Skip to the record
The gold standard in government transparency.

Original source · versioned page text

SUPERSEDED Reference Document

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (14.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

                                                                                          ADG Consulting Pty Ltd


1    Introduction
     ADG Consulting Pty Ltd (ADG) was engaged by Eddie Hirsch care of Paul Clout Design Pty Ltd. to prepare
     a Dewatering Management Plan (DMP) for the proposed residential development within property
     described as Lot 43 on RP839221, situated at 13 Mermaid Quay, Noosaville, Queensland.
1.1 Proposed development
     The proposed development comprises the construction of a two‐storey residential building overlying a
     single level in‐ground basement on the 806 m2 site. Supplied information indicates that excavations to
     facilitate the basement construction will extend approximately 3.3 m below existing ground level to a
     maximum of approximately RL ‐0.6 m Australian Height Datum (AHD). Localised deeper excavations may
     be required for the construction of other structural elements (i.e. footings and pile caps), where required.
     Dewatering for basement construction is generally required to approximately 1.0 m below deepest
     excavation to allow safe construction.

     Groundwater seepage was recorded at depths of between 0.6 to 1.9 mbgl (equating to an approximate
     highest elevation of 0.3 m AHD), during preliminary geotechnical works (drilling) on the site by Douglas
     Partners in May 2024. Given the sites proximity to the Noosa River and the presence of groundwater
     within the excavation extent, dewatering will be necessary to allow the basement to be constructed in
     dry conditions.
1.2 Relevant guidelines
     The DMP was prepared with reference to the following documents:


          Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2018. Australian and
           New Zealand Governments and Australian state and territory governments (ANZG), Canberra ACT,
           Australia.
          Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2000. Australian and
           New Zealand Environment and Conservation Council and Agriculture and Resource Management
           Council of Australia and New Zealand (ANZECC/ARMCANZ).
          Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Department of Environment
           and Science (DES), Queensland Government.
          Noosa River environmental values and water quality objectives. The Department of Environment
           and Science (DES). 2022
          Guidelines for Managing Risks in Recreational Water. 2018. Australian Government, National Health
           and Medical Research Council (NHMRC).
          Monitoring and Sampling Manual 2018, Version 2 June 2018. 2018. Department of Environment and
           Science (DES).
          Queensland Water Quality Guidelines 2009, Version 3. 2013. The Department of Environment and
           Heritage Protection (DEHP).
1.3 General environmental duty
     The Environmental Protection Act 1994 describes that all persons in Queensland have a “General
     Environmental Duty” and that “a person must not carry out an activity that causes or is likely to cause
     environmental harm unless the person takes all reasonable and practicable measures to prevent or
     minimise the harm”.

     The Act requires that appropriate action be taken to report that environmental harm is occurring or has
     the potential to occur, unless the harm is authorised under an environmental protection policy, an
     environmental management program, a development approval, or an environmental protection order.
     This is known as the “Duty to Notify”. Failure to fulfil this duty is an offence and may result in prosecution.




ADG1668.24 Dewatering Management Plan_Rev0_12.07.24                                                           Page 1
Log in to download the original file

SUPERSEDED Reference Document.pdf · 14.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.