2018-05-29 Special Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 21 of 33
Preliminary The drafting of the Preliminary section is ‘The preliminary section is__| No action required. Complies
section consistent with the LGIP template. 1 consistent with the
template.
re All five trunk networks included in the LGIP. { The exclusion of waterand | No action required. Complies
Ifnot, which networks are excluded? rt & C sewer is consistent with the
Why have these networks been excluded? distributor-retailer
: arrangements.
Planning The drafting of the Planning assumptions ; : The planning assumptions | No action required. Complies
assumptions - section is consistent with the LGIP template. ble: h section is consistent with
structure 5 the template except for the
i / planned density table,
; ’ which has been split into
F r two to provide more
0 comprehensive
; mat information.
All the projection areas listed in the tables of the ‘The projections areas are No action required. Complies
projections are shown on the relevant maps shown on a map.
and vice versa. L
All the service catchments listed in the ‘The service catchments are | No action required. Complies
tables of projected infrastructure demand | F é shown on the relevant PFT
are identified on the relevant PFT maps and \ : map series,
vice versa. S
Page 21 of 33See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.