Council archive · source document
Attachment 5 - Stormwater Managment Plan · 132007.12.8
Attached to the e-mail 132007.12.8 - Changes Application - Noosaville Medical and Professional Centre 90 Goodchap Street , Noosaville.
Plans and drawings: the text below has words only, no drawings.
1 2
RL 8.00 RL 8.15
7.5
Post RL 8.25 Post dp Post Post
RL 7.33 RL 7.43
A stair 1
Landscaping - Refer to landscape plan
21 22 23 24 25 26 27 28 29 30 31 9 11 13 15 17
11
12
10
4
3
9
8
6
5
1
7
2
10 12 14 16 18
up
500h block planter
8
7
Line of balcony over
1000h block wall
up
B
20
1 Up
2
3
4
5
6
7
19
Carparking Level 2 8
9
10
Carpark Entrance
46 Below.
47 48
Stage 4 49 50 51 52 53 54
C
FSL 8.00
Property Boundary
18 32
17 33
45 44 43 42 41 40 39 38
16 34
FSL 9.50
D
15 35
14 36
Landscaping Below
13 37 Architects
12 11 10 9 8 7 6 5 4 3 2 1 MIDDAP ARCHITECTURE
Em Light Pty Ltd
E Architect Reg. No. - P Middap - 001850
abn 89 671 642 980
P.O. Box 1352
NOOSAVILLE QLD 4566
SB Ph - 0417 214 096
Email - [email protected]
F SB
CLIENT
SB SB SB SB SB
SB
N C Oliver Properties P/L
PROJECT
Proposed Carpark+Offices
FBG F F FV FB DF F
SET OUT POINT LOCATION
0,0
90 Goodchap St
NOOSAVILLE
1 2
DRAWING
DA Drawings
Level 2 Plan
scale date drawn
1:200 Mar 2017 PM
Proj no. Dwg no.
1717 DA 03A
Issue - For
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.