REVISED DESIGN - 9 Rules Road - Design Plans - Rev E - 15022026
Plans and drawings: the text below has words only, no drawings.
NOTES: SCHEDULE LEGEND
• ALL NEW DWELLINGS MUST HAVE ONE DISABILITY ACCESSIBLE COMPLIANT BATHROOM WATER SUPPLY
(ADDITIONAL BATHROOMS NEED NOT COMPLY). SYMBOL ITEM
MAINS CONNECTION
• WHERE THE BATHROOM HAS AN OPEN SHOWER AND THE TILER CAN GET FALL TO THE CONNECT TO EXISTING TANKS TREATMENT AREA
WASTE, ONLY ONE LINEAR WASTE GRATE WILL BE INSTALLED IN THE SHOWER. NEW TANKS TSH TO SUPPLY AND INSTALL TANKS
TREATMENT PLANT
CLIENT TO SUPPLY/TSH TO INSTALL
• IF THE SHOWER IS ENCLOSED, OR THERE IS NOT APPROPRIATE FALL, A WASTE POINT DISTANCE TO CONNECTION: APPROX............................ WATER TANK
WILL BE INSTALLED IN BOTH THE SHOWER AND BATHROOM FLOOR AREA.
SEWER CONNECTION WATER PUMP
• ALL BATHROOMS ARE TO COMPLY WITH UPDATED WATERPROOFING RULES REQUIRING
THEM TO BE STEPPED DOWN AND BEDDED IN. MAINS CONNECTION DOWNPIPES
USE EXISTING WASTE WATER TREATMENT PLANT
• IF ADDITIONAL WASTE POINTS ARE REQUIRED IN ANY WC, LAUNDRY OR KITCHEN THE NEW WASTEWATER TREATMENT PLANT TO BE INSTALLED EXTERNAL TAPS
ENTIRE ARE MUST COMPLY WITH ALL WATERPROOFING REQUIREMENTS. DISTANCE TO CONNECTION: APPROX............................. HOT WATER SYSTEM
• THE FINAL LOCATION OF ALL WASTE POINTS WILL BE DETERMINED ON SITE. STORMWATER LINEAR WASTE GRATE
• THE FINAL LOCATION OF ALL HOT WATER SYSTEMS AND GAS CONNECTIONS WILL BE CONNECT INTO EXISTING HOUSE DOWNPIPES SQUARE WASTE GRATE
DICTATED BY THE LICENSED PLUMBER OR TRADESMAN ON SITE, AS PER AUSTRALIAN CONNECT ALL DOWNPIPES TO ONE TANK
REGULATIONS. GAS STOVE COOKTOP
CONNECT DOWNPIPES TO MULTIPLE TANKS CONNECTION
DISTANCE TO CONNECTION: APPROX............................
• ALL BATHROOMS OR WC'S ON CONCRETE SLAB FOUNDATIONS WILL REQUIRE ONE FRIDGE PLUMBING
INSPECTION OPENING NEXT TO EACH TOILET. TO BE DETERMINED BY THE PLUMBER.
SITE PLAN FLOOR PLAN ROOF PLAN
DP DP DP
WM
SPACE
D
OA
SR
LE
RU
RE
SE
RV
ES
TR
EE
T
DP DP
Project Description
No. Description Date PROPOSED DWELLING PLUMBING PLAN-SERVICE CONNECTIONS
W: www.theshedhouse.com.au A DESIGN ROUND 1 - ISSUE A 07.11.2025
Project number TSH25038
B DESIGN ROUND 2 - ISSUE B 12.11.2025
WD.125
Project Address
C RELEASED FOR APPROVAL 08.12.2025 Date 15.02.2026 25 of 33
ABN: 39 630 500 695 9 RULES ROAD, POMONA QLD 4568
D RELEASED FOR APPROVAL 05.02.2026 Drawn by AG Sheets in Set
QBCC: 1514 0876 E RELEASED FOR APPROVAL 15.02.2026
Client Name Client Checked by TSH TEAM Scale As indicated
C_I C_2_I
BARNES Approval Soil Class: TBC Wind Design: TBC
Do not scale off this drawing. All dimesnions to be verified on site. Barnward Construction Services Pty Ltd owns copyright in this drawing. Unauthorised use, reproduction, or any adaptation is forbidden & will be prosecuted.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.