Skip to the record
The only place to find full transcripts.

Council archive · source document

01.5 - Da Form 1 · 132007.616.05

Attached to the e-mail Change to DA - 132007.616.05.

of 11

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

12) Boundary realignment

12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot

Hc a I ee

 

 

 

| Lot on plan description | Area (m2) | Lot on plan description | Area (m2)

12.2) What is the reason for the boundary realignment?

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?

   

(ee logmoe ne) Mime ecm ihm ee et Ie)

Existing or | Width (m) | Length (m) | Purpose of the easement? (e.g | Identify the land/lot(s)
| proposed? | _| pedestrian access) | benefitted by the easement

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.

14.1) What is the nature of the operational work?

 
 
  

   
  

      
 

    

O Road work O Stormwater O Water infrastructure
| (1 Drainage work O Earthworks O Sewage infrastructure
| O Landscaping O Signage O Clearing vegetation —

 

O Other — please specify:

 
 
 
 
 

 

     

| O Yes — specify number of new lots:
| O No

14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
$

PART 4 —- ASSESSMENT MANAGER DETAILS

15) Identify the assessment manager(s) who will be assessing this development application

 

16) Has the local government agreed to apply a superseded planning scheme for this development application?

 

| O Yes — a copy of the decision notice is attached to this development application

O Local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached

O No

PART 5 — REFERRAL DETAILS

17) Do any aspects of the proposed development require referral for any referral requirements?

 

Note: A development application will require referral if prescribed by the Planning Regulation 2017.

C1 No, there are no referral requirements relevant to any development aspects identified in this development application |
— proceedto Part6 _

| Matters requiring referral to the chief executive of the Planning Regulation 2017:

 

| C1 Clearing native vegetation

Page 5
DA Form 1 — Development Application details

Used in these records

About this file

File size
8.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

01.5 - Da Form 1.pdf · 8.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.