Council archive · source document
RFI - Attachment D - Geotechnical Investigation Report · MCU25/0053
Page : 8 of 17 Work Order : EB2502462 Client : PTG Consulting Pty Ltd Project : PTG/01608 7 Noosa Pde Analytical Results Sub-Matrix: SOIL Sample ID BH2 1.75 - 2.0 BH2 2.0 - 2.25 BH2 2.25- 2.5 BH2 2.5 - 2.75 BH2 2.75 - 3.0 (Matrix: SOIL) Sampling date / time 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 Compound CAS Number LOR Unit EB2502462-026 EB2502462-027 EB2502462-028 EB2502462-029 EB2502462-030 Result Result Result Result Result EA003 :pH (field/fox) pH (F) ---- 0.1 pH Unit 6.3 6.5 4.8 4.7 5.4 pH (Fox) ---- 0.1 pH Unit 3.2 3.0 1.6 1.6 1.9 Reaction Rate ---- 1 Reaction Unit 2 2 3 3 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.