Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

RECOR Preliminary Stormwater Management Report - 20220130

of 15

Page text shows just the words. Original shows the document exactly as it was published.

 INTRODUCTION

RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application
for a residential duplex development located on the corner of Safari Street and Delorme Street, Noosa Heads.

This report investigates the stormwater management considerations for the existing and proposed development
site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council
requirements for stormwater drainage.




Project number 20220130
File RECOR Preliminary Stormwater Management Report - 20220130, 2022-11-08                                       Page 4 of 15
Revision 3


P +61 7 5211 1003                          A 75 Noosa Drive, Noosa Heads Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

RECOR Preliminary Stormwater Management Report - 20220130.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.