Original source · versioned page text
Updated plans
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn proposed unit development, Cooroy
Taylor ct
artists impression
DRAWING SET INDEX
100 SITE PLANS
WD.101 COVER SHEET
WD.102 GFA AND SITE COVER
200 FLOOR PLANS
WD.201 MAIN LEVEL PLAN
WD.202 MEZZANINE PLAN
WD.203 ROOF PLAN
500 ELEVATIONS
WD.501 ELEVATIONS
600 SECTIONS DA2 for Development Approval
issue issue / amendment
WD.601 SECTIONS
19.01.2022 LF/ AB
issue date drawn by
client
Maroolingar P/L ATF Twenty20 UT
project
Maroolingar Twenty20 Cooroy
location
Lot 4, Taylor Ct. Cooroy
COVER SHEET
Aboda Lee Foster • director Scott Falconer • director
Design p - 0424 620 247 p - 0431 267 157
internal views
Group e - [email protected] e - [email protected]
the aboda design group trust Level 2 1794 David Low Way Coolum Beach,
ABN 56 266 884 746 Q. 4573. PO box 2449 Noosa Heads Q 4567
t/a aboda design group • BSA License -150580097 • www.aboda.com.au
artists impression artists impression
• This drawing is to be read in conjunction with engineers drawings & reports • Construction
to comply with all relevant SAA & NCC Codes & standard Bldg By-law 1975 & as amended •
Copyright for design & drawings remain the property of the authors • Verify all dimensions on
site prior to commencement of any works • These drawings are not to be used for scaling.
scale as shown @ A3 issue
drawing no.
WD.101 DA2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 4 (of 31)
Section 2
5
1.16
BW S 12
N
retaining wall
required (<1m) retaining wall required (<1m)
kitc
G
18 hen
IN
17 ette
IN
16
15
TA
14
N
13
H RE
12
8
6
11
STAFF
°
7
1m
5
.
6
910
R
0
80
7
8
'
AI
4
RECREATION
1
7
6
0H
N
6
"
ST
8
W
5
6
AREA 4 RE
°
7
3
TA
5
.
6
2
0
7
'
1
IN
4
1
6
IN
"
G
W
FFL 120.9m
0
? 0.77
U 01
BW S 12
X RL 120.7 X RL 120.880
PAD 120.6m
DP
LANDSCAPE
N
FFL121.000
TAYLOR COURT
60
0H
RE
(staff rec.)
TA
IN
IN
G
nage
sig
0
? 0.50
3
62.93 m2
W
U 01
BW S 12
FFL 120.9m
N
W
1 3
PAD 120.6m
"
"
2 FFL120.900
40
0H
1
RE
Section 3
TA
EXISTING SEWER
BIN X RL 120.86 IN
IN
STORE G
1
U
PUMPING STATION 1
5
U
4
X RL ?
01
5
01
2 kitc
0.08 0
4
12 0.30
hen
0
7
ette
'
GF
BW W 12
X RL ?
FFL 120.75m
52 GFA
7
64.13 m2
'
X lRL ? X RL 120.9 U 02
T
9
00
2
PAD 120.45m
13 A M A
11 FFL121.000
bin
l retaining wall required (<1m)
.
00
9
11
.5 9 M
2
hc bin BIN
18
bin
3
kitc
STORE 17
.
sh
16 hen
wa
4 .8 IN
15 18
X
X RL 120.66 14 17 ette
m2 EZZ
18 13 16
RL
8
17 12 15
R
16 11 14
3
AI
15 13
910 1112
?
14
ST
13
PWD 12 7
8
910
R
7m F
11 6
8
8
AI
5
X
910 7
R
4 6
8
ST
3
AI
RL
BIN 7 5
°
4
1
6
ST
12
X
5 3
2 LO O
X RL 120.527 2
?
STORE 4
ST
Section 4
RL
3 1
2
9.78 0
EP
U 11
1
11 0.30
?
°
0
1
PWD
1 2 3 FFL 120.8m
FFL120.650
BW W 12
circulation
1
U 03
TW ???.?
4 5 6 FFL 120.6m
T
R
7 8
PAD 120.5m X RL 120.65
motorcycle DP
1
BW ? ?? parking
PAD 120.3m FFL120.600
3
9.65 0
11 0.20
0
3
STAIR X RL 120.73
18171615
X RL 120.515
BW W 12
14131211
10 9 8 7
6 5 43
21
T
X RL 120.515
WINTER
FFL120.500
S
U FFL 120.45m
U 10
FFL 120.225m FFL 120.5m
S
01
3
G
1
FFL120.050
S
600 H RETAININ
FFL 120.45m
kitc
PAD 120.15m 18
17
PAD 120.2m 17
16
18 hen
ette
PAD 119.925m
SUN PATH
U 11 16 15
14
H
S
15 13
14
U 03 12
PAD 120.15m 13 11
FFL120.200
TW ???.? 12
X1RL 120.5 910
R
49 ARD
STAIR
8
11
U 12
AI
2
?? 10 7
U
BW ? 6
ST
9 5
8 4
7 3
6 FFL120.250 1
2
2
9.43 0
5
02
1
11 0.10
4
.1 2 S
0
3
U 12 ST
2
2
X RL 120.34 The text continues on section 5.