Council archive · source document
RFI - Attachment D - Geotechnical Investigation Report · MCU25/0053
Page : 5 of 17 Work Order : EB2502462 Client : PTG Consulting Pty Ltd Project : PTG/01608 7 Noosa Pde Analytical Results Sub-Matrix: SOIL Sample ID BH1 2.5 - 2.75 BH1 2.75 - 3.0 BH1 3.0 - 3.25 BH1 3.25 - 3.5 BH1 3.5 - 3.75 (Matrix: SOIL) Sampling date / time 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 Compound CAS Number LOR Unit EB2502462-011 EB2502462-012 EB2502462-013 EB2502462-014 EB2502462-015 Result Result Result Result Result EA003 :pH (field/fox) pH (F) ---- 0.1 pH Unit 5.8 5.8 6.0 6.4 5.9 pH (Fox) ---- 0.1 pH Unit 1.9 2.0 1.5 2.2 2.2 Reaction Rate ---- 1 Reaction Unit 3 2 2 4 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.