Council archive · source document
Pre-Request Response application 132008.176.02
RPS Koala Offset Management Plan It is anticipated that as part of any operational works application to effect the offset planting within the prescribed timeframe, a Koala Offset Management Plan will be required. This plan will need to include: ® — Objectives and outcomes for koala habitat replacement / enhancement ® The proposed planting regime, ie. species, quantities and specific locations Details regarding ongoing management and maintenance requirements; s Monitoring and report requirements Revised conditions of approval In amending the conditions of approval for the proposed resort development on Lots 10 & 11, the developer seeks comment from Council as to whether it is able to make appropriate recommendations to the Planning & Environment Court based on one or both of the concepts provided herein. If these concepts are supported in principle, it is recommended that a site inspection be arranged to identify the specific areas where the offset planting of the various relevant species would be most appropriate. From this a detailed plan can be prepared along with documentation demonstrating compliance with the South East Queensland Koala Conservation State Planning Regulatory Provisions on which to assist Council to support its recommendations. If you require any further information and/or want to arrange the site inspection, please do not hesitate to contact me on 0407 410 099, Yours sincerely Dr Justin Watson (Technical Director — Ecology) Attachment 1: Concept A & B for Koala Offset Planting J4413401 Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Pre-Request Response application 132008.176.02Related documentApplication case desk ↗
About this file
- File size
- 542 KB (small file)
- File type
No other editions are linked here.