                                                               Officer:            Tara Norley
                                                               Direct Telephone:   07 53296414
                                                               Our Reference:      REC14/0005.04
                                                               Your Reference:     PR102995.10

                 4 November 2024


                 Bunnings Properties Pty Ltd
                 C/- RPS AAP Consulting Pty Ltd
                 PO Box 1559
                 FORTITUDE VALLEY QLD 4006

                 [email protected]



                 Dear Sir/Madam,
                                             Extension to Currency Period
                                                       Planning Act 2016

                 I refer to your request received on 18 June 2024, to extend the currency period for an existing
                 development approval. On 28 October 2024, Council decided to approve your request.
                 Details of the decision are as follows:
                 1.      APPLICATION DETAILS

                     Application No:            REC14/0005.04

                     Street address:            178 Eumundi Noosa Rd, Noosaville

                     Real property description: Lot 101 SP 241371

                     Planning Scheme:           Noosa Plan 2020 (25 September 2020)

                 2.      DECISION DETAILS

                 The following type of approval was issued on 4 July 2014
                 •       Development Permit for Reconfiguration of a Lot (1 Lot into 2 Lots)
                 In relation to the request to extend the currency period for this approval, Council on 28 October
                 2024, decided to extend the currency period as detailed below.
                 A.      Approve the extension of the currency period.
                 B.      Amend item 3.
                 3.      CURRENCY PERIOD OF APPROVAL

                 The currency period ends for this development approval on 25 September 2029, unless an
                 application to extend the currency period is approved by Council.




                 ABN 97.969.214.121                                                                       PO Box 141
                 noosa.qld.gov.au                                                                  Tewantin QLD 4565
                 [email protected]                                                                  07 5329 6500
Document Set ID: 23331562                                                                                     Page 1 of
                  8 Date: 04/11/2024
Version: 4, Version
Full text of the other 7 pages

Page 2

                 4.     ASSESSMENT MANAGER CONDITIONS

                 PLANNING
                        When conditions must be Complied With
                 1.     Unless otherwise stated, all works required by the conditions of this Decision Notice
                        must be completed prior to submission of the subdivision plan to Council for compliance
                        assessment
                        Approved Plans
                 2.     Development authorised by this approval must be undertaken generally in accordance
                        with the Approved Plans listed in the following table unless otherwise amended by these
                        conditions.

                           Plan No.           Rev.    Plan/Document Name                            Date

                           102995-151         A       Proposed Subdivision over Lot 101 on 16 Sept 2020
                                                      SP279285

                 3.     All lot numbering on the subdivision plan to be submitted to Council for compliance
                        assessment must remain as shown on the Approved Plans.
                        Boundary Encroachments
                 4.     Certification must be submitted to Council from a Licensed Surveyor which certifies that:
                        (a) the boundary clearances for any existing buildings remaining on the site comply
                               with the relevant provisions of the planning scheme and the Building Act 1975,
                               unless varied by this Decision Notice
                        (b) all constructed access and roadworks (including associated fill batters and
                               retaining walls) are fully contained within a dedicated reserve or registered
                               easement
                        (c) all existing and proposed utility services and connections (eg. electricity,
                               telecommunications, water, sewerage) are wholly located within the lot they serve,
                               or alternatively included within an easement where location within the lot is not
                               possible
                        (d) deleted
                        (e) all dams (including ponded water, dam walls and associated spillway structures)
                               are wholly located within the boundaries of a single lot
                        (f)    all retaining walls and structures are fully contained within the lot they retain
                        (g) any fill, including fill batters, are wholly contained within the subject site and not on
                               adjacent properties
                        (h) deleted.
                        Landscaping
                 5.     Native street trees shall be established at 10 metre centres within the footpath reserve
                        along the frontage of Lot 103 and shall have a minimum pot size of 45 litres.
                        Vegetation Clearing
                 6.     Vegetation clearing is not authorised by this approval and shall only be undertaken in
                        association with an appropriate development approval.




Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024                                                                       Page 2 of 8

Page 3

                 ENGINEERING
                        External Works
                 7.     Gateway Drive must be upgraded for the length of its frontage to the subject site. The
                        works must be undertaken in accordance with an Operational Works approval and must
                        include in particular the construction of a pedestrian footpath in accordance with the
                        conditions of this Decision Notice. This condition is imposed pursuant to s665 of the
                        Sustainable Planning Act 2009 being non-trunk infrastructure.
                        Pedestrian and Bicycle Facilities
                 8.     Pedestrian and bicycle facilities must be provided for the development. The works must
                        be undertaken in accordance with an Operational Works approval and must include in
                        particular a 2 metre wide footpath within the road verge extending from the end of the
                        existing pathway in Gateway Drive to the northern boundary of proposed Lot 103. This
                        condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-
                        trunk infrastructure.
                        Stormwater Drainage
                 9.     The site must be provided with a stormwater drainage system connecting to a lawful
                        point of discharge. The works must be undertaken in accordance with an Operational
                        Works approval and must include in particular:
                        (a) A connection point for the future development of proposed Lot 103 to the existing
                              stormwater drainage system
                        (b) The retention of the existing overland flowpath that conveys stormwater runoff
                              from the adjoining property (Lot 26 SP151406) through proposed Lot 103. The
                              flows must be contained and conveyed wholly within a combined drainage solution
                              consisting of underground drainage, capable of accommodating flows up to a Q10
                              event, and a landscaped and suitably stabilised (rock lined or other engineered
                              alternative) open drain. The design of the drain must be sufficient to include all
                              design storm events up to and including the 1%AEP event of critical duration.
                              Design calculations (that include at a minimum depth of flow and velocity) and
                              certification by a suitably qualified RPEQ demonstrating the above must be
                              submitted as part of the operational works application
                        (c) Additional elements in the design of the open drain (localised bunding etc) that
                              allows stormwater flows from the minor storm event to enter the existing piped
                              system and ensure that velocities (generated in both the major and minor events)
                              are in accordance with the safety guidelines recommended in QUDM.
                        Electricity and Telecommunication Services
                 10.    Underground reticulated electricity and telecommunication services must be provided to
                        each lot in accordance with an approval for Operational Works and the standards and
                        requirements of the relevant service provider.
                 11.    Unless otherwise stipulated by telecommunications legislation at the time of
                        construction, the development must be provided with all necessary conduits, pits and
                        pipes to accommodate the future connection of optic fibre technology
                        telecommunications.
                 12.    Certification must be submitted to Council from all relevant service providers which
                        certifies that the development has met the requirements of this Decision Notice and all
                        applicable legislation at the time of construction.
                        Easements
                 13.    A drainage easement must be created within proposed Lot 103. The easement must be:




Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024                                                                   Page 3 of 8

Page 4

                        (a)     Of sufficient width (approximately 4.5m) to encompass all elements of the
                                combined underground pipe and open drain solution (underground pipe (Q10
                                flows), batters, bunds, etc. and a 1.5m maintenance track),
                        (b)     In favour of Lot 26 SP151406 to connect to a legal point of discharge as defined
                                in QUDM.
                        (c)     Alignment of the underground pipe, open drain, and easement is to be determined
                                through operational works application (as per condition 9(b) above).
                 14.    A drainage easement must be created within proposed Lot 101. The easement must be:
                        (a) In favour of Lot 26 SP151406 and proposed Lot 103,
                        (b)     Centrally located over the existing piped drainage system connecting proposed
                                Lot 103 and Lot 26 SP151406 to the existing stormwater discharge point in
                                Gateway Drive.
                 15.    Unless otherwise agreed in writing by the relevant service provider, any public or third
                        party infrastructure located on the subject site must be placed within an easement
                        registered against the title of the property.
                 16.    All easements must be designed in accordance with the planning scheme and granted
                        at no cost to the Grantee. Where the Grantee is Council or a service authority, the
                        easement documentation must be in accordance with the Grantee’s standard easement
                        terms. Draft easement documentation must be submitted to Council for endorsement.
                 17.    All works must be kept clear of any existing or proposed easements on the subject land,
                        unless agreed otherwise in writing by the Grantee.
                        Earthworks and Retaining Walls
                 18.    All fill and associated batters must be undertaken in accordance with an Operational
                        Works approval, and contained entirely within the subject site unless written permission
                        from the respective landowner(s) is provided to Council.
                 19.    All retaining walls must be designed and constructed in accordance with the planning
                        scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
                        walls that are publicly accessible and exceed 1.0m in height must be fitted with a
                        commercial grade safety fence.
                        Damage to Services and Assets
                 20.    Any damage caused to existing services and assets as a result of the development
                        works must be repaired at no cost to the asset owner at the following times:
                        (a) where the damage would cause a hazard to pedestrian or vehicle safety,
                             immediately; or
                        (b) where otherwise, upon completion of the works associated with the development.
                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                 UNITYWATER
                 Important Advisory Note - The following Unitywater conditions are applied in accordance with
                 the Chapter 4c, part 7 and sections 135 and 140(c) South East Queensland (Distribution and
                 Retail) Restructuring Act 2009 and Unitywater’s Interim Connections Policy. The conditions
                 below form part of a water connection aspect which are taken to be a water approval for a
                 staged connection. You are entitled to appeal against the water connection aspects of this
                 application in accordance with section 99BRAY and Chapter 4c, part 4, Divisions 1 and 2
                 of the South East Queensland (Distribution and Retail) Restructuring Act 2009. Unitywater
                 can be contacted as follows:
                 Phone: 1300 0 Unity (1300 086 489)




Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024                                                                   Page 4 of 8

Page 5

                 Email: [email protected]
                 Web:     www.unitywater.com
                 21.    Reticulated water must be provided to each lot in the development. This must include:
                        (a) Ensuring that existing internal water pipes are wholly contained within the lot they
                              will serve.
                        (b) An approved water meter for each lot in accordance with Unitywater and SEQ
                              Standard Drawings.
                        (c) Provision of a water service to service proposed all lots in accordance with
                              Unitywater and SEQ Standard Drawings.
                        (d) Provision of a pipeline conduit under Gateway Drive in accordance with Unitywater
                              and SEQ Standard Drawings.
                        (e) An approved 150mm diameter water service connection to each lot in accordance
                              with Unitywater requirements.
                 22.    Water meters must be located on alternative boundaries to electrical pillars.
                 23.    Reticulated sewerage must be provided to each lot in the development. This must
                        include:
                        (a)     Ensuring existing sewer house drains are wholly contained within the Lot they will
                                serve.
                        (b)     Provision of sewerage infrastructure to the property boundaries of Lot 103.
                 24.    Written approval to enter and construct must be obtained from the owners of properties
                        through which external sewers will traverse, and be submitted with lodgment of the
                        associated development application for Operational Works.
                 25.    Easements of between 3 and 10 metres must be provided over all Unitywater sewers
                        located within property boundaries in accordance with the SEQ standards. Easements
                        shall be centred over the pipe. Easement terms shall be the most current registered
                        dealing held by the Department of Natural Resources & Mines and shall not be altered
                        or amended.
                 26.    Written approval to enter and construct must be obtained from the owners of properties
                        through which external watermains will traverse. This must include approval for an
                        easement over the mains, and be submitted with lodgment of the associated
                        development application for Operational Works.
                 27.    A minimum clearance of 1.5 metres must be maintained between Unitywater sewers
                        and proposed building envelopes, buildings and other structures.
                 28.    Stormwater retention systems and gross pollutant traps must maintain a minimum
                        clearance of 1.5 meters from Unitywater water supply and sewerage infrastructure
                 29.    Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
                        Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
                        plants within these clearances must be low growing when mature and suitable
                        Unitywater approved varieties.
                 30.    Construction works undertaken in the vicinity of Unitywater water supply or sewerage
                        infrastructure must not adversely affect the integrity of the infrastructure. All costs
                        associated with repair, replacement or alteration of infrastructure must be met by the
                        applicant.
                 5.     REFERRAL AGENCIES

                 Not Applicable




Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024                                                                     Page 5 of 8

Page 6

                 6.     ADVISORY NOTES

                 The following notes are included for guidance and information purposes only and do not form
                 part of the assessment manager conditions:
                        Building and Construction Industry (Portable Long Service Leave) Levy
                 1.     The QLeave levy must be paid prior to the issue of a development permit where it is
                        required. Council will not be able to issue a Decision Notice without receipt of details
                        that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
                        6855.
                        Co-ordination of Operational Works Assessment
                 2.     Additional application fees apply to Operational Work applications where the different
                        aspects of the works are lodged separately. Significant savings in application fees will
                        result if all works are lodged in a single application.
                        Preparation of a Preliminary Construction Management Plan
                 3.     A preliminary Construction Management Plan must be submitted with the Operational
                        Works application and must address the following:
                        (a)     traffic management during all aspects of the construction phase including:
                                (i)    a Traffic Management Control Plan in accordance with the Manual of
                                       Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                                       and traffic control measures prior to construction
                                (ii) maintenance of safe pedestrian access for the areas affected by the works
                                       during and after daily construction has ceased
                                (iii) proposed fencing to the site during the construction phase of the
                                       development
                                (iv) approval of the Traffic Management Control Plan by the Department of
                                       Transport and Main Roads (DTMR) for any works on State controlled roads
                                (v) provision for worker car parking
                        (b)     maintenance and protection of water quality and existing drainage lines through
                                the construction site, through the implementation of appropriate erosion and
                                sediment control measures
                        (c)     works programme identifying key components of the works and their respective
                                durations
                        (d)     establishment of a communication protocol with the general public, adjoining
                                owners, emergency services and local businesses to advise of agreed
                                construction times, impacts on traffic, services and other relevant issues
                        (e)     identification of complaint management procedures including:
                                (i)    contact details for the on-site manager
                                (ii) dispute resolution procedures
                        (f)     it is acknowledged that the preliminary Construction Management Plan will be a
                                draft document requiring finalisation upon appointment of the Principal Contractor
                                employed to construct the works and a final document will be required to be
                                submitted at the Pre-Start Meeting for the project.
                        Unitywater
                 4.     Connection to the Unitywater live water supply and live sewerage system must be
                        undertaken by Unitywater at the applicant’s cost.




Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024                                                                     Page 6 of 8

Page 7

                           Infrastructure Charges
                 5.        This Development Permit may trigger an “Adopted Infrastructure Charge Notice” (if
                           applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges
                           Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the
                           Sustainable Planning Act 2009
                 7.        PROPERTY NOTES

                 Not applicable
                 8.        VARIATION APPROVAL DETAILS

                 Not applicable
                 9.        FURTHER DEVELOPMENT PERMITS REQUIRED

                     Type of Development Permit Required                       Subject of the required Development Permit

                     Development Permit for Building Works                     All Building Works

                 10.       SUBMISSIONS

                 Not applicable
                 11.       RIGHTS OF APPEAL

                 You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
                 the Planning Act 2016 is attached.
                 12.       OTHER DETAILS

                 If you wish to obtain more information about the decision, electronic copies are available online
                 at www.noosa.qld.gov.au or at Council Offices.

                 Yours faithfully




                 Tara Norley
                 Senior Development Planner
                 Enc:      Appeal Rights



                 DECISION NOTICE HISTORY
                 •     Original Decision Notice – 4 July 2014.
                 •     Negotiated Decision Notice – 24 September 2014; with amendment to condition numbering, change condition 5, delete
                       conditions 4(d) & 4(h)

                 •     Decision Notice - Minor - REC14/0005.02 & REC14/0005.03 – 29 October 2020; Extension to Currency period and change to
                       condition 2

                 •     Decision Notice – Extension to Currency Period – REC14/005.01 – 27 September 2018 – Extension to currency period

                 •     Decision Notice – Extension to Currency Period – REC14/0005.04, 28 October 2024; Amend item 3.




Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024                                                                                            Page 7 of 8

Page 8

                                                                                Appeal Rights
                                                                                PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               228 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (Refer to Schedule 1 of the Planning Act 2016)
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (2) An appellant may start an appeal within the appeal period.
                                                                                                      Court – 2 business days after the appeal has started; or
               (3) The appeal period is –
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                              (5) A notice of appeal given to a person who may elect to be a co-
                       days after a decision notice for the decision is given to the
                                                                                                  respondent must state the effect of subsection (6).
                       agency; or
                                                                                              (6) A person elects to be a co-respondent by filing a notice of election,
                   (b) for an appeal against a deemed refusal – at any time after the
                                                                                                  in the approved form, within 10 business days after the notice of
                       deemed refusal happens; or
                                                                                                  appeal is given to the person.
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                              230 Other appeals
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                       section 269(3)(a) or (4); or                                               the Supreme Court decides a decision or other matter under this
                                                                                                  Act is affected by jurisdictional error, the decision or matter is non-
                   (d) for an appeal against an infrastructure charges notice – 20
                                                                                                  appealable.
                       business days after the infrastructure charges notice is given
                       to the person; or                                                      (2) The Judicial Review Act 1991, part 5 applies to the decision or
                                                                                                  matter to the extent it is affected by jurisdictional error.
                   (e) for an appeal about a deemed approval of a development
                       application for which a decision notice has not been given –           (3) A person who, but for subsection (1) could have made an
                       30 business days after the applicant gives the deemed                      application under the Judicial Review Act 1991 in relation to the
                       approval notice to the assessment manager; or                              decision or matter, may apply under part 4 of that Act for a
                                                                                                  statement of reasons in relation to the decision or matter.
                   (f)   for any other appeal – 20 business days after a notice of the
                         decision for the matter, including an enforcement notice, is         (4) In this section –
                         given to the person.                                                     decision includes-
               Note –                                                                             (a) conduct engaged in for the purpose of making a decision; and
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (b) other conduct that relates to the making of a decision; and
                   period.
                                                                                                  (c) the making of a decision or failure to make a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (d) a purported decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (e) a deemed refusal.
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  non-appealable, for a decision or matter, means the decision or
                   withdraw from the appeal.
                                                                                                  matter-
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  (a) is final and conclusive; and
                   infrastructure charges notice must not be about-
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (a) the adopted charge itself; or
                                                                                                      set aside or called into question in any other way under the
                   (b) for a decision about an offset or refund-                                      Judicial Review Act 1991 or otherwise, whether by the
                                                                                                      Supreme Court, another court, a tribunal or another entity; and
                         (i)   the establishment cost of trunk infrastructure identified in
                               a LGIP; or                                                         (c) is not subject to any declaratory, injunctive or other order of
                                                                                                      the Supreme Court, another court, a tribunal or another entity
                         (ii) the cost of infrastructure decided using the method
                                                                                                      on any ground.
                              included in the local government’s charges resolution.
                                                                                              231 Rules of the P&E Court
               229 Notice of appeal
                                                                                              (1) A person who is appealing to the P&E Court must comply with the
               (1) An appellant starts an appeal by lodging, with the registrar of the
                                                                                                  rules of the court that apply to the appeal.
                   tribunal or P&E Court, a notice of appeal that-
                                                                                              (2) However, the P&E Court may hear and decide an appeal even if
                   (a) is in the approved form; and
                                                                                                  the person has not complied with the rules of the P&E Court.
                   (b) succinctly states the grounds of the appeal.
               (2) The notice of appeal must be accompanied by the required fee.




Document Set ID: 23331562
Version: 4, Version Date: 04/11/2024                                                                                                                 Page 8 of 8

Used in these records

About this file

File size
195 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Extension to Currency Period - Approved REC14 0005 04 {As Published}.pdf · 195 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.