Decision Notice - Negotiated - DBW23 0093 [As Published] · DBW23/0093

of 5

Text shows just the words. Original shows the document exactly as it was published.

                      Coastal Protection
               9.     Existing structures within 6 metres from the seaward boundary of the site may be
                      replaced/renovated where required (eg pool fencing and balustrading, repairs to existing slab
                      etc), however any new additional works and/or structures must be setback a minimum of 6
                      metres from the seaward boundary of the site.
               10.    External colours and finishes must be of muted/environmental tones that blend with the
                      natural environment and low-reflective roofing and cladding materials.
                      Stormwater Drainage
               11.    Stormwater runoff from the development must be discharged to the street without causing
                      scour or damage to the subject site or any adjoining property.
                      Damage to Services and Assets
               12.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
               Any repair work which proposes to alter the alignment or level of ex existing services and assets
               must first be referred to the relevant service authority for approval.
               REFERRAL AGENCY PLANNING CONDITIONS
               The proposed development requires referral to Council for building work under Table 3 for the
               variation to the building setbacks.
               You are advised that:
               •      Council requires that any development approval for building work is subject to the
                      conditions stated in the development approval for DBW23/0093
                      Currency Period for Referral Agency Response
               •      This Concurrence Agency response is no longer valid if the use has not commenced within
                      4 years of the date of this notice, unless otherwise extended in writing by Council.
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Resubmission of Amended Plans Required
               1.     Deleted
                      Development Compliance Inspection
               2.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection.




                                                                                                      Page 3 of 5
Document Set ID: 22782095
Version: 4, Version Date: 25/01/2024

Used in these records

About this file

File size
135 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Negotiated - DBW23 0093 [As Published].pdf · 135 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.