Original source · versioned page text
Attachment C - Stormwater Management Plan - 30-32 Doonella Street_SMP-revA_full (00016826)
Attached to the e-mail MCU15/0053 Plans & Applicant's Response to Information Request.
a aquaintel 5 Operational Phase Stormwater Management The bioretention system will be owned by the developer (body corporate), who as the asset custodian, will be responsible for the on-going maintenance of the water quality device. Maintenance for the bioretention basin may involve the following: 1. 8. 2 3 4. 5 6 7 Scheduled inspections; Removal of noxious plants or weeds; Maintaining the desired vegetation; Repairing erosion; Unblocking inlets and outlets; Removing litter and debris; Managing algal or moss growth; Maintaining the permeability of the filtration. Operations and maintenance should be conducted in accordance with the Maintaining Vegetated Stormwater Assets (Feb 2012) guideline. 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.