RECOR Preliminary Stormwater Management Report - 20220130

of 15

Page text shows just the words. Original shows the document exactly as it was published.

                                           Figure 3.2 – DRAINS Post-development catchments


The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
                              Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                                                       Delorme Street
                                                                                                       Qchange
                                           A.E.P               Qexisting     Qproposed    Qchange       (%)
                                                               (m³/s)        (m³/s)       (m³/s)
                                            1EY                0.014          0.016       0.002         14%
                                            50%                 0.016         0.018       0.002         13%
                                           0.2 EY               0.025         0.027       0.002          8%
                                            10%                 0.032         0.032          0           0%
                                             5%                 0.036         0.036          0           0%
                                             2%                 0.041         0.042       0.001          2%
                                             1%                 0.045         0.046       0.001          2%




The proposed development will result in a maximum of 2L/s increase across all storm events under the increased
2100 climate rainfall conditions, which is considered an insignificant increase beyond the present levels. As the
locality is not prone to flooding and no drainage issues have been identified, this small increase is not expected to
result in any significant impacts or risks to downstream infrastructure, therefore no attenuation is proposed for the
development.

In accordance with the Sustainable Building Design code, a 3,000L rainwater tank per dwelling is to be provided. A
low flow outlet consisting of a 43mm orifice plate in each tank is to be provided at the base of each tank, and a
100mm high flow outlet at the head of the tank will provide discharge for larger storm events. The high flow outlet
will be plumbed into the site’s internal drainage network.




Project number 20220130
File RECOR Preliminary Stormwater Management Report - 20220130, 2022-11-08                                         Page 9 of 15
Revision 3


P +61 7 5211 1003                          A 75 Noosa Drive, Noosa Heads Qld 4567     E [email protected]    recorconsulting.com
Log in to download the original file

RECOR Preliminary Stormwater Management Report - 20220130.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.