Council archive · source document
08/0310 - MCU - Wellbeing Type 2 - Social [As Published] · 132008.310
Peregian Beach Community Centre 17 waterways; and $28.5 Runoff from carparking areas is directed to landscaped areas to minimize contaminate runoff, including hydrocarbons, entering the stormwater system and waterways; and $28.6 Garden mounding is incorporated into carparking areas adjacent to frontages; and $28.7 Surface and subsurface drainage swales are used to maximise stormwater infiltration; and $28.8 A planting bed of at least 1m width with screen fencing and dense planting is provided to any property boundary with an adjacent residential development. On-street car parks 029 Edges to parking and turning $29.1 Where vehicles are parked 29 — see 28 (above) spaces for on street parking are parallel to the kerb, landscaping is landscaped to provide shade and setback a minimum of 500mm from screening, while ensuring adequate the back of the kerb to allow access to vehicles. adequate access (see Figure 14-28). $29.2 Street trees are planted a minimum of 1m from the back of the kerb in the road reserve verge. 4.5 ENGINEERING WORKS CODE 4.5.1 Driveways and carparking Minimum Vehicle Parking Requirements Twenty car spaces are required for the Community Centre on the basis that the building is approximately 385 square metres. There is a public carpark already in existence immediately next door to the Centre site at 255 David Low Way. The carpark, currently undeveloped, is on Council owned land. The carpark is of sufficient size to allocate 20 spaces to the Community Centre with 30 spaces to be utilised by the Peregian Beach Bowls Club and surrounding residences and businesses. Council is to develop and landscape the carpark with the Community Centre Project financing the equivalent value of the construction of 20 car spaces. The Main Entrance to the Community Centre will be through the carpark to minimise traffic in surrounding Woodland Drive and Rufous Street and to avoid vehicular access to the Community Centre site thereby minimising risk on site. Safe and convenient cycle access to and from the site from the existing road and bicycle network, and safe bicycle movement within the site will be provided. Bicycle parking facilities will be provided on site. “End of Journey” shower, change and locker facilities are incorporated into the building plan. Facilities will be provided to encourage safe pedestrian access to the community centre. Table 14.47 Column 1 Column 2 Column 3 Use Vehicle Parking requirements Community Use Wellbeing Type 2 — Social 1 space per 20m2 of use area See above
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0310 - MCU - Wellbeing Type 2 - Social [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.