INTEGRATED PLANNING ACT 1997, : IDAS Assessment Checkist, Version 21.0, 3 September 2007
47
1s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
(2 No
0 Yes
H yes, are the operations mentioned as assessable development in the following?
© Awater resource plan under the Water Act 2000 = [[] No CD Yes
e — Areguiation under the {PA or another Act [No (Yes
If yes fo either or both - (Complete Part K:) This application requires assessment by the Department of Natural Resources and
Water (NRW).. if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3{c)(ii)
IP Regulation, schedule 2, table 2, item &
IP Regulation, schedule 1, part 3, table 4, item 3 .
Water Act 2000, section 966A {wild river area)(Note: no current Wad River dectaration identifies taking or interfering with subastesian weter as assessatie)
Wild River code (Note: the code does not currently contain applicable provisions for subartesien water)
48
(s any of the proposed operationa! work to allow, under the Water Act 2000, for interfering with overland flow water
OO No
(1 Yes - Answer both (a) and (b) below
(a) Is the proposed operational work to be carried out in a wild river area dectared under the Wild Rivers Act 2005?
(1 Yes - Depending on the purpose of the.operational work and its proposed location in the wild river area, assessment may
be required for the purposes of the Wild Rivers Act 2005. Also, in certain circumstances an application for
operational work is taken fo be nol properly made and the Assessment Manager must refuse to receive it.
(Complete Part Ksoif an application is made.)
OO No
If no, are the operations mentioned as assessable development in the following?
Awater resource plan under the Water Act 2000 LINo C1 Yes
Aregulation under the IPA or another Act (INo Yes
if yes to either or both - (Complete Part Kio) This application requires assessment by the Department of Natural
Resources and Water (NRW). if NRW is not the Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.
(b) ts the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage
and embankment area (other than a wild river floodplain management area) and declared to be assessable under
that Act?
(J No
CL) Yes - (Complete Part K1o) This application requires assessment by the Department of Natural Resources and Water (NRW).
If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, items 3(c}{i) and 3(d)
IP Regulation, schedule 2, table 2, item 9
IP Regulation, schedule 1, part 3, table 4, item 3A
Water Act 2000. section 9668 (wild river area)
49
ts the proposed operational work for the following?
+ For the construction of a referable dam as defined under the Water Act 2000 L]No [1 Yes
¢ — Toincrease the storage capacity of a referable dam by more than 10% CJ No [1] Yes
If yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency. :
IPA, schedule 8. part 1, table 4, item 4
JP Regulation. schedule 2, table 2, item 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0310 - MCU - Wellbeing Type 2 - Social [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.