Original source · versioned page text
Attachment C - Stormwater Management Plan - 30-32 Doonella Street_SMP-revA_full (00016826)
Attached to the e-mail MCU15/0053 Plans & Applicant's Response to Information Request.
a aquaintel Table 2: MUSIC Base and Storm Flow Concentration Parameters — Urban Total Suspended Total . 0 a Total Nitrogen Solids Phosphorous (Logis mg/L) Land Use Parameter (Logio mg/L) (Logi) mg/L) 70 Storm Base Storm Base Storm Base Flow Flow Flow Flow Flow Flow Mean 2.18 1.0 -0.47 -0.97 0.26 0.20 Ground Std Deviation 0.39 0.34 0.31 0.31 0.23 0.20 Mean 2.43 1.0 -0.30 -0.97 0.26 0.20 Road Std Deviation 0.39 0.34 0.31 0.31 0.23 0.20 Roof Mean 1.30 N/A -0.89 N/A 0.26 N/A 00" Std Deviation 0.39 N/A 0.31 N/A 0.23 N/A Table 3: MUSIC Runoff Generation Parameters - Urban Parameter Urban Rainfall Threshold (mm) 1 Soil Capacity (mm) 500 Initial Storage (%) 10 Field Capacity 200 Infiltration Capacity Coefficient a 211 Infiltration Capacity Coefficient b 5 Initial Depth (mm) 50 Daily Recharge (%) 28 Daily Drainage (%) 27 Daily Deep Seepage Rate (%) 0 2.3.2. Catchment Areas The development site has been represented as four catchments, for the purpose of representing the site development. Table 4 outlines the catchment areas and imperviousness represented within the MUSIC model. The stormwater quality catchments are provided in Figure 2. Table 4: Catchment Areas Catchment Area (m7) Impervious Roof 825 100 Ground 1,249 50 Road 386 100 Road-Bypass 70 100 TOTAL 2,527
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.