Q3
+ Asingle development application may involve land both within and outside waters.
* A '‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to which high spring
tide ordinarily floes and refiows (unless a regulation has dectared a limit for the watercourse). Generally, a watercourse is in the jurisdiction of the
Department of Natural Resources and Water.
¢ ‘Tidal water’ is defined in the Coastal! Protection Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is defined in
the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to high water mark at spring
tides) establishes the boundary of a tidal area.
* Land below high water mark is not within a local government's area unless provided for under the Local Goverment Act 1993. Unless otherwise
provided for by legislation, a local govemment has no jurisdiction below high water mark. A tidal area for strategic port land is within the jurisdiction of
the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local govemment tidal area. However, the IPA
gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the tidal area for a local government,
and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tida! work).
Qa
« The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the Form 4
Application Form (including this Part and any other relevant Part) is correct.
Ifthe applicant is a company or organisation, a contact person must be nominated,
+ Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the
processes of the application or in the event of an appeal about the outcome of the application.
ato
+ Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource. Schedule 10 of
the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where evidence is required to be given,
and the evidence required to support the application. Link to Integrated Planning Reaulation
+ Section 3.2.1(10)(a)(ii) states an application cannot be taken to be property made without the required evidence.
* Evidence may be required from more than one Department responsible for a State-owned resource, e.g, from the Environmental Protection Agency
for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water
mark..
«In the case of applications involving the taking or interfering with water under the Water Act, the development application may be made at the
same time as the request for resource entitlement.
+ Inthe case of State-controlled roads, a resource entitlement'is not required for an activity that is exempt ancillary works or encroachment (identified
by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Qt
* Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner's, if the application
involves any of the following:
(i) a material change of use;
{ii) reconfiguration of a lot;
{iii) work on land below high-water mark and not within a canal as defined under the Coasta/ Protection and Management Act 1995; or
{iv) work on rail corridor land defined under the Transport infrastructure Act 1994.
¢ ‘Owner’ for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the
rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
+ Owner's consent is not required for a mobile and temporary ERA.
Q12
Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.
Q13
* The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and
construction industry who would be unlikely to accrue enough service with one employer to qualify for Jong service leave. To fund the scheme,.a levy
is collected on all building and construction work carried out in Queensland where the total cost of the work, whether direct or indirect, is $80,000 or
more inclusive of GST. This amount and other prescribed percentages and rates for calculating the levy are stated in the Buikting and Construction
Indusiry (Portable Long Service Leave} Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and
the Building and Construction Industry Training Levy.
¢ The Building and Construction industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction industry for the
purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools,
toads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
« The PLSL Act requires the portable long service leave levy (PLSL levy) be paid before the assessment manager may give a development permit for
certain building or operational work. The assessment manager must sight an approved form issued by QLeave advising of the status of the payment
of the levy.
«Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from
QLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au_
¢ For further information contact QLeave (Tel: 1800 803 481 Web: www.qleave.qid.qov.au )
Privacy Statement
The information collected on Form 7 will be used by the Department of Locai Government, Planning, Sport and Recreation in accordance
with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside of the IDAS process,
except where required by /egislation (including the Freedom of Information Act 1992) or as required by Parliament. This information may be
stored in a Department of Local Government, Planning, Sport and Recreation database. The information collected will be retained as required
by the Public Records Act 2002. For further information on your privacy, contact the Privacy Contact Officer for the Department of Local
Government, Planning, Sport and Recreation at (07) 3237 1860.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0310 - MCU - Wellbeing Type 2 - Social [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.