Original source · versioned page text
2018-10-09 P&E Agenda - Attachment 1 to Item 3 - MCU18-0019 Proposal Plans
The original of this document is very large (10.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Planning & Environment Committee
i n f o @ e l e v a t i o n a r c h i t e c t u r e . c o m . a u
9 October 2018
Item 3 - Attachment 1
Ex=Existing Level
Proposed Level
10.02
10.02
10.01
B3
B2
B1
09.01
EAST
Basement Area 3,184.9 m2
GOODCHAP STREET
116,680
116
142
'"
°0 680
142° 00' 00"
"
0' 0
00
690
° 0 69
"0'97
°5
97 5,
SETBACK
6,000
3,110
●
VAL CRESCENT
6,000 FIRE TANK 1 FIRE TANK 2 PUMP ROOM 3,000
w w w . e l e v a t i o n a r c h i t e c t u r e .c o m . a u
10.01 SETBACK SETBACK 10.01
300
5,400
A1 300 Typ A1
9,200 38.4 m2 35 m2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 1,200
2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600 2,600
Ex 4980 AC PLANT
232° 00' 00"
30,175
CARPARK AREA
6200
Ex 4470 7000RL
Ex4380
1,574.8 m2
30
232
'" 175
°0
Ex4480
1,500
2,500 190
200
300 300 300 300 300 300 300 300 1,500
1,300
2,600 2,600 7,800 7,800 5,200 2,400 2,400 8,500 5,200 7,800 7,800 5,200
EXISTING RESIDENT +3,000
190
2,000
CROSSOVER
Ex 5000 Proposed +3,000
Proposed 4400+/- Proposed 4100+/- Proposed 3400+/- Proposed 3100+/- FIRE STAIR
Ex 4300+/- Ex 4250+/-BOK
5,400
Ex 4400+/-TOK 6m @ 1:20 10m @ 1:13 6m @ 1:20 1
2 15
6,680
3 14
-300mm -700mm -300mm 4
5
13
12
35
52
'" 250
°0
200 6 11
LIFT
A2 A4 6060 6000 10,000 6000 A4 7 10
9 LIFT A2
10.01 10.03 10.03 33 34 35 36 37 38 39 40 41 42 Staff Entry 43 44 45 46 47 48 49 50 51 52 10.01
NORTH
09.01
Ex 4200 Ex 4060 BOK BATTERY
MED BULK PAD
8
Ex 4130 TOK Proposed 4200+/-
Proposed 4000+/- HOT WATER 5,150.8
STORE
200
COMMS MSB STORE STORE STORE SYSTEM
A5 2,500 A5
13.5
10.03 [email protected]
CLEANER 6500RL
2,000
1:1
6 DELIVERY
Ex 4050 Ex 3890
Ex 4020 Ex 4530
Ex4810
+3,000
SOUTH
09.01
Proposed 3170+/-
EXISTING TREE ON Ex4910
COUNCIL LAND LAUNDRY KITCHEN
Proposed +3,000
52° 00' 00"
35,250
Max 1:40 Grade to OFFICE
TREE PROTECTION ZONE manouvering area OFFICE
STORMWATER LANDSCAPE AND TOILET
(12.5m DIA) FOR EXISTING GUM BIN STORE
DETENTION TANK REUSE TANK MAINTENANCE FURNITURE STORE
TREE 6000RL
CHUTE
OFFICE
PROPOSED NEW STORMWATER
INFRASTRUCTURE AS PER
OFFICE
A3 ENGINEER'S DRAWINGS A3
10.01
EXISTING RESIDENT 10.01
CROSSOVER ARCHIVE PROPOSED SEWER LINE AS PER
ENGINEER'S DRAWINGS
●
STORE STAFF LOCKERS STAFF ROOM
14
7, 5' 0
233° 25' 15"
°4
96 0
f 0 7 3 8 5 2 2 0 8 2
26,618
0 "
'0"7
°45
14
960
" 618
233
'15
°25
26
CUT/FILL FOR GROUND FLOOR TERRACE ABOVE 5500RL
PROPOSED SEWER EASEMENT AS
19,973.8
2,000
PER ENGINEER'S DRAWINGS
44
337° ,496
ACK
SETB 0
6,00
30' 0
0"
3,555
"337
0'44 496
°30
5000RL
9,705.8
SETBACK
6,000
00
13,1 307"
S 0 7 3 2 5 1 6 9 0 0
19,817 4500RL
329° 45' 307'
307°
307100
'"13
°0
"45
°0
'329
00"
19 817
40,054
40
322
'" 054
°0
322° 00' 00"
10.02
10.02
B3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.