Original source · versioned page text
Attachment 3 - Construction Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Westcon Site Management Pty Ltd
AMENDMENTS & DISTRIBUTION
AMENDMENTS
(a) All controlled copies of this Plan are numbered and are subject to amendment as required
and the relevant pages within the Plan are replaced. The revision system is administered by
the Accounts Officer.
(b) Amendments are identified by the next consecutive issue indicator and the date of issue.
(c) The Director is required to give consideration to a re-issue of the whole Plan if he considers
that the number of changes to the manual have a significant impact on the readability and
cross referencing of the document. All new issues supersede all previous issues.
(d) The Amendment Sheet indicates all amendments. Recipients of new issues are responsible
for the approved disposition of superseded pages and the updating of their copy of the Plan.
(e) Amendments are to be approved by the Director and the Amendment Sheet signed.
DISTRIBUTION
The Construction Management Plan and supporting checklist are retained electronically and
Project Managers have access to this but cannot make amendments. Amendment control is as
specified in 1.2.1 above.
Where contractually specified, a Client is issued with an uncontrolled copy, unless specified
otherwise.
Issue 2 July 1 Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.