Council archive · source document
Appendix A - SARA request response by Eco-Team · MCU22/0118
4. Issue:
The application does not include a Koala Management Plan, or sufficient information to demonstrate that PO3 has been met.
Action:
Provide a Koala Management Plan which includes the following (as a minimum):
• all potential risks to koalas from clearing and construction activities proposed on site, including vegetation clearing, earthworks,
plumbing and drainage works and building works
• all potential risks to koalas from the proposed future use of the site
• all management measures that will be implemented to address the risks
• the process and measures to address accidental injury or death of koalas
• stop work procedures in the event a koala is identified as sick, injured, killed or orphaned on the site
• procedures for pre-start machinery checks
• the process for implementing the management plan including:
o identifying the person responsible for implementing the plan (e.g., site supervisor, foreman)
o the process for training all contractors working on the site to comply with the plan.
Response: See attached Koala Management Plan (Attachment 2)
PO5 of State code 25 – Avoidance, minimisation and mitigation of impacts on MSES
Response to State Development Assessment Provisions v3.0: State Code 25: Development in South-East Queensland koala habitat areas
Page 7 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix A - SARA request response by Eco-Team.pdfRelated documentApplication case desk ↗
About this file
- File size
- 486 KB (small file)
- File type
No other editions are linked here.