LGIP (v2) amendment to replace the current PIP of The Noosa Plan 2006.
Staff recommend that Council adopt the LGIP (v2) (Attachment 4) amendment and complete the
remaining processes required in accordance with Stage 4 – Adoption, Step 8 of the Statutory
Guideline 01/16 “Making and amending local planning instruments”.

Previous Council Consideration
Ordinary Meeting, 28 August 2014, Item 5, Page 9
That Council note the report by the Infrastructure Assessment Officer to the Planning &
Organisation Committee Meeting dated 19 August 2014 and:
A.   Resolve to undertake an amendment to the Priority Infrastructure Plan in accordance with
     the recent amendments to the Sustainable Planning Act 2009 and corresponding new
     Statutory Guideline 03/14;

Ordinary Meeting, 21 July 2016, Item 9, Page 8
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 12 July 2016 and approve the Priority Infrastructure Area
(PIA) Maps provided at Attachment 1 for the proposed Local Government Infrastructure Plan
(LGIP) to replace the current Priority Infrastructure Plan (PIP) of the current Noosa Plan planning
scheme.

Ordinary Meeting, 15 December 2016, Item 5, Page 4
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 6 December 2016 and;
A.   Approve the Planning Assumptions contained in the report and provided in Attachments 1, 2
     and 3 for proceeding with the new Local Government Infrastructure Plan (LGIP) of the
     current Noosa Plan planning scheme;
B.   Note a future report to Council may be presented to adjust population and development
     projections in Attachment 3 if any major discrepancies are discovered following completion of
     the staff final review of the supporting DMaTT GIS output data; and
C.   Request the CEO to write to Unitywater thanking their staff in providing the DMaTT
     population and development data for use in Council’s LGIP and to commit Council’s ongoing
     support and assistance in future DMaTT updates.

LGIP Workshop held on 19 January 2017

Ordinary Meeting, 16 February 2017, Item 5, Page 4
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 7 February 2017 and approve the Desired Standards of
Service (DSS) for the Public Parks and Land for Community Facilities network provided in
Attachment 2 for proceeding with the new Local Government Infrastructure Plan (LGIP) under The
Noosa Plan 2006.

Ordinary Meeting, 16 February 2017, Item 6, Page 4
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 7 February 2017 and approve the Desired Standards of
Service (DSS) for the Transport network provided in Attachment 1 for proceeding with the new
Local Government Infrastructure Plan (LGIP) under The Noosa Plan 2006.

                                                                                  Page 16 of 33

Section 17

SPECIAL MEETING AGENDA                                                             29 MAY 2018


Ordinary Meeting, 20 April 2017, Item 3, Page 3
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 11 April 2017 and approve the Desired Standards of
Service (DSS) for the stormwater network provided in Attachment 1 for proceeding with the new
Local Government Infrastructure Plan (LGIP) under The Noosa Plan 2006.

Ordinary Meeting, 18 May 2017, Item 1, Page 6
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 9 May 2017 regarding the review of the Public Parks and
Land for Community Facilities network required for the new Local Government Infrastructure Plan
(LGIP) under The Noosa Plan 2006 and:
A.   Approve the Plans for Trunk Infrastructure (PFTI) Maps provided in Attachment 3 to the
     report;
B.   Approve the Schedule of Works (SOW) provided in Attachment 2 noting that the cost
     estimates may be refined following completion of the excel SOW Model; and
C.   Note that further amendments will be made to the SOW and incorporated in a subsequent
     LGIP to be prepared for the new Planning Scheme that reflects Council’s adopted Sport and
     Active Recreation Plan and Recreation Parks Plan.

Ordinary Meeting, 20 July 2017, Item 6, Page 7
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 11 July 2017 regarding the review of the Stormwater
network required for the new Local Government Infrastructure Plan (LGIP) under The Noosa Plan
2006 and approve:
A.   The Plans for Trunk Infrastructure (PFTI) Maps provided in Attachment 2 to the report noting
     the service catchments being limited to the Priority Infrastructure Area (PIA) area for
     preparing the SOW model;
B.   The Stormwater Network Future Projects for including in the LGIP Schedule of Works(SOW)
     provided in Attachment 1 noting that the base costs estimates will be refined following
     completion of the excel SOW Model; and
C.   Note that further amendments will be made to the SOW and incorporated in a subsequent
     LGIP to be prepared for the new Planning Scheme that reflects Council’s further network
     planning.

Ordinary Meeting, 20 July 2017, Item 7, Page 8
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 11 July 2017 regarding the review of the Transport network
required for the new Local Government Infrastructure Plan (LGIP) under The Noosa Plan 2006 and
approve:
A.   The Plans for Trunk Infrastructure (PFTI) Maps provided in Attachment 2 to the report noting
     that the locality sub-catchments will be combined into two larger transport catchments for the
     Noosa Coastal Area and the Noosa Hinterland Area when preparing the SOW model;
B.   The Transport Network Future Projects for including in the LGIP Schedule of Works(SOW)
     provided in Attachment 1 noting that the base costs estimates will be refined following
     completion of the excel SOW Model; and
C.   Note that further amendments will be made to the SOW and incorporated in a subsequent
     LGIP to be prepared for the new Planning Scheme that reflects Council’s further network
     planning.

                                                                                  Page 17 of 33

Section 18

SPECIAL MEETING AGENDA                                                               29 MAY 2018


Ordinary Meeting, 21 September 2017, Item 8, Page 7
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 12 September 2017 regarding the remaining requirements
for the Schedule of Works (SOW) Model for the new Local Government Infrastructure Plan (LGIP)
under The Noosa Plan 2006 and approve:
A.   The methodology used to determine existing trunk infrastructure network items from
     Council’s Geographic Information System (GIS) and current replacement costs obtained from
     Council’s Financial Asset Register;
B.   The Generic Land Valuation prepared by CBRE Valuations Pty Limited dated February2012
     provided in Attachment 1 to the report and indexed to the LGIP June 2014 base date as the
     basis for applying a uniform generic land cost in the Schedule of Works Model (SOW) for all
     existing and future land;
C.   A minor amendment to the Schedule of Works (SOW) future items for the Public Parks&
     Land for Community Facilities Network provided in Attachment 2 to the report noting that the
     cost estimates will be refined following completion of the excel SOW Model;
D.   The LGIP Briefing Note provided in Attachment 3 to the report providing the basis for the
     Infrastructure Network Demand Assumptions and Conversions; and
E.   Note that following completion of the SOW model, draft LGIP and Independent Reviewer’s
     first review, a further report on the complete draft LGIP will be presented for Council’s
     consideration and adoption to proceed to the Minister’s first State review.

Ordinary Meeting, 16 November 2017, Item 3, Page 4
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 7 November 2017 and:
A.   Resolve to amend the planning scheme for the Shire of Noosa in accordance with the
     proposed LGIP amendment as outlined in the report; and
B.   Request the Chief Executive Officer to:
     i.     Write to the Minister for Infrastructure and Planning requesting a review of the
            proposed draft LGIP and the Minister’s approval to commence public consultation on
            the proposed amendment;
     ii.    Make amendments to the draft LGIP if required by the Minister to gain approval; and
     iii.   Proceed to public consultation of the draft LGIP on receiving the Minister’s approval.

Special Meeting, 26 April 2018, Item 1, Page 2
That Council note the report by the Infrastructure Assessment Coordinator to the Special Meeting
dated 26 April 2018 regarding the Local Government Infrastructure Plan (Review of Submissions)
and:
A.   Adopt the staff review and recommendations contained in Attachment 2 to the report as
     Council’s consideration of submissions on the proposed Local Government Infrastructure
     Plan (LGIP) received during the public consultation period from 6 March to 18 April 2018;
B.   Proceed with the LGIP amendment version (v2) that was released for public consultation with
     no significant change other that one minor typographical correction to “Table 15.5 List of
     extrinsic material” to reflect the correct version “Ext.11-1_Network Demand Calcs_v2.zip” as
     provided during public consultation;
C.   Advise submitters of Council’s decision to proceed with the proposed LGIP in accordance
     with items A and B above;


                                                                                    Page 18 of 33

Section 19

SPECIAL MEETING AGENDA                                                                   29 MAY 2018


D.     Engage the Appointed Independent Reviewer to conduct a second compliance check of the
       proposed LGIP (v2) in accordance with the statutory guideline for LGIP’s; and
E.     On receiving the Appointed Independent Reviewer’s completed checklist and written
       statement, request the Chief Executive Officer to write to the Minister for State Development,
       Manufacturing, Infrastructure and Planning requesting approval for Council to adopt the
       proposed LGIP (v2) amendment to the Noosa Plan 2006.

Finance & Risk
Council needs to amend its current Priority Infrastructure Plan (PIP) to a Local Government
Infrastructure Plan (LGIP) by 30 June 2018 to continue issuing infrastructure charges and impose
conditions about trunk infrastructure on development.
Since January 2014 to April 2018, $9,880,023 has been collected in infrastructure charges
equating to a current average of $190,000 per month or $2,280,005 per annum. The 2017/2018
budget infrastructure charges revenue is estimated at $1,867,359.
A long term risk of LGIPs is the commitment ultimately made to provide future infrastructure at the
desired standards of service to meet development growth.

Consultation
External Consultation - Community & Stakeholder
Integrated Infrastructure Planning (Independent Reviewer)
Internal Consultation
Strategic Land Use Planning
Departments/Sections Consulted:

     Chief Executive Officer       Community Services                      Corporate Services
     Executive Officer             Community Development                   Financial Services
     Executive Support             Community Facilities                    ICT
                                   Libraries & Galleries                   Procurement & Fleet
                                   Local Laws                              Property
                                   Waste & Environmental Health            Revenue Services

     Executive Services        X   Environment & Sustainable Development   Infrastructure Services
     Community Engagement          Building & Plumbing Services            Asset Management
     Customer Service          X   Development Assessment                  Buildings and Facilities
     Governance                    Economic Development                    Civil Operations
     People and Culture            Environmental Services                  Disaster Management
                               X   Strategic Land Use Planning             Infrastructure Planning,
                                                                           Design and Delivery




                                                                                        Page 19 of 33

Section 20

Page 20 of 33

ATTACHMENT 1
 Appendix D—LGIP Checklist — Noosa Shire Council
 Appendix D is part of Statutory Guideline 03/14 — Local government infrastructure plans
 Review principles:
  ©  Areference in the checklist to the LGIP Template is taken to include a relevant reference to the SPA, statutory guideline for LGIPs,
     statutory guideline for MALPI or the Queensland Planning Provisions (QPP).
  _Compliance requirements are not limited to the requirements listed in the checklist.
                                                                                                            |
LGIP         LGIP               Number | Requirement                                                  L               1                Compliant | Justification                Corrective action         Recommendation
 guideline  | component                                                                          7                                    (yes/no)                                  description
 outcome
 The LGIP is                              The LGIP sections are ordered in accordance                  !                                            The sections are consistent | No action required.     Complies
consistent                                with the LGIP template.                                                                                   with the LGIP guideline
 with the                                                                                                                                           template.
 legislation
 and
 statutory
 guideline
 for LGIPs                                                                                             ;

                                          The LGIP sections are correctly located in the                1c LG                                       The sections are consistent | No action required.     Complies — review underway.
                                          planning scheme.                                                                                          with the LGIP guideline
                                                                                                                                                    template. Council will
                                                                                                                                                    update the location ofthe
                                                                                                                                                    LGIP with the new planning
                                                                                                                                                    scheme.

                                          ‘The content and text complies with the                                                                   The LGIP contains all       No action required.       Complies
                                          mandatory components of the LGIP                                                                          mandatory content.
                                          template.
                                          Text references to numbered paragraphs,                                                                   The LGIP correctly          No action required.       Complies
                                          tables and maps are correct.                                                                              references tables and
                                                                                                                                                    maps.
             Definitions                  Additional definitions (to those in the QPP)                                                              The additional definition is | No action required.    Complies
                                          do not conflict with statutory requirements.                         $                                    consistent with QPP.

                                                                                                                                                                                                                 Page 20 of 33

Section 21

Page 21 of 33

Preliminary                   The drafting of the Preliminary section is                                                                    ‘The preliminary section is__| No action required.     Complies
section                       consistent with the LGIP template.                              1                                             consistent with the
                                                                                                                                            template.

                       re     All five trunk networks included in the LGIP.                                {                                The exclusion of waterand | No action required.        Complies
                              Ifnot, which networks are excluded?                                                rt &     C                 sewer is consistent with the
                              Why have these networks been excluded?                                                                        distributor-retailer
                                                                                                                  :                         arrangements.

Planning                      The drafting of the Planning assumptions              ;          :                                            The planning assumptions | No action required.         Complies
 assumptions -                section is consistent with the LGIP template.                   ble:        h                                 section is consistent with
 structure                                                                                                         5                        the template except for the
                                                                                                         i           /                      planned density table,
                                                                                                    ;                ’                      which has been split into
                                                                                                 F      r                                   two to provide more
                                                                                                                0                           comprehensive
                                                                                                       ;       mat                          information.

                              All the projection areas listed in the tables of                                         the                  ‘The projections areas are   No action required.        Complies
                              projections are shown on the relevant maps                                                                    shown on a map.
                              and vice versa.                                                            L

                              All the service catchments listed in the                                                                      ‘The service catchments are | No action required.       Complies
                              tables of projected infrastructure demand                          |         F          é                     shown on the relevant PFT
                              are identified on the relevant PFT maps and                    \                          :                   map series,
                              vice versa.                                                       S

                                                                                                                                                                                                               Page 21 of 33

Section 22

Page 22 of 33

Planning                      The population and dwelling projections                                                                       The total populations are    No action required.        Complies
 assumptions -                reflect those prepared by the Qld                                                                             consistent with the QGSO
methodology                   Government Statistician (as available at the                        p                                         medium series as detailed
                              time of preparation).                                                                                         in Queensland Government
                                                                                                                                            population projections,
                                                                                                                                            2015 edition and 2016 ABS
                                                                                                                                            census data.

                       12. | The employment and non-residential                                                1                            Employment projections       No action required.        Complies
                              development projections align with the                                                                        are consistent with ABS
                              available economic development studies,                             p                                         census proportions.
                              other reports about employment or                                         r
                              historical rates for the area.                                            i

                       13. | The developable area excludes all areas                             levelopab                                  Hooding constraints are      No action required.        Complies
                              affected by absolute constraints such as                                        h                             removed as stated in the
                              steep slopes, conservation and flooding.                                                                      planning assumption
                                                                                               du                        j                  methodology extrinsic
                                                                                                        I                                   material document.

                              ‘The planned densities reflect realistic levels                                                Yes            Densities are consistent     No action required.        Complies
                              and types of development having regard to                                   '                                 with the anticipated uses in
                              the planning scheme provisions and current                                      [                             accordance with the
                              development trends.                                                                                           Planning Scheme
                              ‘The planned densities account for land                         C                                             Densities are consistent     No action required.        Complies
                              required for local roads and other                                                                            with the anticipated uses in
                             infrastructure.                                                    1    er]     rT                             accordance with the
                                                                                                   Is ai                                    Planning Scheme allowing
                                                                                                            e                               for local infrastructure
                                                                                                 al                                         footprints.
                              The population and employment projection                       It       1                                     Ultimate capacity is stated | No action required.       Complies
                              tables identify “ultimate development” in                        :                                            in planning assumptions.
                              accordance with the QPP definition.                                  p            re

                       17. | Based on the information in the projection                                                      Yes            The difference between the | No action required.        Complies
                              tables and other available material, it is                                                                    Ultimate and 2031
                              possible to verify the remaining capacity to                                                                  projections provide an
                              accommodate growth, for each projection                                                                       indication of available
                            area.                                                            \              p                               capacity in each projection
                                                                                                ple «              f                        area.

                                                                                                                                                                                                            Page 22 of 33

Section 23

Page 23 of 33

The planning assumptions reflect an                                                                  ‘The planning assumptions | No action required.    Complies
efficient, sequential pattern of                                                                     are based on the
development.                                                                                         infrastructure priorites and
                                                                                                     development propensity
                                                                                                     derived in DMaTT.

Has the Department of Transport and main                                                             Evidence of consultation  No action required.     Complies
Roads or any relevant distributor-retailer                                                           has been provided.
been consulted in the preparation of the
LGIP?
What was the outcome of the consultation?

                                                                                                                                                                 Page 23 of 33

Section 24

Page 24 of 33

Planning                     The infrastructure demand projections are                                                                The demand for all          No action required.       Complies
 assumptions -               based on the projections of population and                                                               networks have been
 demand                      employment growth.                                                                                       developed from the
                                                                                                                                      planning assumptions.

                             The demand generation rates align with                                                                   The demand generation       No action required,       Complies
                             accepted rates and/or historical data.                                                                   rates are consistent with
                                                                                                                                      the guideline, except for
                                                                                                                                      Parks and Land for
                                                                                                                                      Community Facilities which
                                                                                                                                      is in population which is
                                                                                                                                      considered appropriate
                                                                                                                                      when compared with
                                                                                                                                      industry standards. The
                                                                                                                                      ha/ 1000 standard is stated
                                                                                                                                      in Table 15.9 of the LGIP
                                                                                                                                      and is therefore available.
                      22. | The service catchments used for                                                                           ‘The service catchments are | No action required.     Complies
                             infrastructure demand projections are                                                                    shown on cach networks’
                             identified on relevant PFTI maps and                                                                     maps, and these
                             demand tables.                                                                                           catchments are consistent
                                                                                                                                      with the demand tables.

                      23. | The service catchments for each network                                                                   The service catchments      No action required.       Gmplies
                             cover, at a minimum, the PIA                                                                             cover the PIA

                             The Asset Management Plan and Long Term                                                                  Council has undertaken to | No action required.      Complies — process underway
                             Financial Forecast align with the LGIP                                                                   develop longer term plans
                             projections of growth and demand.                                                                        including LIFF and AMPs.
                             Ifnot, is there a process underway to
                             achieve this?

Priority              25. | The drafting of the PlAsection is consistent                                                              ‘The section is consistent  No action required.      Complies
infrastructure               with the LGIP template.                                                                                  with the LGIP guideline
 area (PIA)                                                                                                                           template.

                                                                                                                                                                                                   Page 24 of 33

Section 25

Page 25 of 33

27. | The PlAboundary shown on the PlAmap is        Y                                 i             Yes            The PlAboundary is legible | No action required.      Complies
                             legible at a lot level and the planning                                                                      at the lot level, on a base of
                             scheme zoning is also shown on the map.                                                                      the planning scheme zones.
                             The PlAincludes all areas of existing urban                  |          j                                    The PlAboundary is Iegible | No action required.      Complies
                             development serviced by all relevant trunk                    \          [A& all                             at the lot level, on a base of
                             infrastructure networks at the time the LGIP                  i                york      :                   the planning scheme zones.
                             was prepared.                                                        nts  Co!     i
                             The PlAaccommodates growth for at least                         ie pl     as                  Yes            The planning assumptions | No action required,        Complies
                              10 years but no more than 15 years.                                        h                                show there is capacity in
                                                                                              )                  \                        the PIAto 2031 allowing for
                                                                                           2    :                                         10-15   years’ growth.
                             Are there areas outside the PIA for which       de               inor           ‘grov                        There is no significant     No action required.       Complies
                             the planning assumptions identify urban                                      ype sei                         urban growth identified
                             growth within the next 10 tolS years?                             stri      :                                outside the PIA.
                             If so, why have these areas been excluded                              }    is. H   ‘
                             from the PIA?                                                        i     1       all  tot:

                       31. | The PlAachieves an efficient, sequential                                                                     Provision of infrastucture  No action required.       Complies
                             pattern of development.                                                           hat is to                  within the PlA achieves an
                                                                                             p                                            efficient pattern of
                                                                                                i                                         development.
Desired                      ‘The drafting of the DSS section is consistent                      SS has |       i                         ‘The section is consistent  No action required.       Complies
 standards of                with the LGIP template.                                                 1     e te                           with the LGIP guideline
 service (DSS)                                                                                                             |              template.
                       33, | The DSSsection states the key planning and      :               ie  DSS:       ntain          Yes            The DSS section outlines    No action required,       Complies
                             design standards for each network.                                    :     {      le                        the key planning and
                                                                                             ch net                                       design standards.

                             The DSS reflects the key, high level industry                       Sare         nt W                        The DSS are consistent with | No action required.     Complies
                             standards,    regulatory   and __ statutory                                                                  industry standards.
                             guidelines and codes, and planning scheme                       rastr         p
                             policies about infrastructure.                                               on:    it wi

                             There is alignment between the relevant |      Yes (Part!                          ;                         Council has undertaken to | No action required.       Complies — process underway
                             levels  of service   stated  in  the  local                                    from:                         long term LIFF and AMPs.
                             government's Long Term Asset Management                               C      %e  gio
                             Plan (LTAMP) and the LGIP.
                             Ifnot, is there a process underway to                         As such
                             achieve this?                                                      ;             19

 Plans for trunk             The drafting ofthe PFTI section is consistent | Yes               s          !                               The section is consistent   No action required,       Complies
infrastructure               with the LGIP template.                                          ;                                           with the LGIP guideline
 (PFT) —                                                                 |                                                                template.

                                                                                                                                                                                                          Page 25 of 33

Section 26

Page 26 of 33

structure and         37. | PFIl maps are identified for all networks       3                           :              tal               Mapping exists for all       No action required.       Complies
 text                        listed in the Preliminary section,                              ;          1         ,                       networks.

                             PFI] schedule of works summary tables for                         fl                tab!                     ‘The section includes        No action required.       Complies
                             future infrastructure are included for all                     ave be      epared fo                         schedules of work for each
                             networks listed in the Preliminary section.                     frastructur   wi                             network.

 PFTI— Maps                  The maps ckarly identify the existing and     4                                   )   dist}    Yes           Mapping exists for all       No action required.       Complies
 [Add rows to the            future trunk infrastructure networks distinct                      ;           |                             future and existing
 checklist to                from cach other.                                                                     n                       networks.
 address these                                                                                        ;
 items for each              The service catchments referenced in the                                                       Yes           Mapping exists for all       No action required.       Complies
 of the networks]            SOW model and infrastructure demand                                        pont         1                    future and existing
                             summary tables are shown clearly on the                                 :         W   model i                networks.
                             maps.                                                             Sto

                             Future trunk infrastructure components are                                                                   The future trunk             No action required.       Complies
                             identified (at summary project level) clearly                       ts ar                                    infrastructure projects are
                             on the maps including a legible map                                wi                                        shown on each networks’
                            reference.                                                     n                                              maps.
                             The infrastructure map reference is shown = |                  1     ‘ast     r      item                    Aunique identifier exists    No action required.       Complies
                             in the SOW model and summary schedule of                                      cluded in t                    on the maps, in the model
                             works table in the LGIP.                                        2        wo!       les                       and in the schedule of
                                                                                              \                                           works.
 Schedules of          43, | The schedule of works tables in the LGIP                       l    HP          h                            The section is consistent    No action required,       Complies
works                        complies with the LGIP template.                                                                             with the LGIP guideline
 ‘Add rows to the                                                                                                           |             template.

                                                                                                                                                                                                         Page 26 of 33

Section 27

Page 27 of 33

checklist to                The identified trunk infrastructure is                                                      Yes           ‘The infrastructure         No action required.      Complies
address these               consistent with the SPAand LGIP guideline.                                                                identified appears
items for each                                                                                                                        consistent with the LGIP
of the networks]                                                                                                                      guideline.

                     45. | The existing and future trunk infrastructure                                                               ‘The existing and future   No action required.       Complies
                            identified in the LGIP is adequate to service                                                             trunk infrastructure
                            at least the area of the PIA                                                                              projects shown on cach
                                                                                                                                      networks’ maps appear to
                                                                                                                                      service the PIA

                            Is there alignment of the scope, estimated                                                                Council states the LGIP     No action required.      Complies — process underway
                            cost and planned timing of proposed trunk                                                                 aligns with the 5- year
                            capital works contained within the Schedule                                                               capital works program and
                            of Works and the relevant inputs of the                                                                   LIFF. Work is underway to
                            LTAMP and LIFF?                                                                                           align with longer term
                            Ifnot, is there a process underway to                                                                     plannning.
                            achieve this?

                     47. | The cost of trunk infrastructure identified n                                                              ‘The cost of infrastructure No action required,      Complies
                            the SOW model and schedule of works                                                                       has been prepared in
                            tables  is   consistent  with   legislative                                                               accordance with the LGIP
                            requirements.                                                                                             guideline.
SOW model                   The submitted SOW model is consistent with                                                                The modelis consistent      No action required.      Complies
                            the model included with the statutory                                                                     with the LGIP guideline
                            guideline for LGIPs.                                                                                      template.
                     49. | The SOW model has been prepared and                                                                        The SOW modethas been | No action required.          Complies
                            populated consistent with the statutory                                                                   prepared in accordance
                            guideline for LGIPs and its User manual for                                                               with the LGIP guideline,
                            the SOW model.

                                                                                                                                                                                                  Page 27 of 33

Section 28

Page 28 of 33

Extrinsic                    All relevant background studies and reports
material                     in relation to the preparation of the LGIP are
                             available and identified in the list of extrinsic
                             material in the LGIP guideline.

                                                                                                                                                                                                       Page 28 of 33

Section 29

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 29 of 33

SPECIAL MEETING AGENDA                              29 MAY 2018

                                               ATTACHMENT 2

  Second compliance check of
  Noosa Shire Council
  Local Government Infrastructure Plan

                      Prepared by:

          Integrated Infrastructure Planning

                        iC

        Version Date                Reviewer name
        1    27 April 2018  mp     LG
                                        Kylie Grimle y

                                                   Page 29 of 33

Section 30

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 30 of 33

SPECIAL MEETING AGENDA                                                           29 MAY 2018

   1.1  Introduction
  Inte grated Infrastructure Planning (IIP) has been engaged by Noosa Shire Council (‘Council’) to
  undertake a second compliance check ofits proposed Local Government Infrastructure Plan
   (LGIP ), after completion ofthe public notification phase. IIP also conducted the first compliance
  check.
  Inte grated Infrastructure Planning is required to:
   (1)  evaluate whether a proposed LGIP complies with the requirements outlined under the
        statutory guideline for making and amending planning instrument (MALPD) and Statutory
        guideline 03/14 — Local government infrastructure plans, including the LGIP template, the
        SOW modeland the LGIP Checklist;
   (2)  evaluate whether the proposed LGIP complies with the conditions imposed by the Minister
        after the first compliance check; and
   (3)  provide a written statement and the completed checklist to the local government detailing
        the findings of the compliance check.

   1.2  Scope exclusions
  The following items are outside the scope of this review:
   O    A verification of the accuracy of individual inputs used in the preparation ofan LGIP.
   O  = Areview of the local government’s Long Term Financial Forecast (LTFF) or asset
        management plan (LTAMP) other than to determine the extent of ther alignment with the
        LGIP.

                                                                                Page 30 of 33

Section 31

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 31 of 33

SPECIAL MEETING AGENDA                                                        29 MAY 2018

   1.3  Compliance check process
   The process used to undertake the second compliance check comprised the following steps:
   Sire teae          | Description
   Engaged              .    First compliance check completed October 2017.
                        .    Second compliance check review commenced on upon receipt
                             of several emails and attachments containing documents and
                             other supporting information from Infrastructure Assessment
                             Coordinator between 20 April and 26 April, 2018.
                        :    No additional information requested.

   Compliance check | *      Issued 27 April, 2018.
   review report

   The following local government personnel were involved in the compliance check:
   Name           Title               Date of           | Scope of communication
                                      communication(s)
   Oddbjorn       Infrastructure      20/4/18 (email)     *  Request to complete
   Ludvigsen       Assessment                                second compliance check
                   Coordinator
   Kerri Coyle    Manager,            26/4/18 (email)     *  Council report regarding
                   Development                               compliance check
                   Assessment

                                                                             Page 31 of 33

Section 32

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 32 of 33

SPECIAL MEETING AGENDA                                                           29 MAY 2018

   1.4  Compliance check findings
   The draft LGIP which was the subject of the first compliance check was not significantly
  modified as a result ofthe first state review as outlined in the Minster’s letter dated 1 March
  2018. The Council amended the LGIP to reflect the conditions prior to public notification.
   The NSC proposed LGIP has been publicly notified, durmg which time Council received five
   submissions. Officers undertook a review ofthe submissions but did not recommend any
   amendments to the LGIP. Officers did note one typographical correction as part of this review
   and this has been amended. Therefore, the LGIP not been amended as a result of public
  notification, except for one minor typographical change. Similarly, the content of checklist has
  not changed since the first compliance check.
   Conclusions

   The LGIP is compliant with the SPA and other sections of the Statutory Guideline.

   1.5  Recommendations
  IIP recommends to the Noosa Shire Council that the proposed LGIP should proceed to the
  Minister seeking approval for adoption.

   1.66 Recommended conditions to be imposed
   There are no outstanding issues or necessary conditions.

                                                                                Page 32 of 33

Section 33

SPECIAL MEETING AGENDA   29 MAY 2018




                         Page 33 of 33

SPECIAL MEETING AGENDA                                                                  29 MAY 2018

                                                                              ATTACHMENT 3
   ee        The Hon Cameron Dick MP
     ahs        4
   EP        Minister for State Development,
   comme     Manufacturing, Infrastructure and Planning

                                                                   1 William Street
                                                                   Brisbane QLD 4000
                                                                   PO Box 15009 City East
                                                                   Queensland 4002 Australia
                                                                   Telephone +617 3719 7200
                                                                   Email [email protected]
   Our ref: MC18/2357                                             www.dsdmip.qld.gov.au
  Your ref: LGIP (v2) Minister Review 2

       17 MAY 2018
  Councillor Tony Wellington
  Mayor
  Noosa Shire Council
  PO Box 141
  TEWANTIN QLD 4565
                               (i
  Dear Councillor Wellington   lony ,
  Thank you for the letter of 30 April 2018 from the Noosa Shire Council (council) seeking
  approval for the council to adopt its proposed Local Government Infrastructure Plan (LGIP).
  | congratulate council on achieving this significant milestone. Having an approved LGIP in
  place will ensure council continues to have the ability to levy charges or impose trunk
  infrastructure conditions on future development approvals.
  The proposed LGIP has been assessed against the requirements of the Sustainable Planning
  Act 2009 and for compliance with Statutory guideline 01/16: Making and amending local
  planning instruments and Statutory guideline 03/14: Local government infrastructure plans.
  | am pleased to advise | am satisfied the proposed LGIP complies with all statutory
  requirements and that council may now proceed to adopt the proposed LGIP.
  If you require further information, please contact Mr Garth Nolan, Manager, Planning and
  Development Services — SEQ North, Department of State Development, Manufacturing,
  Infrastructure and Planning, on (07) 5352 9710 or [email protected], who will
  be pleased to assist.
  Yours sincerely

  CAMERON DICK MP                /
  Minister for State Development, Manufacturing,
  Infrastructure and Planning

  CC:    Mr Brett de Chastel
         Chief Executive Officer
         Noosa Shire Council

                                                                                        Page 33 of 33

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.