Council archive · source document
Decision Notice · 142005.2264
Form 6 - Decision Notice INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION File No: 2005/2264 Date of Decision: 18 July 2006 Applicant Details Name: Attunga Construction Pty Ltd Postal address: PO Box 995 NOOSA HEADS QLD 4567 Phone no: 0418 787 300 PROPERTY DESCRIPTION Street address: 18 Henderson Street, Sunshine Beach Real property description: Lot 1 SP 171057, County of March, Parish of Weyba Owner Details Name: Graham Sydney Wall Postal address: PO Box 995 NOOSA HEADS QLD 4567 Referral Agencies Referral Agency Address Basis Nil Application Type Development Development Details Preliminary Approval Development Permit Operational Works Landscaping, Car Parking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control & Earthworks No Yes Decision details Council decided to approve the application and grant a Development Permit, subject to conditions. applicable codes The developer must comply with the following codes for self-assessable development related to the development approved under this Development Permit:- Not applicable. SUBMISSIONS Not applicable. Conditions The approval is subject to conditions. Noosa Council’s conditions are attached. Further Development Permits Required Type of Development Permit required Subject of the required Development Permit Nil Rights of Appeal Rights of appeal in relation to this application are attached. Assessment Manager Name: Noosa Council Signature: Date: 18/07/06 Noosa Council Conditions INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Land Use The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the approved plan of Development. The approved plans are titled Landscape Plan No. LP 01 prepared by Tropcial Plantscapes of Noosa dated December 2005 and may be amended by these conditions and annotations detailed on the approved plan. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and be visible at all times to ensure prompt access in case of emergency. The landscape construction shall be implemented in accordance with the amended landscape plan, planting schedule and horticultural industry best practices. All trees shall be planted a minimum of 1 metre from all underground services. In order to achieve a greater element of vegetation screening, provide substitute planting for the following medium to small shrubs with larger and taller coastal native planting as detailed at 2 metre centres: PLANTS TO BE REPLACED SUBSTITUTIONS ALECTRYON coriaceus ELAEOCARPUS reticulatus ACRONYCHIA imperforata ELAEOCARPUS reticulatus SYZYGIUM australe SYZYGIUM oleosum SYZYGIUM Cascade SYZYGIUM australe SYZYGIUM oleosum ACMENA smithii minor ACMENA smithii SYZYGIUM paniculatum Refer to the approved landscape plan and planting schedule for amendments and details. All environmental weeds located within the vegetated road reserve shall be removed prior to the commencement of use of the premises. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. Disposal for firewood. Disposal for landscaping purposes. Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. The disposal method for clearing works is to be submitted in conjunction with an application for a Development Permit for Operational Work. The Applicant is advised that other methods may be considered provided full details of the method are submitted. The Applicant is advised that burning off is an unacceptable method of disposal. This Development Permit lapses if the development has not happened by 18 July 2008, unless application to extend the currency is approved by Council. Land Development The development shall be carried out in accordance with Engineering drawings Nos.M2992/C01, C02, C03 & C04 as prepared by Barlow Gregg & Associates and 05112-2A as prepared by Ian Bradford or as modified herein. Roof and surface runoff connection to Council’s kerb and channel system shall be as shown on drawing No. 05112-2A. Kerb adaptors shall be used in the kerb. Although not shown on this drawing surface drainage of the landscaped areas must be connected to this system. A footpath 1.2 metres wide shall be constructed across the full frontage of the development. The footpath shall have a slip resistant surface. The alignment to be as indicated on plan No.M2992/C03 (Barlow Gregg). Note 4 “Clearing Of Vegetation” as shown on Plan No. M2992/C04 is not permitted by Council. The names of any proposed contractors for the footpath works are to be submitted in writing, together with copies of current Public Liability and Workers Compensation Insurances, for consideration for approval by the Manager-Land Development seven (7) days prior to pre-start meetings and commencement of works. A separate letter will then be issued approving the Contractor (or otherwise) for the works. No other Contractor or Subcontractor shall be engaged to carry out the works or any part of the works without the written approval of the Manager-Land Development. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of intention to commence works to arrange a “pre start” meeting regarding the civil works. The Consulting Engineers for the project shall be currently Registered Professional Engineers of Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with Council’s Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-site meetings. Construction Technical Officer will also sign the form at each stage when conditions required have been satisfied. The works will be accepted “On Maintenance” after this form, signed by the inspector for each stage is complete, together with a letter from the Engineer requesting that the works go “On Maintenance”. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project. (This person will be the contact for the project). An inspection is to be carried out with the relevant Council officers, the Contractor and Supervising Engineer after road centrelines have been established, and prior to clearing being carried out. This inspection is to deal with the limits of clearing to be carried out for this development. This meeting is to take place prior to the “Pre-start” meeting. Council standards shall apply to these works unless otherwise modified herein. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care during the construction of the engineering works to ensure that Council property, road pavements or facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any damage or interference whatsoever. If any Council property or facilities should be damaged by the Applicant or any of its Consultants or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to the commencement of the use or, alternatively, the Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to the Council prior to the commencement of the use, provided that in the case of emergency the Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being paid prior to the commencement of the use. The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance to residents and/or tenants in the vicinity of the development. Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended hours are approved by the Manager-Land Development or his nominee. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act. Safe pedestrian access on Henderson Street shall be maintained at all times. Should footpath / road closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure. Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system or natural waterways. Although the sediment and erosion control measures have been approved on drawing NoM2992/C04 (Barlow Gregg), Council’s Manager – Land Development may request further controls to be installed should approved measures be inefficient. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of satisfactory “As Constructed” records shall be submitted to Council. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council’s records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed on construction works during the maintenance period, which is a minimum period of 12 months duration. Such bond must be lodged by, and shall only be accepted from the Developer for the works. The works to become Council assets will not be accepted "On Maintenance" until the landscaping is completed. These works are also to be in compliance with the relevant conditions of Development Permit No. 2006/0128 and subsequent development approval for this property. Notwithstanding that Council has checked the plans with due care, where it is found during construction that variations from Council's standards exist, then Council standards shall apply Local Laws, Policies & State Regulation Requirements INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM CONDITIONS OF APPROVAL Should any changes or modifications to the approved plans be required as a result of construction constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Appeal Rights INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION The following is an extract from the Integrated Planning Act (Chapter 4). Division 8 - Appeals to court relating to development applications Appeals by applicants 4.1.27.(1) An applicant for a development application may appeal to the court against any of the following- the refusal, or the refusal in part, of a development application; a matter stated in a development approval, including any condition applying to the development, and the identification of a code under section 3.1.6; the decision to give a preliminary approval when a development permit was applied for; the length of a currency period; a deemed refusal. (2) An appeal under subsection (1)(a) to (d) must be started within 20 business days (the “applicant’s appeal period”) after the day the decision notice or negotiated decision notice is given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. Appeals by submitters 4.1.28.(1) A submitter for a development application may appeal to the court about- the giving of a development approval, including any conditions (or lack of conditions) or other provisions of the approval; or the length of a currency period for the approval. (2) The appeal must be started within 20 business days (the “submitters appeal period”) after the day the decision notice or negotiated decision notice is given to the submitter. (3) If a person withdraws a submission before the application is decided, the person may not appeal the decision. (4) If an application involves both impact assessment and code assessment, appeal rights for submitters are available only for the part of the application involving impact assessment. (5) If an application is processed under section 6.1.28(2), appeal rights for submitters for the application are available only for the aspects of the development that would have required public notification under the repealed Act. (6) If an application involves assessment against a concurrence agency code, appeal rights for submitters for the application are not available against the part of the approval that represents the concurrence agency’s response for the code. Appeals by advice agency submitters 4.1.29.(1) An advice agency may, within the limits of its jurisdiction, appeal to the court about the giving of a development approval for a development application if- the development application involves impact assessment; and the advice agency told the applicant and the assessment manager to treat its response to the application as a submission for an appeal. (2) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. Appeals for matters arising after approval given (co-respondents) 4.1.30.(1) For a development approval given for a development application, a person to whom any of the following notices have been given may appeal to the court against the decision in the notice- a notice giving a decision on a request for extension of the currency period for an approval; a notice giving a decision on a request to make a minor change to an approval. The appeal must be started within 20 business days after the day the notice of the decision is given to the person. Subsection (1)(a) does not apply if the approval resulted from a development application (superseded planning scheme) that was assessed as if it were an application under a superseded planning scheme. Also, a person who has made a request mentioned in subsection (1) may appeal to the court against a deemed refusal of the request. An appeal under subsection (4) may be started at any time after the last day the decision on the matter should have been made. Division 9 - Appeals to court about other matters Appeals for matters arising after approval given (no co-respondents) 4.1.31.(1) A person to whom any of the following notices have been given may appeal to the court against the decision in the notice- a notice giving a decision on a request to change or cancel a condition of a development approval. a notice under section 6.1.44 giving a decision to change or cancel a condition of a development approval. The appeal must be started within 20 business days after the day the notice of the decision is given to the person. Also, a person who has made a request mentioned in subsection (1)(a) may appeal to the court against a deemed refusal of the request. An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. Appeals against decisions to change approval conditions under the repealed Act 4.1.33A.(1) A person who is dissatisfied with a decision made on an application to change the conditions attached to an approval given under section 2.19(3)or section 4.4 of the repealed Act may appeal to the court against- the decision; or a deemed refusal of the application. (2) An appeal under subsection (1)(a) must be started within 20 business days after the day notice of the decision is to be given to the person. (3) An appeal under subsection (1)(b) may be started at any time after the last day a decision on the matter should have been made. Appeals against local laws 4.1.33B.(1) An applicant who is dissatisfied with a decision of a local government or the conditions applied under a local law about the use of premises or the erection of a building or other structure permitted by the planning scheme may appeal to the court against the decision or the conditions applied. (2) The appeal must be started within 20 business days after the day notice of the decision is given to the applicant. Section 3.1.6 (Preliminary approval may override local planning instrument) Section 6.1.44 (Conditions may be changed or cancelled by assessment manager or concurrence agency in certain circumstances) 8 NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 8 SEP p:\civica\documents\dd\010\from2000\010-2005-00002264-001\0006decnotice.doc SEP p:\civica\documents\dd\010\from2000\010-2005-00002264-001\0006decnotice.doc Page: 1 Insert name and address of agency. Page: 1 If refused, delete the section headed Referral Agencies Referral Agency Address Basis <<name of referral agency>> <<address of referral agency>> <<referral basis>> Application Type and Decision details Council decided to < applicable codes The developer must comply with the following codes for self-assessable development related to the development approved under this Development Permit:- <<insert applicable codes for self-assessable development >>. SUBMISSIONS <<insert submission details if applicable>>. See attached list. Conditions and insert reasons for refusal. Page: 1 Insert Designer’s Name, Plan No. and Date of Plan. Page: 1 Insert Yes or No in each column adjacent to each category. Page: 2 Type name of officer signing
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision NoticeRelated documentApplication case desk ↗
About this file
- File size
- 143 KB (small file)
- File type
- DOC
No other editions are linked here.