Capital Works Program 2024 - 2025 Capital Works Program 2024 - 2025
Project Project Description Total Cost ($) Project Project Description Total Cost ($)
Shire Wide - VHF Council investigated and undertook preliminary design works for a proposed VHF 610,000 Doonan - Eumundi A new reverse vending machine has been installed at the Doonan Resource Recovery 200,000
Infrastructure radio communication network to address known coverage issues and to provide Landfill - Container Facility, offering the community a quick and convenient way to recycle and claim
Upgrade continued connectivity during and following disaster events and installed GPS Return Point refunds. Powered by artificial intelligence, the machine efficiently sorts and processes
vehicle monitoring in all Council vehicles. This ensures driver safety by enabling eligible containers.
quick location and assistance in disasters and hazardous conditions and provides
a record of vehicle movements for post-disaster analysis. It additionally allows real- Pomona - Bathroom and toilet facilities in the Council-owned community building servicing 80,000
time monitoring and coordination in disaster events, enhances response times and Kindergarten - the Pomona & District Kindergarten were upgraded to better support the needs
improves data collection and analysis to identify improvement opportunities. Bathroom Facilities of attending children and staff. The project significantly improved hygiene, safety,
Upgrade and accessibility. During the upgrade, a known section of asbestos was also safely
Noosa Heads - Approximately 700 metres of water main was renewed along Claude Batten Drive through 185,000 removed, further enhancing the health and safety standards of the facility.
Claude Batten Dr to the Noosa River Mouth. This project included the restoration and re-vegetation of the
natural area upon completion to preserve the local environment. The upgrade significantly Noosa Shire - Reseal The FY2024/25 Reseal Program delivered improved road surfaces across key areas 5.5M
- Plumbing
enhances the reliability of the mains water supply servicing public amenities, showers, taps, Program of the Noosa Shire. This annual initiative plays a critical role in maintaining the safety,
lifeguard towers, irrigation systems, and the sand pumping station, addressing water loss durability, and performance of the region’s road network. By renewing worn surfaces, it
issues associated with the aging infrastructure. extended the lifespan of existing infrastructure, reduced future maintenance costs, and
enhanced driving conditions for residents and visitors alike.
Tewantin Childcare The roof at Tewantin Childcare (C&K) at 19 Moorindil Street was replaced as it had 185,000
(19 Moorindil St) - reached the end of its useful life. The project ensures the building is fully protected from Noosa Shire Numerous pathways across Noosa Shire have been renewed, constructed, or 1.16M
the elements and included the installation of new extraction fans and associated electrical Pathway Renewal upgraded, enhancing connectivity, accessibility, and safety for pedestrians and
Roof Replacement
works to support ventilation and functionality within the facility. Program cyclists throughout the region.
Peregian Beach The Peregian Beach Skate Park was upgraded with valuable input from local skaters, 495,000
Skate Park Design & resulting in a revitalised facility featuring three distinct zones to cater to all skill levels.
Construction Enhancements include improved drainage, new seating, and the retention of the
park’s popular shade sail, ensuring it remains a welcoming and functional space for Disaster Recovery Works Projects
Noosa Council Annual Report 24/25
the community.
Noosaville - Apex The aged fitness equipment was completely replaced, including new soft fall rubber 126,000 Project Project Description Budget ($)
Park Fitness surfacing to improve impact attenuation and drainage. All equipment has been
Equipment Upgrade reoriented to face the river, offering users an enhanced outlook. The upgrade also Black Mountain Largest landslide in recent history to impact a road asset. The constructed solution combined: 50.1M
includes accessible fitness units for people with a disability, developed in consultation Road landslide – Deep bored piles socketed into stable material beneath the slip plane,
with stakeholders to ensure inclusivity and usability. remediation – Ground anchors providing additional support to concrete capping beams
– Horizontal drill drains to improve groundwater management.
Noosa Heads - Lions A high-use facility with limited maintenance over the past decade, underwent a major 380,000 This solution addressed immediate stability requirements and long-term resilience
Park - Amenities upgrade to improve both functionality and appearance. As a key asset influencing the against future disasters.
Upgrade visitor experience and image of the Noosa Shire, the refurbishment aimed to restore
the facility to a standard that reflects the area’s reputation. Works included significant Black Pinch Four landslides impacting the road asset. The constructed solution combines: 12.2M
Road landslide – Bored piles socketed into stable material
internal and external improvements, upgrades to meet current disability compliance
remediation – Concrete capping beams or concrete stabilising blocks
standards, and the installation of additional external showers to better serve the local
– Ground anchors to stabilise upslope
community and tourists alike. This solution addressed immediate stability requirements however due to global instability in
Pomona SES New onsite amenities were completed at the Pomona SES shed on Hospital 97,000 this area, new landslides have emerged in early 2025.
Amenities Upgrade Street, funded by Council and a Queensland Government SES Support Grant. The Upper Pinbarren Nine landslides impacting the road asset. The constructed solution relies mostly on soil 14.2M
works delivered a fit-for-purpose accessible bathroom for use by both volunteers Creek Road, Kin nailing the extents of the slip failures. One section received safety guard rail to compensate
and visitors, along with external upgrades to address and formalise stormwater Kin landslide for road width instability.
management and minor overland flooding issues, improving the functionality and remediation
resilience of the facility.
Schreibers Road, Replaced a failed culver structure with a bridge. This new structure also incorporated a 6.8M
Noosaville - Noosa The outdoor space at Noosa Leisure Centre was upgraded to create a safe, functional 90,000 Cooran Bridge more robust solution for the intersecting SEQWater water main. Council’s commitment
Leisure Centre area suitable for basketball training and other court-based activities, including a hit- to ensuring a better solution for not only the road asset but the water security for the
- Outdoor Court up wall. The project utilised a modular outdoor court tile system installed over existing region was recognised by QRA via the award of a Betterment Grant.
Upgrade concrete, offering a cost-effective, durable, and visually appealing solution with a
longer lifespan than traditional painted surfaces. This enhancement may relieve Musa Vale Road, A complex project in a highly constrained section of road. The constructed solution combines: 2.16M
Cooroy landslide – Bored piles socketed into stable material
some pressure on the indoor courts by supporting additional programming but also
remediation – Concrete capping beams
significantly improves the outdoor area’s amenity, multi-use functionality, and revenue
Key to the success was the addition of a temporary sidetrack road to allow community
potential for the facility. continued access during the construction period.
Sunrise Beach - 56 A new concrete retaining wall was constructed to reduce slope instability risks and 1.08M Disaster Toolbox This program saw the launch of the use of the following products and services: 0.3M
David Low Way enhance safety for pedestrians and nearby property owners. Complemented by Assets – Sand bays at strategic locations
- Retaining Wall landscaping and replanting, the stabilisation works contribute to a more resilient – Sand bins for responsive locating for disaster impacted localities
Construct and visually appealing environment. Additionally, a new three-metre-wide shared – Camera equipment and training for digital record keeping of disaster impacts
pathway was completed, improving safety and accessibility for pedestrians, cyclists, – Traffic Plan for Tewantin foreshore area when flooded.
and mobility scooter users. – Flood monitoring equipment to support Disaster Dashboard
82 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.