Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Attachment 3 - Construction Management Plan

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
             CONSTRUCTION
            MANAGEMENT PLAN
                                                      FOR

    Westcon Site Management Pty Ltd

                       9 Ann Street,
                    Noosaville, Qld, 4566
                                               ABN 27 007 113 215
                                                QBSA No. 740902
                                              NSW licence 121727C


                                            Phone: 07 5451 0542
                                             Fax: 07 5451 0562
                                             Mob: 0409 265 632
                                                PO Box 424
                                           Maroochydore Qld 4558




          © Copyright, July 2019
           Westcon Site Management Pty Ltd
           This document in whole or in part, may not be copied, reproduced, stored in any form within a retrieval
           system or transmitted by any means without the prior written permission of the Director




                                                                           CONTROLLED COPY NO.

Issue 1                 July 2019
Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 259 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 16 pages

Page 2

                                  Westcon Site Management Pty Ltd

                      AMENDMENT SHEET
 PAGES                AMENDMENT             ISSUE   DATE   APPROVED
                                                              BY




Issue 1   July 2019                                         (i)

Page 3

                                                                      Westcon Site Management Pty Ltd



                                            TABLE OF CONTENTS
                                                                                                  Page No.
                  Amendments and Distribution ......................................... 1
                  Environmental Policy ...................................................... 2
          1.      Introduction ...................................................................3
          1.1     Scope of the CMP ............................................................ 3
          1.2     Application of CMP......................................................... 3
          2.      Preparation of the CMP ................................................ 4
          2.1     Introduction ..................................................................... 4
          2.2     Initial Environmental Review .......................................... 4
          2.3     Legal Requirements ......................................................... 4
          2.4     Site Specific Considerations ............................................ 5
          3.      General Requirements ................................................... 5
          3.1     Responsibilities ............................................................... 5
          3.1.1   Manager of the Project..................................................... 5
          3.1.2   Employees ....................................................................... 6
          3.1.3   Subcontractors ................................................................. 6
          3.2     Training ........................................................................... 6
          3.3     Communication ............................................................... 6
          3.4     Records ........................................................................... 7
          4.      Management of Environmental Impacts ...................... 7
          4.1     Land Management ........................................................... 7
          4.1.1   General ............................................................................ 7
          4.1.4   Contaminated Soils .......................................................... 8
          4.1.5   Acid Sulphate Soils (ASS) ............................................... 9
          4.1.6   Cultural Heritage ............................................................. 9
          4.2     Construction Material Management............................. 9
          4.3     Storm and Waste Water Managem9t ........................... 9
          4.3.1   Storm Water .................................................................... 9
          4.3.2   Other Pollutant Control Measures .................................... 10
          4.3.3   Waste Water .................................................................... 10
          4.4     Chemical management .................................................. 10
          4.5     Air Quality Management............................................... 11
          4.6     Excavation Activities ..................................................... 11
          4.7     Waste Management ....................................................... 12
          4.8     Noise Management ........................................................ 12
          4.9     Energy and Raw Materials Management ..................... 13
          4.10    General Activities Summary ......................................... 13
          5.      Fire Ant Management ................................................... 13
          5.1     Restricted Area ................................................................ 13
          5.2     Non-restricted Area ......................................................... 13
          6.0     Workshop Activities ...................................................... 14




Issue 1                 July 2019                                                                            (ii)

Page 4

                                                    Westcon Site Management Pty Ltd



                             AMENDMENTS & DISTRIBUTION

AMENDMENTS

   (a) All controlled copies of this Plan are numbered and are subject to amendment as required
       and the relevant pages within the Plan are replaced. The revision system is administered by
       the Accounts Officer.

   (b) Amendments are identified by the next consecutive issue indicator and the date of issue.

   (c) The Director is required to give consideration to a re-issue of the whole Plan if he considers
       that the number of changes to the manual have a significant impact on the readability and
       cross referencing of the document. All new issues supersede all previous issues.

   (d) The Amendment Sheet indicates all amendments. Recipients of new issues are responsible
       for the approved disposition of superseded pages and the updating of their copy of the Plan.

   (e) Amendments are to be approved by the Director and the Amendment Sheet signed.

DISTRIBUTION

    The Construction Management Plan and supporting checklist are retained electronically and
    Project Managers have access to this but cannot make amendments. Amendment control is as
    specified in 1.2.1 above.

    Where contractually specified, a Client is issued with an uncontrolled copy, unless specified
    otherwise.




Issue 2           July 1                                                             Page 1

Page 5

                                                    Westcon Site Management Pty Ltd


                                       ENVIRONMENTAL POLICY

          Westcon Site Management Pty Ltd has the capability to construct medium rise
          domestic, commercial and industrial projects and any renovations associated with
          such projects. The company specialises in aged care villas and disabled persons
          facilities and can provide standard approved designs for these.

          Our objectives are to provide a fully compliant performance with quality construction,
          project completion on time and strive for continued improvement. These objectives
          are achieved through our commitment to quality management practices based on the
          ISO 9001:2008 standard which is reviewed regularly to ensure that the system
          continues to be the most appropriate for our business and is effective in achieving our
          objectives.

          We are also committed to managing the environment in a positive way by:

          • Adopting the environmental controls specified for a project in accordance with
            client, legislative and regulatory controls;
          • Adopting appropriate site pollution control measures for soil, material spoils,
            waste water and chemicals; and reduce, where possible, the environmental
            impact of our operations by minimizing our waste, discharges and emissions,
            and using resources and energy more efficiently;
          • Monitoring the environmental behaviour of employees and subcontractors to
            ensure protection of the environment, through provision of information,
            supervision and training;
          • Ensuring compliance with the environmental protection practices of local
            authorities.

          Through the pursuit of our objectives, we continue to have a good relationship with
          all our clients and can maintain our excellence of service through achieving the full
          support of our suppliers and subcontractors in both our commitment to quality and
          our WH&S objectives.
.




                   Billy Alderson
                            Director




Issue 2            July 1                                                            Page 2

Page 6

                                                         Westcon Site Management Pty Ltd


                            CONSTRUCTION MANAGEMENT PLAN

1.    Introduction

1.2 Scope of the CMP

      Project Name: 9 Ann Street, Noosaville, Qld, 4566

      This Construction Management Plan (CMP) provides an outline of the environmental
      protection measures that will be applied to the above-named project to meet any
      specification, relevant laws and regulations and other requirements of:

      Client Name: Australian Residential and Commercial Developments Pty Ltd

      Issues which will be controlled at the project include:

          • Emission to air
          • Release to water
          • Noise
          • Waste management
          • Management of land (weed management)
          • Use of raw materials and natural resources
          • Local environmental and community issues


1.3 Application of CMP

      This Construction Management Plan applies to all activities of Westcon Site Management
      and its subcontractors to ensure that all construction work and site activities are carried out
      in a systematic and controlled manner to eliminate or minimise the possibility of damage to
      the environment in regards to:

          • Site establishment
          • Construction
          • Testing and commissioning
          • Demobilization
          • Site clean up


      The CMP and supporting documents are reviewed regularly and are required to meet the
      requirements of contract specifications. New procedures are developed for the construction
      of the above named project as required. Westcon Site Management is responsible for
      monitoring all stages of the implementation and execution of this CMP through the
      application of regular inspections.

      The practices stated in this CMP are required to be implemented in respect of all work
      undertaken by the company in fulfilling the contract scope of work.



Issue 2               July 1                                                         Page 3

Page 7

                                                        Westcon Site Management Pty Ltd

2.    Preparation of the CMP

2.1 Introduction

      Each activity that has an impact on the environment will be planned at the earliest possible
      stage to ensure that it can be managed effectively and will be monitored and reviewed for
      environmental effects during the implementation of the work for the project listed in section
      1.2. This will be achieved through:

          • Identification     of environmental aspects as applicable to our activities and contract
           specifications.
          • Determination of legal and other requirements.
          • Development    of procedures to provide measures that will be incorporated into the
           activities to ensure that they are controlled.

2.2 Initial Environmental Review

      The following list is to be used to determine which environmental aspects are to be managed
      during the project.

             Noise
             Air Quality
             Water Quality
             Excavation and soil stripping
             Soil handling, stockpiles
             Off-site movement of soil
             Construction activity
             Maintenance Activities
             Handling and storage of oils, greases, fuels and chemicals
             Vehicle Movements
             Site Clean-up

2.3 Legal Requirements

      Consideration will be given to obtaining licenses and permits for at least the following
      activities, were applicable:

          • Disposal of regulated waste.
          • Handling and storage of hazardous materials.
          • Construction activities in environmental sensitive areas.
          • Disruption of traffic or services.


      Permits and other licences may be required based on contractual or local government
      requirements and the need for these will be assessed before the project commences.




Issue 2               July 1                                                         Page 4

Page 8

                                                      Westcon Site Management Pty Ltd



2.4 Site specific considerations

      The construction site, is located at 9 Ann Street, Noosaville, Qld, 4566

      The project is to undergo the following activities:

      Duplex - 2 x residences

3.0 General Requirements

3.1 Responsibilities

3.1.1 Project Manager
      The Director or Site Manager is responsible for daily management of site operations,
      supervision, administration and profitability of the facilities, monitoring of production
      costs and the management of plant maintenance in relation to this project.

          The Director or Site Manager is required to ensure that, before commencement of site
          activities, the CMP is developed to address the environmental protection of possible
          impacts and site-specific risks.

          The Director or Site Manager is required to ensure that:

           • Environmental protection requirements are implemented and adhered to throughout the
             site for contractors and employees.
           • Interfacing   and full co-operation with contractors, suppliers and authorities is
             maintained at all times.
           • Potential adverse environment impacts are assessed and monitoring of compliance with
             the CMP is conducted.
           • Environmental accidents, incidents and complaints on the site are reported, investigated
             and recommended actions implemented.
           • Environmental records are maintained.
           • Staff and subcontractors are assisted in identifying and implementation corrective
             actions as required.
           • Reviews of the operation of the CMP are conducted.




Issue 2              July 1                                                          Page 5

Page 9

                                                           Westcon Site Management Pty Ltd



           • Specialist consultants are engaged to advise on particular environmental issues where
             required.

3.1.2 Employees

          All site personnel have the responsibility to:

           • Apply environmental principles to all daily activities.
           • Adhere to the environmental procedures provided in this CMP.
           • Report environmental accidents or incidents to the Director or Site Manager without
             delay.

          All site personnel are to be held accountable for compliance of environmental management
          in their activities.

3.1.3 Subcontractors

          All subcontractors operating on the site are required to comply with the requirements of
          this CMP, which will include:

           • Make their personnel available for induction and familiarization with the requirements
             of the CMP developed for the site.
           • Comply with work methods/procedures stipulated for their particular work areas.
           • Ensure that their plant and equipment conforms to the requirements stipulated for the
             site.
           • Meet regularly with the Director or Site Manager to discuss environmental management
             issues.
           • Subcontractor’s activities will be inspected from time to time to ensure compliance.


3.2       Training

          To ensure that all employees and contractors are aware of each of their individual
          responsibilities, training and awareness sessions will be provided, where required, which
          will include:

           • Initial project induction; and
           • Before environmentally sensitive activities are commenced.




Issue 2               July 1                                                       Page 6

Page 10

                                                     Westcon Site Management Pty Ltd

3.3       Communication

          Responsibilities, environmentally sensitive activities and environmental issues will be
          communicated to the relevant personnel through:

           • Initial project induction
           • Site project meetings
           • Tool box meetings


          Communications received from external parties will be maintained as normal records. All
          complaints relating to the construction activities must be recorded on the appropriate
          Action List with the following details:

           • Time, date and nature of complaint including urgency and significance
           • Type of communication (telephone, letter, personal etc)
           • Name, contact address and contact telephone number of complainant (note: if the
             complainant does not wish to be identified then ‘not identified’ is to be recorded)
           • Response and investigation undertaken as a result of the complaint
           • Names of persons responsible for receiving and/or investigating complaint
           • Action taken as a result of the complaint investigation and signature of responsible
             person

3.4       Records

          In order to provide evidence that environmentally sensitive activities are carried out in
          compliance with contract requirements and demonstrate effective operation of the
          Environmental Management System. Records are to be progressively generated and
          maintained for:

           • Manufacturer safety data sheets
           • Permits and licenses
           • Monitoring data
           • Training
           • Nonconformances and environmental infringements
           • Complaints
           • Corrective and preventative actions


4.        Management of Environmental Impacts

4.1       Land management

          The purpose of land management is to ensure that the extent of disturbance to land is to be
          the minimum required for the construction activities, and to prevent the contamination of
          land on or around the site.




Issue 2                 July 1                                                       Page 7

Page 11

                                                       Westcon Site Management Pty Ltd



4.1.1 General

          Unless specified, the location of any areas requiring earthworks or excavation is required
          to be verified for contaminated materials (eg. acid sulphate soils, asbestos or chemicals) or
          cultural significance. This is done by ensuring that sites where construction activities are to
          take place are not listed on the Environmental Management Register managed by the
          Environmental Protection Agency (EPA) and/or by soil testing. This is, typically, be the
          responsibility of the insurance and owner clients, unless it has been delegated in the
          contract.

          Topsoil and excavated materials that is to be re-used for re-vegetation is to be stockpiled in
          designated areas. Stockpile surfaces that are likely to be exposed for lengthy periods are to
          be provided with temporary erosion control measures, such as being sprayed with
          hydromulch or covered with tarpaulins. Silt fencing is also to be placed around the base of
          the stockpile.

          The Director or Site Manager is required to ensure that excavated materials that have been
          treated to neutralise contaminants is to be reused or disposed of as directed or specified.

          The Director or Site Manager is required to ensure that any fill imported by subcontracted
          services is obtained from sites free from contamination and fire ants and certificates are to
          be sighted where required from the supplier to confirm compliance with requirement.

4.1.2 Contaminated Soils

          The Director or Site Manager is required to ensure that sites identified as contaminated,
          approval from the client and/or the relevant authority must be obtained for the proposed
          activities before work commences. He is required to ensure that subcontracted personnel,
          engaged in the removal of contaminated materials, are to be adequately protected with
          appropriate personal protective equipment.

          All excavated contaminated materials must be segregated from any clean material and
          must be treated or maintained so that dust is not produced, and contamination of the
          groundwater is prevented.

          The Director or Site Manager is required to ensure that the subcontracted soil removal
          agent has selected licensed and approved transport operators for the transport of
          contaminated materials and that waste disposal dockets are used to record adequate
          tracking and recording of the chain of custody of the contaminated material occurs.




Issue 2               July 1                                                            Page 8

Page 12

                                                      Westcon Site Management Pty Ltd

          Where unexpected contamination is discovered as a result earthworks or excavation, the
          Director or Site Manager is to be informed immediately, and if required the local council
          or EPA is also notified. The activity in the area affected must cease until further
          instructions.

          The subcontracted agent is responsible for thoroughly washing down plant and equipment
          used in the excavation, removal and transport of contaminated materials on completion of
          operations and contaminated wash water disposed as appropriate.

          Any soil contamination, which may result from spills, loading of contaminated materials or
          handling of dangerous goods, must be cleaned or treated as soon as possible.

4.1.3 Acid Sulphate Soil (ASS)

          As appropriate, ASS may be either transported to an area set aside for treatment or returned
          to its original environment or disposed of to an authorised landfill. Material identified as
          acid sulphate is to be kept wet and/or covered in a suitable bunded area to prevent water
          from leaching out and to keep out stormwater.

          Transport of ASS to an off-site location must be done in such a manner to prevent
          contamination of land and waterways. Acceptable practice is to cover loads and avoid
          transporting wet materials unless trucks are suitably equipped to prevent liquid spillage.

          Specialist advice is to be obtained where there are activities associated with ASS ie.
          treatment of excavated materials, de-watering of excavations and monitoring of
          groundwater.

4.1.4 Cultural Heritage

          The Director or Site Manager is required to ensure that, unless specified otherwise, the
          areas to be cleared has been inspected for the possible presence of archaeological material
          before commencement of activities. Where archaeological material is discovered, the
          selected subcontracted service personnel must not commence or must cease to prevent
          damage and the relevant personnel at that location and Authorities are to be notified for
          advice to how to proceed. Specialist advice must be obtained where there is the likelihood
          of culturally significant artefacts being found.

4.2       Construction Material Management

          The Director or Site Manager is required to ensure that:

           • Waste metal, timber, plastic and fabric materials are responsibly deposited in selected
             bins and collected by licenced contractors
           • Noise and dust control is in accordance with the requirements 4.5 and 4.8




Issue 2              July 1                                                            Page 9

Page 13

                                                       Westcon Site Management Pty Ltd



4.3       Storm water & Wastewater Management

4.3.1 Storm Water

          The primary sources of storm water contamination are from sediment run-off and chemical
          spills. Storm water controls to be implemented by the subcontracted excavator include:

           • Limiting clearing to that necessary for construction activities to be undertaken;
           • Ensuring that water from disturbed areas is filtered or directed towards a sediment trap;
           • Diverting clean water away from disturbed areas;
           • Carrying out re-vegetation of disturbed areas;
           • Maintaining the natural drainage regime to the maximum practicable extent;
           • Installing sediment traps down slope of disturbed catchments;
           • Restricting mobile equipment and vehicles to defined road ways;
           • Installing silt fences, check dams, decantation basins, silt curtain and other erosion
             protection devices where appropriate;
           • Regular cleaning/de-silting of sediment traps and silt fences to maintain design capacity,
             when required;
           • Reviewing storm water management requirements prior to any new site works; and


4.3.2      Management measures for other pollution control structures will include;

           • Bunding and/or securing of fuel, oil, grease, and other chemical storage facilities to
             prevent accidental spillage polluting runoff;
           • Designing and constructing compounds or bunded areas with holding capacities to
             conform to the appropriate regulatory requirement applicable to each material type;
           • Providing facilities for machinery and truck wheel wash down, and installing interceptor
             traps to remove oils and greases from wash down facility runoff;
           • Directing water free of visible oil to a sediment trap for recycling; and
           • Regular inspection of off-site roadways to ensure that silt and soil is not being tracked
             beyond the boundaries, and if it is, then appropriate measures are implemented to clean
             up any spilt or tracked soil promptly.
           • Wastewater


4.3.3 Waste Water

          For construction activities, wastewater is generated through washout of concrete and pump
          trucks. A designated area (bunded excavation) must be set aside for washing out of pump
          truck wastes. Concrete trucks are required to remove their concrete waste and residues
          back to the depot.

          Sewerage must be treated either through connection directly to a council sewage system or
          through dedicated septic tanks on-site or chemical toilets, which is to be pumped out on a
          regular basis, as required.



Issue 2              July 1                                                            Page 10

Page 14

                                                       Westcon Site Management Pty Ltd



4.4       Chemical management

          Dangerous goods must be stored as far as practicable from residences, drains and
          watercourses in correctly labelled containers or packages. A file listing the hazardous
          materials used or stored on site is to be established and maintained. This file must also
          contain a copy of each material safety data sheets (MSDS).

          Fire extinguishers and absorption materials for mopping up spills are to be provided and
          made readily accessible to provide a first response. Staff handling hazardous material must
          be provided with instruction in the safe use, handling and storage of that material, and
          training in appropriate emergency procedures, including clean-up of spills.

          Any waste and surplus dangerous goods and any containers that cannot be recycled must
          be arranged for disposal at a local council transfer station.

          Liquids stored in drums and tanks are to be stored in an area under cover, whenever
          possible, and provided with secondary containment (ie. bunding) of a capacity of not less
          than 110 % of the largest drum in storage. All drums and tanks (including those containing
          wastes) must be clearly labelled as to their contents. Care must be taken to ensure that
          incompatible materials are not stored together.

          Any liquid spilt from drums during handling is to be cleaned immediately. Any drum
          found leaking or in poor condition is to be emptied and the contents transferred to an
          appropriate labelled container. Metal trays are to be used under taps fitted to containers
          containing oils, thinners, cleaning solvents etc.) to catch any drips. Maintenance of
          vehicles must not be undertaken on-site. Refuelling of mobile plant must occur in a
          designated area, and the contractor is required to maintain spill kits while refuelling occurs.

4.5       Air Quality Management

          The identification of potential sources of dust emission from the site has facilitated the
          nomination and design of measures for the control of dust. An adequate water supply forms
          one of the principal cornerstone for dust control at the site. Specific control measures to be
          implemented for particular operational phases or activities include, but not necessarily
          limited to:

4.6       Excavation Activities

           • Limiting the removal of soil at any one time to that necessary to provide adequate
             access to the construction area;
           • Limiting soil removal and vegetation clearance to periods of favourable weather
             conditions or maintaining materials in a damp state to avoid dust generation;
           • Carrying out progressive revegetation of areas no longer in use;




Issue 2               July 1                                                            Page 11

Page 15

                                                        Westcon Site Management Pty Ltd



           • Dampening     of working areas, roadways and other hardstand areas when visual
             surveillance indicates excessive dust generation from stockpiles or mobile sources;
           • Enforcing a 30 kph speed limit on roadways;
           • Restricting mobile machinery movements to designated routes and standing areas;
           • Levelling of loads prior to truck exit from the site to avoid spillage;
           • Providing and maintaining truck wheel shaker facilities to prevent carriage of mud onto
             sealed public roads;
           • Covering all loads of fine materials;
           • Regular sweeping/washing of sealed access roads to remove mud and product spillages.


4.7       Waste Management

          Wastes generated by construction activities on the site must be managed in the following
          manner:

           • Sorting and storing paper and general wastes from office and construction activities in
             appropriate containers prior to disposal off site at designated landfill, transfer station or
             recycling depot;
           • Temporarily storing scrap metals in a designated holding area prior to collection by
             scrap metal merchant for recycling;
           • Temporarily storing concrete waste in a designated bin or area prior to collection by a
             contractor for recycling;
           • Removing silt from sediment traps and silt fences to a designated storage area for drying
             prior to being incorporated into revegetation works; and
           • Using waste water from sediment traps for dust control.


4.8       Noise Management

          The following management practices will be adopted at the construction site:

           • Designing the layout of the construction area to maximise the use of natural barriers,
            earthen bunds and vegetation;
           • Restricting hours of construction so that all activities including maintenance, refuelling
             and servicing of equipment will only be undertaken between the hours 7.00 am to 6.00
             pm Monday to Friday and 7.00 am to 2.00 pm on Saturday subject to compliance with
             noise provisions of the Environmental Protection Act or local council ordinances;
             Induction of new employees on the requirements of the Noise Management
             requirements of the CMP.
           • Subcontracted services are to be monitored to:
                o Operate and maintain modern, well maintained road worthy vehicles fitted with
                  high efficiency mufflers;
                o Avoid unnecessary revving of mobile or stationary motors;
                o Restrict vehicle speeds to less than 30 kilometres per hour on the site;
                o Maintain roadways in good condition;




Issue 2              July 1                                                             Page 12

Page 16

                                                        Westcon Site Management Pty Ltd



               o Limit the use of horns, bells, hooters or other audible signals on mobile equipment
                 to the maximum practicable extent, and where possible, fitting of warning lights,
                 rather than audible sirens or beepers;
               o Implement regular inspection and maintenance schedules for all plant and
                 equipment;
               o Avoid the use of air brakes on trucks in built up areas; and


4.9       Energy and raw materials management

          Energy sources at the site are limited to grid-supplied electricity or fuel to operate
          generators. Energy saving initiatives to be implemented will include turning off lights and
          equipment when not in use. Lighting must not be operated at night. Where possible, energy
          efficient plant is to be operated and building supplies are to be purchased. However it is
          recognised that the selection of most building materials is provided by others.

          Materials are to be purchased for construction only as required so that excess supplies are
          not wasted.

4.10 Summary of General Activities

           • Inducting and training new employees on the requirements of this section of the CMP;
           • Managing waste activities;
           • Managing site, plant and vehicle noise;
           • Energy and raw material management


5.0        Fire Ant Management

5.1        If in a Fire Ant Restricted Area

           • Visual check of site for any fire ant nests by a DPI fire ant officer.
           • A Fire Ant Management Plan must be written for the site.
           • All high risk activities must be undertaken in accordance with local regulations and in
            consultation with DPI and local authorities.

5.2       If in a Non-restricted Area

           • Visual check of site for any possible fire ant nests by selected subcontracted service
             provider.
           • Ensure no soil is taken from site or high risk activities are undertaken until area has
             been inspected and no suspect ants detected.
           • If suspect ants are detected identification is to be verified by a DPI fire ant officer prior
             to undertaking and high risk activity.
           • If fire ants are confirmed item 5.1 must apply.




Issue 2               July 1                                                            Page 13

Page 17

                                                     Westcon Site Management Pty Ltd



6.0        Workshop Activities

          The Director and Cabinetmaker are responsible for ensuring that environmental aspects of
          the workshop are maintained including:

           • Safe collection and disposal of oils and contaminated waste water
           • Safe collection and disposal of metal and timber swarf
           • Control of any workshop air quality
           • Reduction of noise levels


           The Director and Cabinetmaker are required to ensure that any other company personnel
           entering the workshop comply with the abovementioned conditions.




Issue 2              July 1                                                       Page 14

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.