Council archive · source document
RFI - Attachment D - Geotechnical Investigation Report · MCU25/0053
Page : 10 of 17 Work Order : EB2502462 Client : PTG Consulting Pty Ltd Project : PTG/01608 7 Noosa Pde Analytical Results Sub-Matrix: SOIL Sample ID BH2 4.25 - 4.5 BH3 0.0 - 0.25 BH3 0.25 -0.5 BH3 0.5 - 0.75 BH3 0.75 - 1.0 (Matrix: SOIL) Sampling date / time 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 23-Jan-2025 00:00 Compound CAS Number LOR Unit EB2502462-036 EB2502462-037 EB2502462-038 EB2502462-039 EB2502462-040 Result Result Result Result Result EA003 :pH (field/fox) pH (F) ---- 0.1 pH Unit 5.8 6.2 6.6 6.4 6.7 pH (Fox) ---- 0.1 pH Unit 2.4 3.3 3.8 3.6 3.6 Reaction Rate ---- 1 Reaction Unit 4 2 2 2 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment D - Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.