Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Attachment C - Stormwater Management Plan - 30-32 Doonella Street_SMP-revA_full (00016826)

Attached to the e-mail MCU15/0053 Plans & Applicant's Response to Information Request.

of 28

Page text read automatically using OCR, there may be inaccuracies

a

aquaintel

5 Operational Phase Stormwater Management

The bioretention system will be owned by the developer (body corporate), who as
the asset custodian, will be responsible for the on-going maintenance of the water
quality device. Maintenance for the bioretention basin may involve the following:

1.

8.

2
3
4.
5
6
7

Scheduled inspections;

Removal of noxious plants or weeds;
Maintaining the desired vegetation;
Repairing erosion;

Unblocking inlets and outlets;
Removing litter and debris;
Managing algal or moss growth;

Maintaining the permeability of the filtration.

Operations and maintenance should be conducted in accordance with the
Maintaining Vegetated Stormwater Assets (Feb 2012) guideline.

14

Log in to download the original (Attachment C - Stormwater Management Plan - 30-32 Doonella Street_SMP-revA_full (00016826).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.