Original source · versioned page text
Updated plans
Original PDF page 3, section 11. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnos
fa l
8
isi dp 5
D05 l
5 ,9
Fc
ark
1
to r
'
4
3 HR
MD
i ng
9
2MDF
6
fw
Low Storage
.
sh. planter 1
2V
5
line of roof over
7
PWD lin
U 05
°
planter line of roof over
5
eo
isi
CP 2M access between U9/U10
hc
f ro
8
to r Lo
planter
900
b.
o/h
2m o/h
line of roof over CP of w
ov
wc STAIR for bioretention maintence
1 2 Visitor St
S
Visitor er ora
2 B
o /h 0
18171615 CP Visitor g
1 Visitor
90
14131211
to civ. eng'rs req'ts D02 e
2m o/h
10 9 8 7 D01 CP
6 5 4 3
2 1
planter D01
DPDP D01 D03
roller door
WD.601
400 H RET line of roof over line of roof over
D01 hc
CP D03 roller door
AINING line of roof over D02 fall
line of mezzanine over
roller door
900
o/h
red parking
900
roller door Exclusive use cove
o/h
2m o/h
CP
2 Visitor 1 Exclusive use cove
red parking
3
Visitor
line of mezzanine over
2 U 05
D0
CP Visitor
D02
1 Visitor U 06
D01
D03
B DP D01 roller door fall U5 250m2 + 65m2
D01 hc
roller door
hc
WD.601 fall Subject to certifier approval
line of mezzanine over
Exclusive use cove
red park ing Exc lusive use covered
parking 1
2
1
2
Low
Storage
High Bay Storage CP
(caretaker)
U 07
Low 3 3
HR FFL 120.100 3Employee Caretaker's
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.