Council archive · source document
Attachment 5 - Stormwater Managment Plan · 132007.12.8
Attached to the e-mail 132007.12.8 - Changes Application - Noosaville Medical and Professional Centre 90 Goodchap Street , Noosaville.
Plans and drawings: the text below has words only, no drawings.
Goodchap Street
Bioretention Basin
WSUD Catchment
Figure 2: WSUD Catchment and Locality Plan
2.3.3 MUSIC Model Layout
As the management of urban stormwater needs to take a holistic approach,
appropriate treatment measures need to be implemented. The correct utilisation of
various devices within the treatment train is imperative to target the desired
pollutants, from the gross solids to the fine colloidal partials. Figure 3 shows the
MUSIC model layout for the development.
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.