Council archive · source document
Attachment 5 - Stormwater Managment Plan · 132007.12.8
Attached to the e-mail 132007.12.8 - Changes Application - Noosaville Medical and Professional Centre 90 Goodchap Street , Noosaville.
Plans and drawings: the text below has words only, no drawings.
Contents EXECUTIVE SUMMARY I 1 INTRODUCTION 4 1.1 SITE CHARACTERISTICS 4 2 STORMWATER QUALITY 6 2.1 DESIGN OBJECTIVES 6 2.2 STORMWATER QUALITY TREATMENT 6 2.2.1 STRATEGY 6 2.3 MODELLING APPROACH 6 2.3.1 MUSIC PARAMETERS 6 2.3.2 CATCHMENT AREAS 7 2.3.3 MUSIC MODEL LAYOUT 8 2.4 TREATMENT MEASURES 9 2.4.1 BIORETENTION SYSTEM 9 2.4.2 SEDIMENT FOREBAYS 9 2.5 RESULTS 10 3 STORMWATER QUANTITY 11 3.1.1 EXISTING SCENARIO 11 3.1.2 DEVELOPED SCENARIO 13 3.1.3 MITIGATED SCENARIO 14 4 CONSTRUCTION PHASE MANAGEMENT 15 4.1 EROSION AND SEDIMENT CONTROL 15 5 ESTABLISHMENT AND OPERATIONAL PHASE MANAGEMENT 16 5.1 ESTABLISHMENT 16 5.2 OPERATIONAL 16 6 CONCLUSIONS 17 7 REFERENCES 18 APPENDICIES Appendix 1: Site Layout 19 Appendix 2: WBNM Output 20 Appendix 3: Preliminary Design Drawings 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Stormwater Managment Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.