PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 AUGUST 2016
11. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the
maximum allowable building height as required by condition 10 of the approval.
12. The development is permitted a total maximum use area of 6,054m2 with each
individual use permitted the following maximum use areas at any one time:-
12.1 Education – Type 3 Adult – 2,723m2 comprising a maximum of 1,400m2
student contact area and 1323m2 of non-student contact area
12.2 Retail Business – Type 1 Local – 100m2
12.3 Retail Business Type 2 Shop and Salon or Entertainment and Dining
Business Type 1 Food and Beverages – 236m2 (includes 16m2 of outdoor
dining).
12.4 The remaining use area being available for:
Commercial Business Type 1 – Office
Commercial Business Type 2 Medical
Student contact area comprises all areas used for student lectures, tutorials
or the like.
36. The development shall provide car parking spaces on the site at a minimum rate of 369
car parking spaces (including 40 parking spaces for the childcare centre).
B. A contribution of $46,000 towards improvement of public transport infrastructure in lieu of the
potential shortfall of on-site car parking.
C. An application for a Development Permit for Operational Works shall be lodged with Council
to address the remediation of the adjoining environment reserve. This application shall
address the following matters:
1. Remove fill from park area;
2. Remove all stormwater outlets from park area;
3. Remove retaining structure from park area;
4. Remove smoko room from park;
5. Remove all debris from park;
6. Reinstate disturbed area to previous condition immediately prior to disturbance events;
7. Stabilise site for sediment and erosion;
8. Ensure all energy dissipaters associated with storm water are located outside the park;
9. Ensure stormwater entry into the park does not cause scouring;
10. Provide arborist appraisal of trees where works have occurred in their root zones and
replacement planting where appropriate;
All works required by the Development Permit for Operational Works shall be completed
within 12 months from the date of settlement of the appeal.
Page 9 of 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.