Council archive · source document
Touram CD1.01 P3 - Site Ground Floor [As Published] · 132010.37
0.3 Dia. Storm Water Pipe Storm Water Pit \ , NS \\BE5S Turningys~ \Eircle \N Fire Hydrant Telstra Pit Power pole Tristania Drive INTERNAL UNIT AREAS Ground Floor 73,5m2 Garage 39.6m? First Floor 1.1m? Total 204.2m2 P3 22/10/09 MCU Application P2 07/10/09 Comment P1 10/09/09 Comment ISSUE DATE DETAILS This drawing is subject fo copyright and cannot be reproduced in whole orn part by any medium without the writen permission of MIDDAP DITCHFIELD ARCHITECTS. Architects MIDDAP DITCHFIELD Pty Ltd Architect Reg. No. - P Middap - 001850 T Ditchfield - 002195 a.b.n. 49 064 466 708 Cnr Mary and Thomas Streets NOOSAVILLE QLD 4566 Ph - (07) 5474 0877 Fax - (07) 5474 0906 Email - [email protected] CLIENT Touram Pty Ltd PROJECT PROPOSED DUPLEX LOCATION 20 & 22 Tristania Drive Marcus Beach SITE PLAN - Ground Floor ee go DRAWING Concept Design Site Ground Floor scale date drawn, 1:200@A3 Sept JW Proj no. Dwg no. 20 0912 CD 1.01 P3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Touram CD1.01 P3 - Site Ground Floor [As Published]Related documentApplication case desk ↗
About this file
- File size
- 444 KB (small file)
- File type
No other editions are linked here.