OPW14/0197 Approved Plans Part 2 (16-39)
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPlotted by: Crawford, Suzanne 6/25/2014 4:11 PM
F1
F1
T +61
TE
TE
ADJOINS DWG L-403 F1 ADJOINS DWG L-404
TE www.aecom.com
TE
CLIENT
TE
TE TE
-
-
F1 NOOSA COUNCIL
APPROVED PLANS
OPW14/0197 3 OCT 2014
F1
F1
KEY PLAN - NOT TO SCALE
F1
F1
F1
TO EXTENT OF DISTURBANCE AROUND
PAD MOUNTED TRANSFORMER
F1
F1
F1
F1
F1
ENVIRONMENTAL
EXTENT OF WORKS
CORRIDOR
ADJOINS DWG L-405
NORTH POINT / SCALE
F1 N
F1
0 2 4 6 8 10 12 14 16 18 20m
1:200 (Original Sheet Size: A1)
F1
Verify all dimensions on site prior to construction. Do not scale from drawing.
F1
All dimensions in millimetres unless otherwise stated.
F1
F1
TE
TE OP3 RFI RESPONSE 25.06.14 JL
TE OP2 OPERATIONAL WORKS 23.04.14 WW
F1
OP1 OPERATIONAL WORKS 17.03.14 JL
F1
ISSUE DESCRIPTION DATE CHECK
SC SC WW 25.06.14
DESIGN DRAWN CHECK DATE
CAD Ref: P:\Projects\60314304\5. CADD\5.3 Working\5.3.1Sheets\Stage C\L-4304-STAGE C-406
PROJECT NUMBER
F1
ENVIRONMENTAL 6031 4304.01
CORRIDOR PROJECT
DOONELLA
STAGE C
DRAWING TITLE
F1
PLANTING PLANS
TE
F1
F1
STATUS DRAWING ISSUE
ADJOINS DWG L-408 OP3 L-4304-STAGE C-406 OP3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.