Council archive · source document
00153163.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 Part A, Version 2.2, 25 Juty 2005
Land owner's consent (f applicable} 20. Land owner's consent to the making of this application: ;
ecamieamecomoes | [tame | tate «de |
Section 3.2.1(10){a) of the PA prescribes that an
without the land owner's consent RU, i. _
An aprficafon must be supported by the consent of 0 ROO eee eeeeecees ENS aoe > - §xheley”
tand owner if tha application involves: . Sa \
a 2 moterid chan of use: (ii) Stephen Clague ~~ 7 19), 2 lox
(@ reconfiguration of a lot Ty aT aren ereteectoweraeasncecescrsiilans een. ba ALT C2.
(i) work on land below high-water mark & not wahin (iii) [
a canal as defined undes the Coastal Pmtection Taree rron ens ees erence em nnn een nna hewn nee enema n en ew ene b einen eben een ee renee
and Management Act 19%or (iv)
(¥} work en rail corridor land defined under the sronn tran tt ene e rennet een nce b eee ce eee nn ee ee ener teen nce cerechoeece cece
Transport infrastructure Act 1994, (v)
: For a mobile of temporary ERA - tandownet’s
consent Is nof required.
For more information refer to Guide 4.
Seobon 321m “ prvi 21. Does this application invotve taking or interfering with (other than interfering with quany material on State
Secéion of the IPA prescribes that an ,
jon cannot he taken tobe property made coastal land under the Coastal Protection and Management Act 1995) a State resource?
without evidence of te resource enfidement. BX] NO - goto a24 DYES - got a22
Refer to schedule 10 of the integrated Planning 22. This application is required by regulation to be accompanied by evidence: (tick ble box,
Regulation 1998 that prescribes the nature of evidence . Ppa mv yreg pe y fick appa )
required by the State in support of the dging of this LJ (i) ofthe allocation of, or entitlement to, the resource ~ atfach evidence
development appication (J (ii) the chief executive of the department administering the resource is satisfied the development is
consistent with an allocation of, or entitlement to, the resource — go to Q23
(1 (iii) the chief executive of the department administering the resource {s satisfied the development
@ application may proceed in the absence of an allocation of, or entitement to, the resource —
go to Q23
Ath or semuleting 23 ndetory t evidence | 22° EMidence of the resource entitlement:
required under O22 a ase "y evilence i (i) Resource entitlement / authority details (iv) Official stamp of the department
Resources and Mines ts mandatory where the applicable
application involves taking or interfering with water ar (ii) Name of delegated officer
{iii) Position of a officer
{iv) - of ~ officer
(v) Date
Assessment triggers 24. Is the IDAS Assessment Checkist completed and attached to this application?
me echt does pot Pet leamadanal arta YES (1 NO - the assessment manager may refuse to accept ths application an the
must be completed for all other applications. grounds that the application has not been properly made
@ Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
manager, referral agencies and any person viewing .
the application during public scnsiny ar pubic i) RO0S13-1-A Proposal Report (including December
fobfication to understand the scope of the proposal (i) mr plans) 2005
and any potential impact. Te tener na tanner nnn ee een ee nme n ean ew ence nena n eee en nneeene ee eah ec ee nm neee eee
(ii)
(iii)
(iv)
(v)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of todgement, taifs to provide all applicable information required by Part A
and any other relevant part of Form 4.
OFFICE USE ONLY (epplicable to assessment manager's)
| FEE(S) DATE , T RECEIVING OFFICER'S | REFERENCE —
: ee, |CECEMEDN ef NAMES | NUMBERIS oe ee
Motification of Engagement of F ivace Cartifier (Cotionat format) ;
To. Council. | have been engaged as the private cerlifier for the building work referred to in this application.
Date ofengagement / / — Accredilation Number. ___ Name: Signature: _See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00153163.001.pdfRelated documentPublic source context ↗
06/1101 - Op Works Landscaping, Stormwater, Silt & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.