Council archive · source document
00153163.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
‘ t
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Integration of land use and public 22. The application involves: {tick the applicable box/es}—
Fansport ; . nedule 8A J (i) a material change of use assessable against the planning scheme for a purpose
Oto PA beens ale Besiaton. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered ‘none of the above’, the schedule.
application triggers referral to OT as a concurrence [4 (ii) reconfiguring a fot—
agency: C1 (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
(J {b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
[-] (c) on tand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
[1 (d) for a residential purpose within the 25 ANEF contour for an airport;
(1 (e) for a residential purpose resulting in 100 or more allotments.
(_] (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
. above, on land that—
(J (a) is completely or partly within a public transport corridor or a future public
transport corridor;
(] (b) _ will result in work that encroaches into an airport's operational airspace.
(iv) none of the above.
© Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
ofthe Ad sahodile 2 of Gaife 23, schedule BA [1 (i) a material change of use assessable against the planning scheme for a purpose
Unless you answered “none of the above, the mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
application triggers referral to OT as a concurrence schedule.
agency. _] (ii) reconfiguring a fot—-
(1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
CJ (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
[1] (c) — onland that abuts rail corridor land, commercial corridor land or future railway =
land, and the total number of lots increases;
[-] (d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
[1 (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
[J (f} for a residential purpose resulting in 100 or more allotments.
(1 (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in {i) above or reconfiguring a lot mentioned in (ii)
@ above, involving extracting, excavating or filling greater than 50m3, on land that—
[J] (a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
[] (b) is completely or partly within future railway land, or a railway tunnel easement;
(J (c) abuts rail corridor land, commercial corridor tand or future railway land, and
the work is within 25m of the railway boundary.
[X] (iv) none of the above.
Referral coordination ' |24,. Does the application trigger referral coordination?
An information request requires referra) coordination PSA NO
if the apptication involves ~
{i) 3 or more concurrence agencies; oF [1 YES, as the application: (tick the applicable box/es)
{i} a facility or area assessable under @ / .
planning scheme and prescribed in C1 (i) triggers 3 or more concurrence agencies;
ti) dovdopmrent with heteae * CJ (ii) involves a material change of use made assessable under a planning
application for prefiminary approval scheme and prescribed in schedule 7 of the IP Regulation;
mentioned in s3.1.6 of the IPA.
For more information go to Guide2 and Guide 6, LJ (iii) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;
J (iv) is for a preliminary approval mentioned in s3.1.6 of the IPA
Page 7See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00153163.001.pdfRelated documentPublic source context ↗
06/1101 - Op Works Landscaping, Stormwater, Silt & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.