Pre-Request Response application 132008.176.02
@ Page 2 August 16, 2012 3. Site design must avoid clearing non-juvenile koala habitat trees in areas of high value rehabilitation habitat, and medium value rehabilitation habitat, with any unavoidable clearing minimised and offset in accordance with the Offsets for Net Gain of Koala Habitat in South East Queensland Policy at a ratio of five new koala habitat trees for every one non-juvenile koala habitat tree removed or an equivalent cash contribution. Refer above 4. Site design provides safe koala movement opportunities as appropriate to the development type and habitat connectivity values of the site determined by reference to the factors for consideration in Schedule 2, Conditions of existing approval 2008/176 refer to site design ( including conditions 15-17,19,20 and 30 and DERM concurrence agency conditions) 5. During construction phases: a, measures are taken in construction practices to not increase the risk of death or injury to koalas; and b. native vegetation that is cleared and in an area intended to be retained for safe koala movement opportunities is progressively restored and rehabilitated. Conditions of existing approval of 2008/176 refer to construction ( including conditions 15-17,19,20 and 30 and DERM Concurrence Agency conditions) 6. Native vegetation clearing is undertaken as sequential clearing and under the guidance of a koala spotter where the native vegetation is a non-juvenile koala habitat tree. Condition 19 of 2008/176 7, Landscaping activities provide food, shelter and movement opportunities for koalas consistent with the site design. Conditions of approval of 2008/176 refer to Koala Management Plan approved for the site. As detailed in the table above, the approved plans do result in the removal of koala habitat trees. The applicant is however willing to provide offset planting in the adjoining parkland and seeks a meeting with Council staff to further progress the matter. Please contact our Sunshine Coast office if Council has any issues granting this request to extend the currency period or to discuss any aspect of the above development. Yours faithfully, Nadine Gorton Senior Planner martoo consulting pty Itd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pre-Request Response application 132008.176.02Related documentApplication case desk ↗
About this file
- File size
- 542 KB (small file)
- File type
No other editions are linked here.