Extension to Currency Period - Approved REC14 0005 04 {As Published} · REC14/0005.04
Officer: Tara Norley
Direct Telephone: 07 53296414
Our Reference: REC14/0005.04
Your Reference: PR102995.10
4 November 2024
Bunnings Properties Pty Ltd
C/- RPS AAP Consulting Pty Ltd
PO Box 1559
FORTITUDE VALLEY QLD 4006
[email protected]
Dear Sir/Madam,
Extension to Currency Period
Planning Act 2016
I refer to your request received on 18 June 2024, to extend the currency period for an existing
development approval. On 28 October 2024, Council decided to approve your request.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: REC14/0005.04
Street address: 178 Eumundi Noosa Rd, Noosaville
Real property description: Lot 101 SP 241371
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 4 July 2014
• Development Permit for Reconfiguration of a Lot (1 Lot into 2 Lots)
In relation to the request to extend the currency period for this approval, Council on 28 October
2024, decided to extend the currency period as detailed below.
A. Approve the extension of the currency period.
B. Amend item 3.
3. CURRENCY PERIOD OF APPROVAL
The currency period ends for this development approval on 25 September 2029, unless an
application to extend the currency period is approved by Council.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Document Set ID: 23331562 Page 1 of
8 Date: 04/11/2024
Version: 4, Version
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When conditions must be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision Notice
must be completed prior to submission of the subdivision plan to Council for compliance
assessment
Approved Plans
2. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed in the following table unless otherwise amended by these
conditions.
Plan No. Rev. Plan/Document Name Date
102995-151 A Proposed Subdivision over Lot 101 on 16 Sept 2020
SP279285
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Boundary Encroachments
4. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
(a) the boundary clearances for any existing buildings remaining on the site comply
with the relevant provisions of the planning scheme and the Building Act 1975,
unless varied by this Decision Notice
(b) all constructed access and roadworks (including associated fill batters and
retaining walls) are fully contained within a dedicated reserve or registered
easement
(c) all existing and proposed utility services and connections (eg. electricity,
telecommunications, water, sewerage) are wholly located within the lot they serve,
or alternatively included within an easement where location within the lot is not
possible
(d) deleted
(e) all dams (including ponded water, dam walls and associated spillway structures)
are wholly located within the boundaries of a single lot
(f) all retaining walls and structures are fully contained within the lot they retain
(g) any fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties
(h) deleted.
Landscaping
5. Native street trees shall be established at 10 metre centres within the footpath reserve
along the frontage of Lot 103 and shall have a minimum pot size of 45 litres.
Vegetation Clearing
6. Vegetation clearing is not authorised by this approval and shall only be undertaken in
association with an appropriate development approval.
Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024 Page 2 of 8
Page 3
ENGINEERING
External Works
7. Gateway Drive must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with an Operational Works approval and must
include in particular the construction of a pedestrian footpath in accordance with the
conditions of this Decision Notice. This condition is imposed pursuant to s665 of the
Sustainable Planning Act 2009 being non-trunk infrastructure.
Pedestrian and Bicycle Facilities
8. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular a 2 metre wide footpath within the road verge extending from the end of the
existing pathway in Gateway Drive to the northern boundary of proposed Lot 103. This
condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-
trunk infrastructure.
Stormwater Drainage
9. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
(a) A connection point for the future development of proposed Lot 103 to the existing
stormwater drainage system
(b) The retention of the existing overland flowpath that conveys stormwater runoff
from the adjoining property (Lot 26 SP151406) through proposed Lot 103. The
flows must be contained and conveyed wholly within a combined drainage solution
consisting of underground drainage, capable of accommodating flows up to a Q10
event, and a landscaped and suitably stabilised (rock lined or other engineered
alternative) open drain. The design of the drain must be sufficient to include all
design storm events up to and including the 1%AEP event of critical duration.
Design calculations (that include at a minimum depth of flow and velocity) and
certification by a suitably qualified RPEQ demonstrating the above must be
submitted as part of the operational works application
(c) Additional elements in the design of the open drain (localised bunding etc) that
allows stormwater flows from the minor storm event to enter the existing piped
system and ensure that velocities (generated in both the major and minor events)
are in accordance with the safety guidelines recommended in QUDM.
Electricity and Telecommunication Services
10. Underground reticulated electricity and telecommunication services must be provided to
each lot in accordance with an approval for Operational Works and the standards and
requirements of the relevant service provider.
11. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
12. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
13. A drainage easement must be created within proposed Lot 103. The easement must be:
Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024 Page 3 of 8
Page 4
(a) Of sufficient width (approximately 4.5m) to encompass all elements of the
combined underground pipe and open drain solution (underground pipe (Q10
flows), batters, bunds, etc. and a 1.5m maintenance track),
(b) In favour of Lot 26 SP151406 to connect to a legal point of discharge as defined
in QUDM.
(c) Alignment of the underground pipe, open drain, and easement is to be determined
through operational works application (as per condition 9(b) above).
14. A drainage easement must be created within proposed Lot 101. The easement must be:
(a) In favour of Lot 26 SP151406 and proposed Lot 103,
(b) Centrally located over the existing piped drainage system connecting proposed
Lot 103 and Lot 26 SP151406 to the existing stormwater discharge point in
Gateway Drive.
15. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
16. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
17. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
18. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council.
19. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
20. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
UNITYWATER
Important Advisory Note - The following Unitywater conditions are applied in accordance with
the Chapter 4c, part 7 and sections 135 and 140(c) South East Queensland (Distribution and
Retail) Restructuring Act 2009 and Unitywater’s Interim Connections Policy. The conditions
below form part of a water connection aspect which are taken to be a water approval for a
staged connection. You are entitled to appeal against the water connection aspects of this
application in accordance with section 99BRAY and Chapter 4c, part 4, Divisions 1 and 2
of the South East Queensland (Distribution and Retail) Restructuring Act 2009. Unitywater
can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024 Page 4 of 8
Page 5
Email: [email protected]
Web: www.unitywater.com
21. Reticulated water must be provided to each lot in the development. This must include:
(a) Ensuring that existing internal water pipes are wholly contained within the lot they
will serve.
(b) An approved water meter for each lot in accordance with Unitywater and SEQ
Standard Drawings.
(c) Provision of a water service to service proposed all lots in accordance with
Unitywater and SEQ Standard Drawings.
(d) Provision of a pipeline conduit under Gateway Drive in accordance with Unitywater
and SEQ Standard Drawings.
(e) An approved 150mm diameter water service connection to each lot in accordance
with Unitywater requirements.
22. Water meters must be located on alternative boundaries to electrical pillars.
23. Reticulated sewerage must be provided to each lot in the development. This must
include:
(a) Ensuring existing sewer house drains are wholly contained within the Lot they will
serve.
(b) Provision of sewerage infrastructure to the property boundaries of Lot 103.
24. Written approval to enter and construct must be obtained from the owners of properties
through which external sewers will traverse, and be submitted with lodgment of the
associated development application for Operational Works.
25. Easements of between 3 and 10 metres must be provided over all Unitywater sewers
located within property boundaries in accordance with the SEQ standards. Easements
shall be centred over the pipe. Easement terms shall be the most current registered
dealing held by the Department of Natural Resources & Mines and shall not be altered
or amended.
26. Written approval to enter and construct must be obtained from the owners of properties
through which external watermains will traverse. This must include approval for an
easement over the mains, and be submitted with lodgment of the associated
development application for Operational Works.
27. A minimum clearance of 1.5 metres must be maintained between Unitywater sewers
and proposed building envelopes, buildings and other structures.
28. Stormwater retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 meters from Unitywater water supply and sewerage infrastructure
29. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature and suitable
Unitywater approved varieties.
30. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
5. REFERRAL AGENCIES
Not Applicable
Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024 Page 5 of 8
Page 6
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
6855.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
3. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
(a) traffic management during all aspects of the construction phase including:
(i) a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction
(ii) maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
(iii) proposed fencing to the site during the construction phase of the
development
(iv) approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled roads
(v) provision for worker car parking
(b) maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
(c) works programme identifying key components of the works and their respective
durations
(d) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues
(e) identification of complaint management procedures including:
(i) contact details for the on-site manager
(ii) dispute resolution procedures
(f) it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
Unitywater
4. Connection to the Unitywater live water supply and live sewerage system must be
undertaken by Unitywater at the applicant’s cost.
Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024 Page 6 of 8
Page 7
Infrastructure Charges
5. This Development Permit may trigger an “Adopted Infrastructure Charge Notice” (if
applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges
Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the
Sustainable Planning Act 2009
7. PROPERTY NOTES
Not applicable
8. VARIATION APPROVAL DETAILS
Not applicable
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All Building Works
10. SUBMISSIONS
Not applicable
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Planning Act 2016 is attached.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available online
at www.noosa.qld.gov.au or at Council Offices.
Yours faithfully
Tara Norley
Senior Development Planner
Enc: Appeal Rights
DECISION NOTICE HISTORY
• Original Decision Notice – 4 July 2014.
• Negotiated Decision Notice – 24 September 2014; with amendment to condition numbering, change condition 5, delete
conditions 4(d) & 4(h)
• Decision Notice - Minor - REC14/0005.02 & REC14/0005.03 – 29 October 2020; Extension to Currency period and change to
condition 2
• Decision Notice – Extension to Currency Period – REC14/005.01 – 27 September 2018 – Extension to currency period
• Decision Notice – Extension to Currency Period – REC14/0005.04, 28 October 2024; Amend item 3.
Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024 Page 7 of 8
Page 8
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
228 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(Refer to Schedule 1 of the Planning Act 2016)
(a) if a submitter or advice agency started the appeal in the P&E
(2) An appellant may start an appeal within the appeal period.
Court – 2 business days after the appeal has started; or
(3) The appeal period is –
(b) otherwise – 10 business days after the appeal is started.
(a) for an appeal by a building advisory agency – 10 business
(5) A notice of appeal given to a person who may elect to be a co-
days after a decision notice for the decision is given to the
respondent must state the effect of subsection (6).
agency; or
(6) A person elects to be a co-respondent by filing a notice of election,
(b) for an appeal against a deemed refusal – at any time after the
in the approved form, within 10 business days after the notice of
deemed refusal happens; or
appeal is given to the person.
(c) for an appeal against a decision of the Minister, under chapter
230 Other appeals
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
section 269(3)(a) or (4); or the Supreme Court decides a decision or other matter under this
Act is affected by jurisdictional error, the decision or matter is non-
(d) for an appeal against an infrastructure charges notice – 20
appealable.
business days after the infrastructure charges notice is given
to the person; or (2) The Judicial Review Act 1991, part 5 applies to the decision or
matter to the extent it is affected by jurisdictional error.
(e) for an appeal about a deemed approval of a development
application for which a decision notice has not been given – (3) A person who, but for subsection (1) could have made an
30 business days after the applicant gives the deemed application under the Judicial Review Act 1991 in relation to the
approval notice to the assessment manager; or decision or matter, may apply under part 4 of that Act for a
statement of reasons in relation to the decision or matter.
(f) for any other appeal – 20 business days after a notice of the
decision for the matter, including an enforcement notice, is (4) In this section –
given to the person. decision includes-
Note – (a) conduct engaged in for the purpose of making a decision; and
See the P&E Court Act for the court’s power to extend the appeal
(b) other conduct that relates to the making of a decision; and
period.
(c) the making of a decision or failure to make a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (d) a purported decision; and
(5) If an appeal is only about a referral agency’s response, the (e) a deemed refusal.
assessment manager may apply to the tribunal or P&E Court to
non-appealable, for a decision or matter, means the decision or
withdraw from the appeal.
matter-
(6) To remove any doubt. It is declared that an appeal against an
(a) is final and conclusive; and
infrastructure charges notice must not be about-
(b) may not be challenged, appealed against, reviewed, quashed,
(a) the adopted charge itself; or
set aside or called into question in any other way under the
(b) for a decision about an offset or refund- Judicial Review Act 1991 or otherwise, whether by the
Supreme Court, another court, a tribunal or another entity; and
(i) the establishment cost of trunk infrastructure identified in
a LGIP; or (c) is not subject to any declaratory, injunctive or other order of
the Supreme Court, another court, a tribunal or another entity
(ii) the cost of infrastructure decided using the method
on any ground.
included in the local government’s charges resolution.
231 Rules of the P&E Court
229 Notice of appeal
(1) A person who is appealing to the P&E Court must comply with the
(1) An appellant starts an appeal by lodging, with the registrar of the
rules of the court that apply to the appeal.
tribunal or P&E Court, a notice of appeal that-
(2) However, the P&E Court may hear and decide an appeal even if
(a) is in the approved form; and
the person has not complied with the rules of the P&E Court.
(b) succinctly states the grounds of the appeal.
(2) The notice of appeal must be accompanied by the required fee.
Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024 Page 8 of 8
Used in these records
Extension to Currency Period - Approved REC14 0005 04 {As Published}Related documentApplication case desk ↗
About this file
- File size
- 195 KB (small file)
- File type
No other editions are linked here.