Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 17 August 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2007/2446
Street address: 102 Pacific Avenue, Sunshine Beach
Real property description: Lot 163 RP 897370
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Material Change of Use - Visitor Accommodation Type 4 -
Conventional (Visitor Hostel)
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
General
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and
may be amended by these conditions.
Page 1 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
2007/2446
Plan No. Rev. Plan / Document Name Date
07-011 - P4.10 B Rendered Views – Garry Wilbraham 17/09/2008
Designs
07-011 - P4.11 B Rendered Views – Garry Wilbraham 17/09/2008
Designs
07-011 – P1 - S5 C Upper Floor Plan – Garry Wilbraham 01/12/2008
Designs
07-011 – P1 - S6 C Lower Floor Plan – Garry Wilbraham 01/12/2008
Designs
07-011 – P3 – S1 B Elevations – Elevation 1 – Garry 11/09/2008
Wilbraham Designs
07-011 – P3 – S2 C Elevations – Elevation 2 – Garry 11/06/2009
Wilbraham Designs
07-011 – P1 – S2 C Site Parking – Garry Wilbraham 16/04/2009
Designs
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The premises are to be identified by the provision of a street number in a prominent location
to ensure it is identifiable to all persons, particularly emergency services personnel.
4. Alcohol shall not be sold on the premises.
5. Amplified music must not be audible at the boundaries of the site between 10pm and 7am.
6. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Building Design
7. External lighting associated with the use shall be designed, installed, operated and
maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of
Outdoor Lighting.
8. Additional timber screening shall be incorporated across the northwestern section of the
Block A patio to a minimum height of 1.8m high in order to reduce overlooking to the
neighbouring property to the north.
Energy Efficiency
9. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
10. All new kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation
Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and
Labeling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1), with
toilets to comply with the AAA Water Conservation Rating System. All new tap ware and
shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and
washing machines are excluded from this requirement.
Page 2 of 16
Page 3
2007/2446
End of Trip Facilities
11. Secure bicycle racks shall be provided on site to accommodate a minimum of 12 bicycles.
The proposed bicycle racks shall be identified on the landscaping plans and shall be located
to the reasonable satisfaction of Council.
Advertising Signage
12. Any advertising sign or device is to comply with Council's policies on advertising.
13. All signage and entrance statements are to be located entirely within privately owned land.
Fencing
14. All fencing shall be setback at least 1 metre from the front property boundary, with at least
half of the fencing setback 2 metres. The area of land between the fence and the front
property boundary shall be densely landscaped to screen any fencing from the street.
15. Any fencing shall be of timber construction or, where metal, concrete or masonry materials
are used, shall include timber koala poles of at least 200mm diameter at minimum centres of
10m to allow for the movement of koalas across the site.
Landscaping
16. The open space and setback areas are to be landscaped in accordance with Council’s
Policy on Landscaping Guidelines and a properly prepared landscape plan. Such
landscaping is to be completed prior to the premises being occupied and maintained at all
times thereafter. The Landscape Plan shall include at a minimum:
16.1. Dense screening vegetation is to be provided within the front setback which will be
suitable for planting under power lines in coastal areas.
16.2. Native screening vegetation a minimum of 1m in width, shall be provided between
buildings as well as along the side and rear boundaries.
16.3. Existing koala habitat trees (Angophora, Corymbia, Eucalyptus, Lophostemon and
Melaleuca species) located along the southern property boundary are to be retained.
16.4. Cleared vegetation is to be suitably processed by one of the following methods and
removed from the site:
16.4.1. Processing through a woodchipper or shredder. The resulting mulch is to
be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5
metres high with a minimum of 10 metres between edges of heaps.
16.4.2. Disposal for firewood.
16.4.3. Disposal for landscaping purposes.
16.4.4. Transport to alternative site for breaking down materials provided that all
necessary permits have been obtained to allow the alternate site to be
used for this purpose.
16.4.5. The disposal method for clearing works is to be submitted in conjunction
with an application for a Development Permit for Operational Work. The
Applicant is advised that other methods may be considered provided full
details of the method are submitted.
The Applicant is advised that burning off is an unacceptable method of disposal.
Security Bond
17. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
Page 3 of 16
Page 4
2007/2446
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
18. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Relevant Period
19. The Development Permit for a material change of use of premises lapses if the use has not
happened by 17 August 2013, unless an application to extend the relevant period is
approved by Council.
Frontage Works
20. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants
& Guidelines. Grass shall be couch, free of weeds.
21. The applicant shall be responsible for providing an edge-of-road yellow line marking
between the proposed Entry and Exit driveways from the site to indicate “No Parking” area.
The line marking shall be provided in accordance with Manual of Uniform Traffic Control
Devices (MUTCD) Part 3 and shall be indicated on the plans submitted for Development
Permit for Operational Works.
22. All paths, ramps, driveways and parking areas shall be designed and constructed to ensure
pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and
to be in accordance with the Disability Discrimination Act 1992 and Australian Standard
1428.1 Design for Access & Mobility.
23. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel, footpath paving and landscaping such as trees and grasses in accordance with
Council’s Standard specifications prior to commencement of the use permitted by this
permit.
24. The applicant shall replace the existing length of the kerb line between the proposed
driveways (Entry and Exit).
Roof Water & Stormwater Drainage
25. Roof runoff from any new building shall be directed to a rainwater storage system or tank
that is installed to ensure water from the rainwater storage system or tank is used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features,
topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in
washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code (QDC) current at the time of
building approval, and shall be part of the plumbing application for approval. The location
and capacity of the tanks shall be clearly shown on the plans submitted for Building Works
and Operational Works approval and any overflow shall be directed to the road frontage/the
stormwater drainage system/etc located in Pacific Avenue.
26. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged into Council’s
existing drainage structure (drainage pit at the frontage of the site in Pacific Avenue). Plans
of the drainage design shall be prepared by a Registered Professional Civil Engineer and
submitted to Council prior to obtaining a Development Permit for Operational Works.
Page 4 of 16
Page 5
2007/2446
27. The applicant shall ensure that the development will not adversely impact on the drainage
conditions on other properties. As the there will be significant filling and a potential for
obstruction to the natural stormwater runoff from adjoining properties, where applicable
appropriate stormwater drainage pipes shall be installed within the site to collect and
discharge stormwater runoff from adjoining properties to prevent additional ponding/flooding
on other properties or diversion of stormwater runoff onto other properties. A Development
Permit for Operational Works shall be required.
28. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
provided on site prior to being permitted to discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor/gross pollutant trap. To this end, a detailed maintenance plan shall be
prepared for the proposed grease/oil arrestors/gross pollutant trap, which shall be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the on going maintenance scheme
for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved Use. A Development Permit for Building Works shall not be
granted until a Development Permit for Operational Works has been issued in regard to the
drainage scheme.
29. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
30. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
31. The existing sewer main that traverses the site and the sewer main that runs in the adjoining
property at the rear of the site and the ‘zone of influence’ (taken as the area within a 45-
degree angle measured from the invert of the sewer main to the finished surface level) shall
be accurately located and determined by a licensed Surveyor and shown on all plans
submitted for Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected
from risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the
greater. As such the applicant shall amend Operational Works plans including Building
plans to ensure compliance.
Service Easements (Sewer)
32. A registered easement shall be created over the zone of influence of all sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be parallel to and centred over the sewer
main and be equivalent in width to twice the depth to invert level of the sewer at the deepest
point within the allotment (measured from the finished surface) and be no less than 3.0m
wide overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
determine the necessary width of the easement, which shall be shown on any plans
submitted for Operational Works / Building Works approval. To this extent the surveyor shall
certify that the sewer and the zone of influence is wholly contained within the easement to be
created.
Page 5 of 16
Page 6
2007/2446
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent
of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing. Any changes required by Council’s Solicitor must be corrected
immediately.
33. No building or other structure shall be constructed or encroach over an easement.
Town Water Supply
34. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
35. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the
Council.
36. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital
Works Manager prior to lodgement and approval of hydraulic drawings.
Earthworks
37. Any filling works required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
stormwater runoff.
38. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
Erosion and Sediment Control
39. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Vehicle Access and Car Parking
40. A vehicular access driveway and carparking on the site shall be constructed generally in
accordance with plan titled Site-Parking numbered P1 Sheet S2 issue C dated 16/04/09 and
as amended by Council in red. A Development Permit for Operational Works shall be
required.
41. The driveway shall be designed and constructed to Council’s design standards and to
grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways
be constructed to grades that do not comply with AS/NZS 2890.1-2004 and AS 2890.2-1989,
Council will require that the driveway be removed and reconstructed to levels that do
comply.
Page 6 of 16
Page 7
2007/2446
Please note, a step between the driveway and the footpath must be avoided, as it is
preferred to have the footpath continue at a constant grade to minimise the potential for
pedestrians to trip or fall.
42. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the driveway shall
comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4.
The applicant shall demonstrate compliance by illustrating these sight lines on the plans
submitted for both Operational Works approval and Building Works approval.
43. All vehicles shall enter and leave the site in a forward direction.
44. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 2 with allowance for vehicles to enter and leave the site in a forward gear and
with a minimum head clearance (headroom) at any point of 2.3m.
45. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Contributions Towards Council Infrastructure
46. Monetary contributions shall be paid to Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $30,460
PSP16 – Sewerage Headworks Contributions $35,786
PSP17 – Water Supply Headworks Contributions $58,878
PSP20 – Pathway Trunk Network Contributions $6,847
TOTAL Contribution Amount = $131,971.00
Please note that these amounts are all subject to variations in the Consumer Price Index,
All Groups Brisbane from March 2009 until the date of payment.
All contributions must be paid prior to commencement of the use.
General
47. A Construction Management Plan for each separate demolition and construction phase of
the development shall be submitted to and approved by Council at least 5 working days prior
to the commencement of any Demolition or Building works or at least 5 working days prior to
the pre-start meeting for Operational Works. The Construction Management Plan shall
include but not be limited to:
47.1. Traffic control measures to ensure safety and traffic flow is maintained in Pacific
Avenue;
47.2. Limiting the routes for the heavy vehicles to the major road network and prohibit the
use of the local roads;
47.3. Maintaining pedestrian access and safety along the frontage of the site;
47.4. Indicate provision for on-site and off-site parking for the required workforce;
47.5. Indicate the location of loading and unloading areas,
47.6. Indicate the location of any “holding” areas for heavy vehicles;
47.7. Operating hours and
47.8. Strategy to protect Council’s existing infrastructures.
Page 7 of 16
Page 8
2007/2446
48. Any damage caused to any public utility (eg pipelines, drainage pits, pathways, roads etc)
during the course of construction shall be repaired to Council’s standards and at no cost to
Council.
49. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
50. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Refuse
51. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”, including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and neighbouring
properties. A bin wash area is required with a cold-water tap, hose and drain outlet
connected to sewer, via a bucket trap. The drain outlet is to be designed to prevent storm
water entry to the sewerage system and this can be achieved with a nib wall 50mm high and
up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed, or
any other design approved by Council.
52. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
53. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
“Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be
submitted for the day-to-day operation of the development and approved by Council’s Health
Section prior to issue of development permit for operational works.
It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
explaining exactly how to predict waste quantities and design waste areas is available from
Council and the web. The Plan shall include the following information: -
The types of waste that will be generated from the activities approved within the
development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
Description of procedures for getting all waste to the bins; the storage of bins and the
collection of bins by the contractor.
A description of the design details of waste storage and recycling areas including size,
location, elevation and floor plan, methods of bin washing and system to prevent storm
water getting into sewer via the bin wash.
A description of types and volume of waste storage containers to be used.
The waste and recycling storage area shall include the provision of containers for all
waste and recycling materials including putresable matter, non-recycling waste, paper/
cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin
washing facilities connected to sewer.
A detailed description of vehicular access to collect waste. Where collection is off
street, access must allow vehicles to enter and leave the site in a forward direction.
54. A Waste Management Plan (construction and demolition) shall be submitted prior to
demolition, removal or relocation of any building other than a shed
Page 8 of 16
Page 9
2007/2446
Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and
waste materials. These shall be located so that they are convenient and safe to use. (Refer
to Noosa Council Waste Management Code)
The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify proposed *specify contractor and
(m³) re-use or on-site contractor and landfill site or
recycling recycling outlet other disposal
methods site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free.
Higher gate fees are charged for loads of mixed waste.
Noise
55. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
pumps etc) shall comply with the following requirements:
The equipment shall be installed and located in a manner that prevents excessive noise in
accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices
(on-the-spot fines) may apply for offences.
A person must not use equipment on any day if it makes or causes noise to be made - From
10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
No audible noise for pool pumps apply during these hours.
From 7am to 7pm: More than the lower of either –
Page 9 of 16
Page 10
2007/2446
50 dB(A)
5 dB(A) above the background noise level
From 7pm to 10pm: More than 3 dB(A) above the background noise level.
56. Submission of written certification from a suitably qualified person confirming that the noise
levels from all mechanical equipment comply with the cause above when measured at either
the residential boundary or outside the most exposed part of an affected building, whichever
is the closest to the equipment.
The assessment and certification is required immediately after installation of the equipment
and prior to any occupation of the building, and in a format approved by Council. This
assessment must take into account noise from any other fixed equipment on the property
e.g. swimming pool pump, heating/cooling equipment, etc that may increase the overall
noise level emitted.
Advice: It is highly recommended that the person you engage to certify the installation Is
involved at the plan development stage so they can recommend where this equipment is
best located. They can also advise about noise enclosures and can make other suggestions
to avoid noise problems. It is a lot more costly to try and deal with noise problems after
everything is built.
57. All noise controlled measures set out in the Environmental Noise Level Study for Proposed
Residential Budget Accommodation – Development, 102 Pacific Avenue, Sunshine Beach
(Report No: R09043/02260/Rev.0/23.04.09) shall be incorporated into the development.
Written certification shall be submitted from an Acoustic Consultant after completion of works
confirming that these noise control measures have been incorporated into the development.
58. All external facing windows to the south east and north east elevations of the buildings shall
be double glazed (or equivalent sound suppressant construction approved by Council), so as
to minimise the impacts of sound emanating from the development.
59. Noise from building works associated with residential development shall comply with the
following –
59.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
59.2. All reasonable measures are taken to minimise noise emissions.
59.3. Not permitted on Sunday or public holidays.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan No. Rev. Plan / Document Name Date
07-011 - P4.10 B Rendered Views – Garry Wilbraham 17/09/2008
Designs
Page 10 of 16
Page 11
2007/2446
07-011 - P4.11 B Rendered Views – Garry Wilbraham 17/09/2008
Designs
07-011 – P1 - S5 C Upper Floor Plan – Garry Wilbraham 01/12/2008
Designs
07-011 – P1 - S6 C Lower Floor Plan – Garry Wilbraham 01/12/2008
Designs
07-011 – P3 – S1 B Elevations – Elevation 1 – Garry 11/09/2008
Wilbraham Designs
07-011 – P3 – S2 C Elevations – Elevation 2 – Garry 11/06/2009
Wilbraham Designs
07-011 – P1 – S2 C Site Parking – Garry Wilbraham 16/04/2009
Designs
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges
applicable to this development approval have been based on the following Uses Class/ Uses
and applicable quantities:-
Existing Development Approved Development
Existing Use Class Approved Use Class /
Existing Quantity Approved Quantity
/ Use Use
Visitor 48 beds + 1 x 1
Detached House 1 Dwelling Accommodation - Bedroom Manager
Type 4 - Hostel Unit
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $18,536 and is subject to variations in the
Consumer Price Index, All Groups Brisbane from March 2009 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
4. The applicant is advised that a Compliance Permit for all plumbing and drainage works
within the boundaries of the development site shall be obtained from Council’s Plumbing
Services Section prior to obtaining a Development Permit for Building Works.
5. The applicant is advised that this development may require the provision of fire hydrants and
a booster pump in accordance with the Building Code of Australia, and consultation may
also be needed with Queensland Fire Services to ensure suitable fire fighting infrastructure
is provided. To this end any necessary fire hydrants shall be clearly shown on the plans
submitted for both Operational Works and Building Works approval and if a booster pump is
deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
order to provide boosting to the water supply.
6. Where any food premises is included in a development, the following is required:
6.1. A separate Material Change of Use Application.
Page 11 of 16
Page 12
2007/2446
6.2. Plans and application is to be made to Council’s Environmental Health Section for
approval prior to any building approval, fitting out or use of the premises.
6.3. A statement indicating the purpose of the food premises, type of food sold, proposed
menu and maximum number of patrons at any time, is to accompany the application
for plan approval.
6.4. Construction and use of the food premises should comply with Council’s Food
Premises Policy and the Food Safety Standards. (Both available from Council)
6.5. Toilets for customers and staff to be provided in accordance with Building Code of
Australia. Obtain advice from a building certifier on numbers and standards,
including disable access.
6.6. Plans and approval is required for any mechanical exhaust ventilation system, which
should comply with AS1668. A certificate from the installer certifying the system
complies with the Standard must be obtained and lodged with Council prior to
commencement of trade.
6.7. Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006, must
obtain a Food License from Council, prior to use of those premises.
7. The development should be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
odours) nuisance or any other emissions in accordance with the nuisance provisions of the
Environmental Protection Regulation 1998 or Council’s Local Law No. 12 – Control of
Nuisances.
8. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
paint, cement, concrete, builder’s waste or rubbish should not be permitted to enter or be
placed where it could reasonably be expected to move into a roadside gutter, storm water
drain or a watercourse. On the spot fines apply for such offences.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
Page 12 of 16
Page 13
2007/2446
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
Development Permit for Operational Landscaping, car parking & access, frontage works,
Works stormwater drainage, and erosion & sediment control
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Advertising Devices Code
12 SUBMISSIONS
There were (2) properly made submissions about the application. In accordance with Integrated
Planning Act 1997, the name and address of the principal submitter for each properly made
submission is provided and attached.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Kerri Coyle
COORDINATOR PLANNING APPLICATIONS (NORTH)
Page 13 of 16
Page 14
2007/2446
List of Submitters
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Simon & Amanda Carthy
100 Pacific Avenue
SUNSHINE BEACH QLD 4567
Mr A Wardley
98 Pacific Avenue
SUNSHINE BEACH QLD 4567
Page 14 of 16
Page 15
2007/2446
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
4.1.27.(1) An applicant for a development application Appeals by advice agency submitters
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development
development approval for a development application
application;
if-
(b) a matter stated in a development approval,
(a) the development application involves impact
including any condition applying to the
assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a
application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period;
days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant.
4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the relevant period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
(3) If a person withdraws a submission before the scheme.
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
(4) If an application involves both impact against a deemed refusal of the request.
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the
(no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
a. (a) a notice giving a decision on a request to change
1
or cancel a condition of a development approval.
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 15 of 16
Page 16
2007/2446
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development relevant period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
a.
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 16 of 16
Used in these records
SUPERSEDED - Decision Notice - 010.2007.00002446.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 90 KB (small file)
- File type
No other editions are linked here.