Council archive · source document
RFI - Attachment D - Geotechnical Investigation Report · MCU25/0053
Page : 3 of 17 Work Order : EB2502462 Client : PTG Consulting Pty Ltd Project : PTG/01608 7 Noosa Pde Analytical Results Sub-Matrix: SOIL Sample ID BH1 0.0 - 0.25 BH1 0.25 -0.5 BH1 0.5 - 0.75 BH1 0.75 - 1.0 BH1 1.0 - 1.25 (Matrix: SOIL) Sampling date / time 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 Compound CAS Number LOR Unit EB2502462-001 EB2502462-002 EB2502462-003 EB2502462-004 EB2502462-005 Result Result Result Result Result EA003 :pH (field/fox) pH (F) ---- 0.1 pH Unit 4.9 4.9 5.0 4.9 5.2 pH (Fox) ---- 0.1 pH Unit 2.6 2.0 2.8 2.4 2.7 Reaction Rate ---- 1 Reaction Unit 2 3 2 2 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.