Glen - REC13/0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

    Brisbane Stormwater Management Pty Ltd




              VALKEV PTY LTD




 STORMWATER DETENTION AND FLOODING
  FOR SUBDIVISION OF LOT2 ON RP173883
  AND LOTS 135, 136 AND 137 ON MCH978
AT ELM STREET AND LAKE MACDONALD DRIVE

                   COOROY




                30 APRIL 2014
Log in to download the original file

Glen - REC13_0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 43 pages

Page 2

      SUBDIVISION OF LOT 2 ON RP173883 AND LOTS 135, 136 AND 137 ON MCH 978

                AT ELM STREET AND LAKE MACDONALD DRIVE, COOROY



                  STORMWATER DETENTION AND FLOODING REPORT

     COMPILED FOR VALKEV P/L BY BRISBANE STORMWATER MANAGEMENT P/L



                                  DOCUMENT CONTROL SHEET



Document Title: Stormwater Detention And Flooding For Subdivision Of Lot 2 On RP173883 And
                Lots 135, 136 And 137 On MCH978, At Elm Street & Lake Macdonald Drive, Cooroy

Client:          Valkev Pty Ltd

BSM Job No:      2013-08

Project Manager: Denis Ogle



Distribution:

Doc Filename  Status Format      Issued To              Date
ValkevSDF.Doc Draft Pdf          Callaghan & Toth P/L   28/4/14
                                 BSM – Office           28/4/14
ValkevSDF.Doc Final     Pdf &    Callaghan & Toth P/L   30/4/14
                        Hardcopy BSM – Office Copy      30/4/14




Brisbane Stormwater Management P/L
92 Alkoomie St, PO Box 8119, Wynnum Nth, Q4178
Ph (07)33963383, Email [email protected]




   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                 Page 1

Page 3

List Of Contents

1.    Summary                                                               3

2.    Introduction                                                          4

3.    Stormwater Detention Requirement                                      5

4.    Stormwater Discharges To No 2 Pearsons Road                           6

5. Runoff Rates To Floodway Model                                            8
5.1 Catchment Areas And Subdivision                                          8
5.2 Design Rainfall Data                                                     8
5.3 Model Calibration                                                       10
5.4 Linkage From Catchment Model To Floodway Model                          11

6.    Floodway Profiles, Pre-Development                                    13

7. Floodway Profiles, Post-Development                                      17
7.1 Mitigation Concept For Increased Stormwater Runoff                      17
7.2 Model Simulation                                                        17
7.3 Sensitivity Test                                                        18

8.    Certification                                                         19


List Of Figures (following text)

1     Locality And Lot Plan
2     Urbs Models Of Stormwater Detention Requirement
3     Proposed Change In Discharge Scenarios To No 2 Pearsons Road
4     Catchment Subdivision For Pre-Development Urbs Model
5     Catchment Subdivision For Post-Development Urbs Model
6     XPStorm Hydraulic Model Network
7     Photographs Of Eastern Floodway On 25 November 2013
8     Photographs Of Western Floodway On 25 November 2013
9     Proposed Floodway Modifications
10    Longitudinal Floodway Profiles
11    Floodway Cross-Section Changes – West Tributary
12    Footbridge And Bio-Basin Schematics
13    Flood Levels And Flood Boundaries


Appendices

A.     Design Rainfall Data
B.     Rational Method Calculations Of Floodway Inflows, Pre-Development
C.     Rational Method Calculations Of Floodway Inflows, Post-Development
D.     Floodway Storage Volumes




     Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc    Page 2

Page 4

1.0      SUMMARY

This analysis has found that the development’s stormwater detention requirement can be achieved by
enlarging the flood storage on the site, by the means shown on Figures 9 to 11 of this report, to augment
the small amount of conventional detention storage that can be gained in two bio-basins on the site (as in
Figure 12). The additional storage volumes generated by these works, after allowing for the small
amounts of flood storage that will be lost to filling of lot margins and active parkland, are compared to
the detention storages that would be required of a fully-conventional detention system, in Table S1:

Table S1:  Comparison Of Pre-Development And Post-Development Floodplain Volumes (m3)
           To Required Detention Volumes
                       1Year     2 Year  5 Year    10 Year   20 Year      50 year   100 Year
  Pre-Development      5456       6184    8515       9927     11352       12986       14493
  Floodway Storage
  Post-Development     5781       6591    9349      11121     12976       14807       16240
  Floodway Storage
   Floodway Gain        325       407      834       1194      1624        1821       1747
   Plus Bio-Basins      162       183      252        252       252         252         252
 Less Active Park Fill   -0         -0      -0         -0        -0         -18         -45
      Nett Gain         487       590     1086       1446      1876        2055       1954
 Req’d Extra Volume
   (From Table 3)       395       525     770        910       1095        1370       1585

The abovementioned works, together with a minor regrading of the invert profile around node 5 (as also
shown on Figure 10) will result in the development having practically nil adverse impact on flood levels
on adjoining properties, as summarised in Tables 16 to 18 of this report. The only exception to this
generality is at node 23, just upstream of the site boundary in the western tributary, where the affluxes
will range from 0.02 metre in a 10 year storm to 0.05 metre in a 100 year storm. The western channel
between node 23 and the site boundary was designed in 2006 to be deliberately revegetated to a
Manning’s n of 0.15, as part of the adjoining Blue Wren Place development. That revegetation was
installed at the time of that development, but has since been removed, thereby reducing the present (“pre-
development”) Manning’s n in this area to about 0.04, consequently decreasing the flood levels at node
23 to about 0.4 metre below the original design levels. The post-development flood levels as a result of
Valkev’s development, while being 0.02 to 0.05 metre above the present levels, will nevertheless be at
least 0.3 metre below the original design levels for this area, and the quoted affluxes are therefore
suggested to be of no consequence. This is illustrated by the levels of the adjoining lot in Blue Wren
Place, which are marked on the longitudinal floodway profiles in Figure 10 of this report.

The works will also result in nil adverse impact on downstream peak flow rates, apart from a slight
increase in flows along the western tributary through the immediately adjoining downstream property
(No2 Pearsons Road). That increase on the adjoining property results in the deliberate diversion of local
runoff away from that adjoining property, and directly to the western floodway upstream of that property.
Downstream of the natural point of inflow to the floodway for that runoff, on the adjoining property, the
flows revert to their pre-development rates.

The consequent flood levels for design of the development are summarised in Tables 16 to 18 and in
Figures 13 of this report. A sensitivity test has identified the impact of uncontrolled floodplain regrowth
on the abovementioned design levels. The consequent 100 year flood levels are summarised in Table 21
and in Figures 13, and appropriate account should be taken of these possible flood levels when
considering appropriate design levels for the development.



      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                           Page 3

Page 5

2.0      INTRODUCTION

This report describes Brisbane Stormwater Management P/L’s (BSM’s) stormwater detention and
flooding assessment of a proposed subdivision of Lot 2 on RP173883 and Lots 135, 136 and 137 on
MCH978, at Elm Street and Lake Macdonald Drive, Cooroy. The site locality and the proposed lot layout
are shown in Figure 1 of this report.

The site is traversed by two tributaries of Six Mile Creek, hereafter described as the eastern and western
tributaries. The catchment areas of the two tributaries are shown in Figure 4, and the tributary floodways
can be seen in more detail in Figure 6.

Some of the increased stormwater runoff from the proposed residential areas is proposed to be mitigated
by conventional detention volumes in two bio-retention basins, but most of the increased runoff is
proposed to be attenuated by an increase in the floodway storage on the site. The increased floodway
storage will be achieved by deliberately “roughening” the floodways (by revegetating the riparian zones,
as required by Council) and by constructing a restrictive footbridge across the eastern tributary to back-up
the flood profiles in that tributary floodway.

Hydraulic model analyses of the interaction between increased site runoff and floodway through-flows
can be skewed by “hydrograph separation”, whereby the urbanisation of a particular site is predicted to
hasten the discharge of the increased site runoff down the floodway before the arrival of the major
floodway flows from the upstream catchment – which can lead to a perception that the peak flow-rates
along the floodway will not be significantly increased, which in turn leads to a perception that little or no
attenuation volume is required. This perception may be valid for a site development that is considered in
isolation, but it becomes invalid when the “equal opportunity” development of all such sites in the
catchment is collectively considered.

To overcome the abovementioned modelling difficulty without resorting to a catchment-wide “equal
opportunity” analysis, this assessment has firstly determined the detention volume that would be required
for a fully-conventional system of dedicated basins on the site’s stormwater outlets. The assessment was
thereafter focussed on achieving at least that volume from the proposed combination of bio-basin
detention and increased floodway volume, while also using a floodway model to verify that the proposed
changes to the floodway profiles on the site would not adversely affect the flood profiles upstream and
downstream of the site.

The development proposal is particularly cognisant of the need to not increase local stormwater
discharges (as distinct from tributary channel through-flows) onto an adjoining property to the north –
namely No 2 Pearsons Road (refer Figure 1). This is proposed to be achieved by diverting part of the
runoff from the relevant sub-catchment, directly across to the western tributary floodway within the site.
This diversion proposal had to be accounted in the floodway modelling process.

The assessment process was therefore structured as follows:

-     Determination of the required detention volume - as described in Section 3 of this report.

-     Devising a diversion mechanism, in liaison with the applicant’s civil consultant (Callaghan & Toth),
      to ensure no increase in stormwater discharges to No 2 Pearson Road – as described in Section 3.

-     Calculation of the runoff rates to the floodways and running them though floodway models of the pre
      and post-development scenarios – as described in Sections 4 to 7.



      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                             Page 4

Page 6

3.0     STORMWATER DETENTION REQUIREMENT

As already noted in Section 1, the increased rates of stormwater runoff from the site are proposed to be
mitigated partly by conventional detention storage in two bio-basins and partly by increased floodway
storage on the site, with a requirement that the combined volume of those two storages should be at least
equal to the detention volume that would be required for a fully-conventional system.

The detention volume that would be required for a fully-conventional system has been determined by
compiling hydrologic models of four distinct parts of the proposed development platform, notated as
models A, B, C and D in Figure 2 of this report.

The attenuation objective for each of the four models was set by Rational Method calculations of the pre-
and post-development peak flow rates, as summarised in Tables 1 and 2 hereafter. The contributing areas
shown for Area A in Tables 1 and 2 are slightly less than the actual area of 2.49 hectare, because of
partial-area criticality (refer Figure 2 for partial-area limits).

Table 1:     Rational Method Calculations Of Pre-Development Peak Flow Rates
 Area     C10     Tc                     I (mm/hr)                 A                          Q (m3/s)
                 (min)   1 / 2 / 5 / 10 / 20 / 50 / 100           (Ha)     1 / 2 / 5 / 10 / 20 / 50 / 100
  A       0.72    24     65 / 73 / 98 / 116 / 130 / 152 / 166     2.43   0.25 / 0.30 / 0.45 / 0.56 / 0.66 / 0.85 / 0.97
  B       0.70    18     75 / 84 / 112 / 132 / 151 / 172 / 192    0.85   0.10 / 0.12 / 0.18 / 0.22 / 0.26 / 0.33 / 0.38
  C       0.70    20     71 / 80 / 106 / 127 / 142 / 165 / 180    1.85   0.20 / 0.24 / 0.36 / 0.46 / 0.54 / 0.68 / 0.78
  D       0.70    16     80 / 90 / 120 / 140 / 158 / 183 / 202    1.34   0.17 / 0.20 / 0.30 / 0.37 / 0.43 / 0.55 / 0.63

Table 2:     Rational Method Calculations Of Post-Development Peak Flow Rates
 Area     C10     Tc                     I (mm/hr)                 A                          Q (m3/s)
                 (min)   1 / 2 / 5 / 10 / 20 / 50 / 100           (Ha)     1 / 2 / 5 / 10 / 20 / 50 / 100
  A       0.78    18     75 / 84 / 112 / 132 / 151 / 172 / 192    2.34   0.30 / 0.36 / 0.54 / 0.67 / 0.80 / 1.00 / 1.17
  B       0.80    13     89 / 100 / 133 / 155 / 175 / 201 / 221   0.85   0.13 / 0.16 / 0.24 / 0.29 / 0.35 / 0.44 / 0.50
  C       0.80    14     86 / 96 / 129 / 150 / 169 / 194 / 214    1.85   0.28 / 0.34 / 0.50 / 0.62 / 0.73 / 0.92 / 1.06
  D       0.80    11     93 / 105 / 141 / 163 / 186 / 215 / 235   1.34   0.22 / 0.27 / 0.40 / 0.49 / 0.58 / 0.74 / 0.84

Version 3.5g of the URBS software was used as the basis for the hydrological models of Areas A to D.
Each of those areas was modelled as a sub-area network, using the subdivision lines indicated on Figure
2. Each of the four models was based on post-development conditions and was calibrated to closely
match its peak outflow rates to the Rational Method calculations of the post-development flow rates (as
in Table 2). A hypothetical detention basin was then added to the outlet of each model, with its storage-
discharge characteristics adjusted so as to reduce the peak outflow rates to the Rational Method
calculations of the pre-development flow rates (as in Table 1). The resultant storage requirements are
summarised in Table 3, below:

Table 3:     Required Detention Volumes (m3) For Fully-Conventional System
  Area       1 Yr     2 Yr     5 yr   10 Yr 20 Yr       50 yr 100 Yr
   A         130      170      245     290      355      445     520
   B          60       80      110     130      150      195     220
   C         130      175      260     300      360      425     495
   D          75      100      155     190      230      305     350
 Total       395      525      770     910     1095     1370     1585




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                                      Page 5

Page 7

4.0     STORMWATER DISCHARGES TO No 2 PEARSONS ROAD

A catchment area of 2.49 hectares presently drains across the northern boundary of the site and onto No 2
Pearsons Road, as shown for the pre-development scenario in Figure 3. Local stormwater discharges onto
the adjoining property will be maintained at or below their existing rates by diverting part of the runoff
from the relevant catchment, directly across to the western tributary floodway within the site, as shown
for the post-development scenario in Figure 3.

The existing discharge rates to the adjoining property, as calculated by the Rational Method for the
partial-area of 2.43 hectares shown in Figure 3, are summarised in Table 4 below:

Table 4:        Rational Method Calculations Of Pre-Development Peak Flow Rates To No 2 Pearson Road
 C10          Tc                    I (mm/hr)                 A                          Q (m3/s)
             (min)    1 / 2 / 5 / 10 / 20 / 50 / 100         (Ha)      1 / 2 / 5 / 10 / 20 / 50 / 100
 0.72         24      65 / 73 / 98 / 116 / 130 / 152 / 166   2.43    0.25 / 0.30 / 0.45 / 0.56 / 0.66 / 0.85 / 0.97



In the post-development scenario, runoff from the 2.40 hectare post-development catchment (excluding a
0.018 hectare drainage corridor connecting to the adjoining property) will be collected at the sag in the
proposed road, from which flows up to Q5 will be diverted eastward by piping along the road, to the
western tributary channel. Flows in excess of Q5 at the sag will discharge overland, through the
abovementioned drainage corridor, to the adjoining property.

The Q5 diversion capacity, as calculated by the Rational Method for a partial area of 2.25 hectares, is
summarised in Table 5, below:

Table 5:        Rational Method Calculation Of Q5 Diversion Capacity
      C10            Tc (min)       I5 (mm/hr)            A (Ha)                        Q5 (m3/s)
      0.78              18              112                2.25         0.00278 x (0.95 x 0.78) x 112 x 2.25 = 0.52

The post-development discharge rates to the adjoining property up to Q5, being just the runoff from the
surface of the connecting drainage corridor, are calculated by the Rational Method as in Table 6 below.
These flow rates are all practically zero.

Table 6:        Rational Method Calculations Of Post-Development Flows Up To Q5 To No 2 Pearson Road
      C10              Tc               I (mm/hr)                     A                      Q (m3/s)
                      (min)            1 / 2 / 5                    (Ha)                   1 / 2 / 5
      0.90             10             97 / 109 / 147                0.018              0.003 / 0.004 / 0.006

The post-development discharge rates to the adjoining property from Q10 to Q100, as calculated by the
Rational Method for the partial area of 2.30 hectares shown in Figure 3, are summarised in Table 7,
below:

Table 7: Rational Method Calculations Of Post-Development Flows Q10 - Q100 To No 2 Pearson Road
      C10              Tc               I (mm/hr)                    A                      Q (m3/s)
                      (min)        10 / 20 / 50 / 100               (Ha)             10 / 20 / 50 / 100
      0.78             18         132 / 151 / 172 / 192             2.30            0.66 / 0.79 / 1.00 / 1.15

                                                                                       Less 0.52 m3/s Q5, =
                                                                                    0.14 / 0.27 / 0.48 / 0.63




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                                             Page 6

Page 8

The consequent changes in local discharges from the site, to No2 Pearsons Road, are collated from
Tables 4, 6 and 7 and summarised in Table 8, below. The changes are seen to be non-adverse, from Q1 to
Q100.

Table 8: Changes To Local Stormwater Discharges (m3/sec) From Site To No 2 Pearsons Road
 Scenario              Q1        Q2         Q5        Q10         Q20       Q50      Q100
 Pre-Development      0.25      0.30       0.45       0.56       0.66       0.85      0.97
 Post-Development    0.003     0.004      0.006       0.14       0.27       0.48      0.63




   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                         Page 7

Page 9

5.0     RUNOFF RATES TO FLOODWAY MODEL


5.1     Catchment Areas And Subdivision

Flood profiles along floodways such as the subject tributaries are affected by the hydraulic capacity of the
adjoining downstream reaches and by any waterway structures in those downstream reaches.
Accordingly, the Extran model extends some distance downstream of the site to the convergence of the
two tributaries just downstream of Pearsons Road, as shown in Figure 3. The catchment modelling
therefore includes not just the contributing areas alongside and upstream of the site, but also the areas
downstream of the site to that termination point downstream of Pearsons Road. The extent of the 151.7
hectare overall catchment is shown in Figures 4 and 5. The site occupies 8.0 hectare, or about 5 percent,
of the overall catchment area.

The catchment has been subdivided into 23 subareas for modelling of the pre-development scenario (as in
Figure 3), and 41 subareas for the post-development scenario (as in Figure 4). The subdivision of the
areas external to the site is identical between the two scenarios, whereas the subdivision of those areas
which discharge to the floodways within the site are treated differently between the two scenarios, to
allow for accurate modelling of the increased runoff from the proposed urban development of 65 percent
of the site area. The modelling of the post-development scenario also accounts for the Q5 splits of the
inflows to the bio-basins, which necessitates doubling-up of the relevant six subareas, taking the total
sub-area count to 47 as marked on Figure 5. The impervious fractions applied to each of the modelled
subareas are summarised in Table 9, on the following page of this report.


5.2     Design Rainfall Data

The Bureau of Meteorology has recently updated the rainfall intensity-frequency-duration data that was
previously published in Volume 1 of Australian Rainfall and Runoff (1987). The previous data was based
on rainfalls recorded up to 1985, whereas the latest data is based on rainfalls recorded up to 2010 / 2011.
There has also been a change of nomenclature, whereby the previous description of severity in terms of
“average recurrence interval” has been updated to “annual exceedence probability” for storms from 2-
year to 100 year severity. Rainfall intensities for the 1 year severity are still quoted for an average
recurrence interval of once per year. The updating has increased the rainfall intensities at higher ARI’s
(or lesser exceedence probabilities) by about 4 percent, compared to the previous data. The updated
intensity-frequency-duration data for Cooroy is reproduced in Appendix A of this report.




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                            Page 8

Page 10

Table 9: Impervious Fractions Assigned To Urbs Model Subareas

 

Pre-Development Scenario

Post-Development Scenario

 

 

 

 

 

 

Subarea Impervious Subarea Impervious
(Figure 1) Fraction (Figure 2) Fraction

1 0.10 1 0.10
2 0.15 2 0.15
3 0.15 3 0.15
4 0.35 4 0.35
5 0.15 5 0.15
6 0.50 6 0.50
7 0.20 7 0.30
8 0.06 8 0.60
9 0.10 9 0.00
10 0.30 10 0.60
11 0.30 11 0.50
12 0.58 12 0.50
13 0.65 13 0.50
14 0.28 14 0.50
15 0.45 15 0.50
16 0.45 16 0.50
17 0.00 17 0.50
18 0.04 18 0.50
19 0.08 19 0.60
20 0.31 20 0.00
21 0.35 21/22 0.30
22 0.25 23 0.37
23 0.45 24 0.58
25 0.65

26 0.28

27 0.45

28 0.45

29/39 0.15

30/40 0.15

31/41 0.50

32/42 0.50

33/43 0.55

34 0.55

35 0.55

36 0.45

37 0.08

38 0.60

44 0.39

45 0.35

46 0.25

47 0.45

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc

Page 9

Page 11

5.3     Model Calibration

The catchment runoff processes have been modelled with the “basic” variant of Version 3.5g of the Urbs
software, with the “Rational Method” procedure invoked so as to improve the routing simulation within
individual subareas, and with rainfalls converted to runoff via the initial/continuing loss procedure. The
operating parameters of the model which affect the outcome of the simulation are the storage lag
parameter (alpha), the non-linearity parameter (m), the initial rainfall loss (IL) and the continuing rainfall
loss (CL).

Ideally, the operating parameters should be calibrated to observed rainfall and runoff data in the subject
catchment, using either data from particular storm events or derived statistical data via a frequency curve
of recorded flows. In this instance, there is a streamgauge further downstream in the broader catchment
(at Cooran, where the contributing catchment area is 180 square kilometres, or about 120 times larger
than the subject catchment). This gauge has been recording flood flows for 60 years, but the accuracy of
its height/flow rating curve has been confirmed by current-metering to only just above the 1-in-2 year
flood height, which means that its usefulness for model calibration to flows of 5 year or greater severity
is very questionable.

The calibration has therefore reverted to an alternative process involving three stages:

- Calibration to Rational Method calculations of the peak flow rates from individual subareas and groups
  of subareas.

- Comparing the calibrated parameters from the first stage to the corresponding parameters from
  previous calibrations to other morphologically similar catchments with more highly rated streamgauge
  data.

- Comparing the predicted peak flow rates at particular locations in the modelled area to the
  corresponding flow rates in the 2002 L&T floodway model.

The Rational Method calibration has been applied to the peak flow rates entering the floodway model
near the upstream boundaries of the site and to the peak inflow rates from each of the subareas which
discharge to the floodway within the subject site. The relevant calculations are summarised in
Appendices B and C of this report, for the pre- and post-development scenarios respectively. An
acceptably close calibration to these calculated peak flow rates was achieved, as in Table 10 below and in
Table 11 on the following pages of this report, using an alpha parameter of 0.85 an m parameter of 0.8,
an initial rainfall loss of 16 mm, and a continuing rainfall loss of 2 mm/hour. The alpha parameter for
individual small subareas which discharge overland flow mostly as shallow sheet flow was increased by
arbitrarily applying reach factors of up to 3.

Table 10 :     URBS / Rational Method Peak Flow Calibration (m3/sec) For Pre-Development Scenario
              (Refer Figure 4 For Subarea Locations)
 Subareas       1 year        2 year        5 Year        10 Year        20 year        50 year       100 Year
   1–5         5.2 / 6.0     6.7 / 7.6    11.2/ 11.5     14.5 / 14.2   17.4 / 16.9    21.4 / 21.5    24.8 / 24.6
     7        0.29 / 0.29   0.36/ 0.35    0.54 / 0.52    0.64 / 0.63   0.78 / 0.75    0.96 / 0.95    1.10 / 1.10
     8        0.24 /0.25    0.30 /0.30    0.47 / 0.45    0.56 / 0.55   0.68 / 0.65    0.83 / 0.83    0.96 / 0.96
     9        0.21 / 0.23   0.26 / 0.27   0.40 / 0.40    0.49 / 0.49   0.60 / 0.59    0.74 / 0.74    0.85 / 0.85
  12 – 16      4.8 / 4.8     6.1 / 5.8     9.3 / 8.6     11.2 / 10.8   13.6 / 12.8    16.5 / 16.2    18.8 / 18.7
    17        0.19 / 0.22   0.24 / 0.26   0.39 / 0.38    0.48 / 0.48   0.59 / 0.57    0.72 / 0.71    0.82 / 0.83
    18        0.20 / 0.21   0.25 / 0.26   0.39 / 0.38    0.47 / 0.47   0.57 / 0.56    0.70 / 0.71    0.81 / 0.81
    19        0.19 / 0.21   0.23/ 0.25    0.37 / 0.37    0.46 / 0.46   0.56 / 0.54    0.69 / 0.70    0.79 / 0.79




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                            Page 10

Page 12

Table 11     URBS / Rational Method Peak Flow Calibration (m3/sec) For Post-Development Scenario
             (Refer Figure 5 For Subarea Locations)
 Subareas        1year        2 year        5 Year        10 Year        20 year        50 year       100 Year
    7         0.30 / 0.30   0.37 / 0.36   0.56 / 0.54   0.68 / 0.67    0.81 / 0.79    1.00 / 1.00    1.14 / 1.15
    8         0.05 / 0.05   0.06 / 0.06   0.10 / 0.09   0.12 / 0.11    0.14 / 0.13    0.17/ 0.17     0.19 / 0.19
    9         0.13 /0.14    0.17 /0.16    0.27 / 0.25   0.33 / 0.30    0.39 / 0.36    0.47 / 0.46    0.53 / 0.53
  10-18       0.19 / 0.20   0.24 / 0.24   0.37 / 0.37    ---- /-----    ---- / ----    ---- / ----    ---- / ----
    19        0.06 / 0.06   0.08 / 0.08   0.12 / 0.11   0.14 / 0.14    0.17 / 0.17    0.20 / 0.21    0.23 / 0.24
    20        0.19 / 0.20   0.23 / 0.22   0.39 / 0.34   0.47 / 0.42    0.55 / 0.50    0.66 / 0.64    0.74 / 0.74
  25-35       0.37 / 0.39   0.47 / 0.46   0.71 / 0.68    ---- / ----    ---- / ----    ---- / ----    ---- / ----
    36        0.21 / 0.21   0.26 / 0.25   0.39 / 0.38   0.48 / 0.43    0.56 / 0.56    0.68 / 0.70    0.77 / 0.80
    37        0.10 / 0.11   0.13 / 0.13   0.20 / 0.19   0.24 / 0.24    0.29 / 0.28    0.36 / 0.35    0.41 / 0.41
    38        0.06 / 0.06   0.07 / 0.07   0.11 / 0.11   0.14 / 0.13    0.16 / 0.16    0.19 / 0.20    0.22 / 0.23


The calibrated parameters compare favourably with those inferred from other morphologically similar
catchments having more highly rated streamgauge data. In this instance, data have been inferred from
previous model calibrations to streamgauge records in Moggill Creek and Bulimba Creek in the outer
suburbs of Brisbane, with a comparison as in Table 12 below:

Table 12 Comparison Of Adopted Operating Parameters With Other Calibrations
   Operating Parameter       Adopted Values          Moggill, Bulimba Creeks
          Alpha                   0.85                     0.80 – 0.83
            m                     0.80                     0.75 – 0.80
         IL (mm)                   16                        15 – 20
        CL (mm/hr)                  2                          2-3


The predicted peak inflow rates to the upstream end of the floodway model also compare favourably to
the peak flow rates in L&T’s Mike 11 floodway model, as in Table 13, below:

Table 13 : Comparison of BSM / CLT Peak Flows (m3/sec) At Upstream Boundaries Of Site
 BSM Subareas  CLT Mike XS        10 Year       20 Year       50 Year      100 Year
 1–5           T3-789             14.4 / 12.1   17.3 / 16.1   21.3 / 21.8  24.8 / 25.7
 12 – 16       T2-457             11.2 / 11.0   13.5 / 13.2   16.5 / 16.5  18.8 / 18.7



5.4     Linkage From Catchment Model To Floodway Model

BSM’s in-house ‘UrbsInt’ and “AsciXP” subroutines were used to convert flow outputs from particular
subareas or groups of subareas within the Urbs model to inflow hydrographs at particular nodes within
the floodway model, as in Table 14, hereafter:




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                            Page 11

Page 13

Table 14:

Discharge Points From Urbs Hydrologic Model To XPStorm Hydraulic Model

 

Pre-Development Scenario

Post-Development Scenario

 

Urbs Subareas
(Location, Figure 4)

XPStorm Node
(Location, Figure 6)

Urbs Subareas
(Location, Figure 5)

XPStorm Node
(Location, Figure 6)

 

 

 

 

 

1-5 1 1-5 1

6 3 6 3

7 4 7 4

8 8 8 7

9 13 9 8
10 16 10 - 18 10
11 20 19 11
12-16 23 20 13
17 25 21 16
18 28 22 20
19 - 20 31 24 - 28 23
21 32 29 - 36 27
22 35 37 28
23 38 3823 29
44 31
45 32
46 35
47 38

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc

Page 12

Page 14

6.0     FLOOD PROFILES, PRE-DEVELOPMENT

Version 9.28 of the Extran software, as embedded in the XPStorm modelling suite, has been used to
convert the catchment runoff hydrographs to flood profiles along the floodways. The extent and detail of
the model are shown in Figure 3 of this report. Te model provides approximately three times the detail of
the Mike11 model which L&T used in 2002 to model these floodways. The model network also includes
a number of interconnecting links to provide for simulation of overflows between the two tributaries
where they are aligned in close proximity, downstream of the site.

This version of the Extran software includes a facility to specify different internodal distances for the left
overbank, channel and right overbank segments, which in turn provides for a reasonably accurate
calculation by the software of the internodal flood volumes up to the peak flood level profile. This feature
was vital for checking that the reshaping of the floodway in the post-development scenario achieves the
required stormwater detention volumes, over-and-above the existing floodway volumes. Accordingly,
this facility was invoked for this analysis and separate internodal distances were measured and applied to
each connecting link of the model network.

Field-surveyed spot heights, which can be seen in the background of Figure 6 were used to define the
cross-section shape of each of the links between adjoining nodes of the model. The Manning’s n values
of the channel and overbank sectors of the floodways were perceived by site inspection. The adopted
values ranged from 0.035 for open grassed paddock or park, to 0.150 in densely timbered areas.
Examples of the adopted values are shown in Figures 7and 8 of this report.

The starting point for the simulations was the tailwater level just downstream of the convergence of the
two tributaries. Initial runs of the model, based on a “normal-depth” criterion at node 39 at the
downstream end of the model, simulated a 100 year tailwater level substantially higher than L&T’s
predicted tailwater level at this location. The slope of the outfall reach, between nodes 38 and 39, was
therefore artificially steepened so as to induce a simulated tailwater level much closer to the L&T level.

Initial runs of the model, for ARI’s of 2 year and 100 year, and for storm durations from 20 minutes to 9
hours, revealed that the critical storm durations varied from 1.5 hours to 3 hours along these floodways.
Accordingly, all subsequent simulations included three storm durations: - namely, 1.5, 2 and 3 hours.

The set-up of the model resulted in simulated flood levels near the upstream and boundaries of the site
that, apart from node 23, were generally at or slightly above the co-located levels from L&T’s Mike 11
model, as indicated in Table 15 below. Overall, the consistency between the two models appears to be
quite good, despite the considerable difference in network density between the two models.

Table 15 : Comparison of BSM / CLT Flood Levels (m) In Vicinity Of Site Boundaries
 BSM Node CLT X-Sect           10 year         20 Year            50 Year           100 Year
       3       T3-811      101.61 / 101.38 101.65 / 101.54 101.72 / 101.69 101.81 / 101.71
      16      T3-1199       99.60 / 99.58   99.68 / 99.61       99.74 / 99.68     99.79 / 99.71
      23       T2-389      100.98 / 101.33 101.05 / 101.39 101.12 / 101.47 101.17 / 101.51
      29       T2-611       99.89 / 99.82   99.95 / 99.89      100.01 / 99.97 100.05 / 100.05

The predicted pre-development peak flood levels at each node of the model, for ARI’s from 1to 100
years, are summarised in Tables 16 to 18 on the following pages of this report, where they are compared
to the corresponding post-development flood levels. The corresponding 100 year pre-development flood
profile is shown on Figure 10, and the pre-development 100 year boundary is mapped on Figures 9 and
13.



      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                            Page 13

Page 15

Table 16:

NODE

Predicted 1 Year To 5 Year Flood Levels (m) And Affluxes (m)
(Pre-Development Levels Are Based On Existing Floodplain Condition)

(Post-Development Levels Are Based On Proposed Floodplain Condition)
(Yellow shading indicates areas within site)

PRE-DEV

EASTERN TRIBUTARY

ON Oak WD =

NMNUNAZBBABABaAnnnany,
yONsH CO AN DAHKWNM =O

WESTERN TRIBUTARY

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

38
39

102.259
102.213
101.350
101.327
101.250
100.761
100.755
100.084
100.056
100.061
100.012
99.915
99.644
99.554
99.439
99.128
98.873
98.687
98.620
97.962
97.706
97.604

100.729
100.580
100.111
100.056
99.898
99.785
99.651
99.448
98.923
98.871
98.576
98.529
97.745
97.706
97.623

97.417
96.818

1 YEAR

POST-DEV AFFLUX

102.254
102.207
101.162
101.112
100.766
100.763
100.755
100.134
100.119
100.122
100.069
99.964
99.699
99.606
99.434
99.121
98.866
98.680
98.615
97.960
97.703
97.602

100.691
100.492
100.230
100.088
100.005
99.819
99.688
99.452
98.930
98.878
98.581
98.533
97.746
97.703
97.621

97.415
96.815

0.00
-0.01
-0.19
-0.22
-0.48

0.00

0.00

0.05

0.06

0.06

0.06
0.05
0.05
0.05
0.00
-0.01
-0.01
-0.01
-0.01
0.00
0.00
0.00

-0.04
-0.09
0.12
0.03
0.11

0.03
0.04
0.00
0.01

0.01

0.01

0.00
0.00
0.00
0.00

0.00
0.00

PRE-DEV POST-DEV AFFLUX

102.625
102.614
101.386
101.351
101.287
100.776
100.768
100.145
100.121
100.131
100.079
99.983
99.725
99.647
99.551
99.230
98.971
98.776
98.681
97.993
97.840
97.688

100.791
100.631
100.177
100.114
99.965
99.844
99.706
99.469
99.048
98.996
98.686
98.611
97.881
97.840
97.710

97.521
96.920

2 YEAR

102.635
102.624
101.200
101.134
100.783
100.780
100.769
100.203
100.200
100.205
100.149
100.040
99.777
99.689
99.545
99.224
98.966
98.771
98.678
97.992
97.841
97.689

100.768
100.562
100.297
100.156
100.075
99.891
99.758
99.477
99.053
99.000
98.692
98.614
97.882
97.841
97.710

97.521
96.920

0.01
0.01
-0.19
-0.22
-0.50
0.00
0.00
0.06
0.08
0.07
0.07
0.06
0.05
0.04
-0.01
-0.01
-0.01
0.00
0.00
0.00
0.00
0.00

-0.02
-0.07
0.12
0.04
0.11

0.05
0.05
0.01

0.00
0.00
0.01

0.00
0.00
0.00
0.00

0.00
0.00

PRE-DEV

102.977
102.969
101.542
101.479
101.395
100.846
100.829
100.295
100.299
100.323
100.270
100.195
99.963
99.887
99.799
99.471
99.192
99.057
98.832
98.088
98.033
97.841

100.923
100.730
100.317
100.233
100.095
99.969
99.833
99.538
99.266
99.223
99.036
98.832
98.084
98.032
97.927

97.721
97.124

5 YEAR

POST-DEV AFFLUX

102.978
102.969
101.368
101.213
100.871
100.867
100.849
100.473
100.461
100.457
100.404
100.272
99.992
99.926
99.792
99.461
99.186
99.053
98.830
98.086
98.031
97.839

100.923
100.709
100.433
100.297
100.213
100.032
99.893
99.549
99.265
99.221
99.033
98.830
98.082
98.031
97.924

97.718
97.121

0.00
0.00
-0.17
-0.27
-0.52
0.02
0.02
0.18
0.16
0.13
0.13
0.08
0.03
0.04
-0.01
-0.01
-0.01
0.00
0.00
0.00
0.00
0.00

0.00
-0.02
0.12
0.06
0.12
0.06
0.06
0.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

 

Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc

Page 14

Page 16

Table 17:

NODE

EASTERN
TRIBUTARY

OnNoahwhd =

NVNUNMAAHABBAAAA AH OG
NH COANDAHKRWNH =O

WESTERN
TRIBUTARY

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

38
39

Predicted 10 Year To 50 Year Flood Levels (m) And Affluxes (m)
(Pre-Development Levels Are Based On Existing Floodplain Condition)

(Post-Development Levels Are Based On Proposed Floodplain Condition)
(Yellow shading indicates areas within site)

PRE-DEV POST-DEV AFFLUX

103.013
103.000
101.605
101.553
101.447
100.920
100.903
100.415
100.404
100.428
100.375
100.305
100.002
99.956
99.877
99.604
99.347
99.180
98.931
98.173
98.111
97.938

100.977
100.777
100.377
100.287
100.147
100.021
99.888
99.604
99.379
99.347
99.153
98.934
98.172
98.111
98.043

97.823
97.224

103.013
103.001
101.509
101.305
100.949
100.946
100.923
100.635
100.616
100.615
100.568
100.386
100.037
99.996
99.875
99.600
99.342
99.176
98.928
98.170
98.108
97.934

100.998
100.777
100.504
100.364
100.277
100.097
100.957
99.614
99.377
99.343
99.151
98.931
98.169
98.108
98.039

97.819
97.221

0.00
0.00
-0.10
-0.25
-0.50
0.03
0.02
0.22
0.21

0.19
0.19
0.08
0.04
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.02
0.00
0.13
0.08
0.13
0.08
1.07
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

103.045
103.028
101.654
101.611
101.484
100.983
100.963
100.552
100.538
100.532
100.476
100.405
100.031
100.000
99.930
99.678
99.441
99.252
99.022
98.272
98.200
98.066

101.047
100.831
100.438
100.346
100.213
100.079
99.946
99.663
99.494
99.448
99.216
99.025
98.271
98.200
98.163

97.935
97.333

103.044
103.027
101.599
101.366
100.973
100.967
100.938
100.751
100.716
100.723
100.673
100.506
100.151
100.051
99.930
99.678
99.441
99.252
99.021
98.271
98.199
98.065

101.078
100.850
100.577
100.438
100.346
100.170
100.033
99.668
99.494
99.448
99.216
99.025
98.271
98.199
98.162

97.934
97.332

PRE-DEV POST-DEV AFFLUX

0.00
0.00
-0.05
-0.25
-0.51
-0.02
-0.02
0.20
0.18
0.19
0.20
0.10
0.12
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.03
0.02
0.14
0.09
0.13
0.09
0.09
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

103.083
103.059
101.723
101.679
101.530
101.009
100.979
100.634
100.604
100.627
100.572
100.518
100.144
100.055
99.999
99.737
99.541
99.318
99.121
98.381
98.299
98.210

101.123
100.890
100.504
100.411
100.282
100.144
100.007
99.730
99.649
99.555
99.273
99.124
98.381
98.299
98.280

98.045
97.445

103.082
103.058
101.702
101.452
100.989
100.982
100.948
100.811
100.778
100.787
100.726
100.580
100.234
100.135
99.998
99.737
99.539
99.317
99.119
98.379
98.297
98.207

101.167
100.930
100.662
100.521
100.426
100.253
100.115
99.735
99.647
99.554
99.272
99.122
98.379
98.297
98.278

98.043
97.443

PRE-DEV POST-DEV AFFLUX

0.00
0.00
-0.02
-0.23
-0.54
-0.03
-0.03
0.18
0.17
0.16
0.15
0.06
0.09
0.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.04
0.04
0.16
0.11
0.14
0.11
0.11
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

 

Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc

Page 15

Page 17

Table 18: Predicted 100 Year Flood Levels (m) And Affluxes (m)
(Pre-Development Levels Are Based On Existing Floodplain Condition)
(Post-Development Levels Are Based On Proposed Floodplain Condition)
(Yellow shading indicates areas within site)

100 YEAR
NODE PRE-DEV POST-DEV AFFLUX

EASTERN

TRIBUTARY
1 103.110 103.110 0.00
2 103.080 103.079 0.00
3 101.805 101.745 -0.06
4 101.731 101.529 -0.20
5 101.561 101.042 -0.52
6 101.025 101.034 0.01
7 100.910 100.986 0.08
8 100.720 100.856 0.14

9 100.667 100.825 0.16
10 100.702 100.838 0.14
1 100.642 100.767 0.13
12 100.594 100.629 0.04
13 100.216 100.293 0.08
14 100.116 100.192 0.08
15 100.051 100.038 -0.01
16 99.791 99.786 0.00
17 99.606 99.600 -0.01
18 99.357 99.354 0.00
19 99.186 99.181  -0.01
20 98.451 98.444 -0.01
24 98.363 98.357 -0.01
22 98.308 98.298 -0.01
WESTERN

TRIBUTARY

23 101.173 101.226 {0105
24 100.932 100.984 0.05
25 100.544 100.716 0.17
26 100.454 100.574 0.12
27 100.325 100.476 0.15
28 100.186 100.297 0.11
29 100.047 100.147 0.10
30 99.817 99.813 0.00
31 99.766 99.758 -0.01
32 99.620 99.615 -0.01
33 99.307 99.304 0.00
34 99.189 99.184 0.00
35 98.451 98.444 -0.01
36 98.363 98.356 -0.01
37 98.350 98.343 -0.01
38 98.110 98.103  -0.01
39 97.509 97.513 0.00

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 16

Page 18

7.0     FLOOD PROFILES, POST-DEVELOPMENT

7.1     Mitigation Concept For Increased Stormwater Runoff

The impact of the increased site runoff on flood profiles along the floodways is proposed to be mitigated
mostly by increasing the floodway storage on the site, and partly by conventional detention storage in
two of the proposed bio-basins. The increase in the floodway storage will be achieved by deliberately
roughening the floodways (by revegetating the riparian zones, as required by Council) and by
constructing a restrictive footbridge across the eastern tributary to back-up the flood profiles in that
tributary floodway.

A small additional amount of storage is also required to offset the minor intrusions of the development
platform into the pre-development 100 year flood boundary, and for some minor regrading of an artificial
hump in the existing low-flow channel around node 5 of the Extran model (as seen on Figure 10).

The full suite of the proposed modifications to the flood storage system is shown on Figure 9, with
additional detail on Figures 10 to 12.

The revegetation of the riparian zones, by planting of shrubs (typically, Lomandra sp) and trees at
densities of one item per 1.5 to 2 square metres, is presumed to increase the Manning’s n of the presently
grassed areas from 0.03/0.05 to 0.07.

The detention storages in the bio-basins are accounted as only the “live” storages, in the narrow range of
elevation between the riser overflow level and the weir level. The overflow level in the riser will be
controlled by an overflow slot in one side of the riser, with details as in Figure 12.

7.2     Model Simulation

An Extran model of the post-development scenario was compiled by adjusting a copy of the pre-
development model so as to include the reshaped and revegetated floodways and associated increases in
Manning’s n values, together with the inclusion of the proposed footbridge, the minor regrading of the
invert around Node 5, and hypothetical vertical walls at the boundaries of the proposed allotments.

The achievement of the required increase in floodplain volume, to offset the development’s stormwater
detention requirement, is summarised in Table 19, below:

Table 19:  Comparison Of Pre-Development And Post-Development Floodplain Volumes (m3)
           To Required Detention Volumes
                       1Year     2 Year  5 Year    10 Year   20 Year      50 year   100 Year
  Pre-Development      5456       6184    8515       9927     11352       12986       14493
  Floodway Storage
  Post-Development     5781       6591    9349      11121     12976       14807       16240
  Floodway Storage
   Floodway Gain        325       407      834       1194      1624        1821       1747
   Plus Bio-Basins      162       183      252        252       252         252         252
 Less Active Park Fill   -0         -0      -0         -0        -0         -18         -45
      Nett Gain         487       590     1086       1446      1876        2055       1954
         c.f.
 Req’d Extra Volume     395       525     770        910       1095        1370       1585
   (From Table 3)



      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                        Page 17

Page 19

The impact of the proposed development on peak flow rates downstream of the site is summarised in
Table 20, below. Flow rates leaving the site via the eastern tributary (nodes 15 – 16) will be slightly
reduced. Flow rates leaving the site via the western tributary (nodes 29-30) will increase, and this is a
result of the diversion of local stormwater runoff away from No 2 Pearsons Road and directly to the
western floodway. Further downstream along the western floodway, past the junction with the remaining
local runoff from that adjoining property (nodes 31-32), the post-development flows will revert to the
pre-development rates (within +/- 0.01 m3/sec). Further downstream, at the downstream end of the model
(nodes 38-39), where the two tributaries have converged, the flow-rates will be slightly reduced.

Table 20 :    Pre / Post-Development Peak Flow Rates (m3/sec) Through Downstream Properties
 Between      1 Year        2 Year      5 Year      10 Year       20 Year     50 Year     100 Year
  Nodes
 15 - 16      6.8 / 6.7     8.4 / 8.3    13.8 / 13.5   17.3 / 17.2   20.4 / 20.4   22.9 / 22.8   26.0 / 25.1
 29 - 30      5.1 / 5.7     6.4 / 6.7    9.9 / 10.3    11.9 / 12.8   14.4 / 14.9   17.6 / 18.2   20.0 / 20.6
 31 - 32      5.6 / 5.6     6.8 / 6.9    10.2 / 10.3   12.6 / 12.5   18.1 / 18.1   26.5 / 26.6   31.9 / 31.4
 38 - 39      12.8/12.6    15.9 / 15.9   24.3 / 24.2   30.2 / 30.0   38.1 / 37.8   47.9 / 47.8   55.0 / 54.1

The flood levels predicted by the post-development model have been compared to those for the pre-
development scenario in Table 16 to 18 on preceding pages of this report, for ARI’s from 1 to 100 years.
Yellow highlighting is used in those two tables to identify nodes that are within the site boundaries. The
flood level affluxes on all external properties as a result of the proposed development are generally seen
to be practically zero (maximum 0.01 metre), when quoted to the nearest centimetre.

The only exception to the abovementioned generality regarding affluxes is at node 23, just upstream of
the site boundary in the western tributary, where the affluxes will range from 0.02 metre in a 10 year
storm to 0.05 metre in a 100 year storm. The western channel between node 23 and the site boundary was
designed in 2006 to be deliberately revegetated to a Manning’s n of 0.15, as part of the adjoining Blue
Wren Place development. That revegetation was installed at the time of that development, but has since
been removed, thereby reducing the present (“pre-development”) Manning’s n in this area to about 0.04,
consequently decreasing the flood levels at node 23 to about 0.4 metre below the original design levels.
The post-development flood levels as a result of Valkev’s development, while being 0.02 to 0.05 metre
above the present levels, will nevertheless be at least 0.3 metre below the original design levels for this
area, and the quoted affluxes are therefore suggested to be of no consequence. This is illustrated by the
levels of the adjoining lot in Blue Wren Place, which are marked on the longitudinal floodway profiles in
Figure 10 of this report.

The corresponding 100 year post-development flood profiles are shown on Figure 10, and the post-
development 100 year boundary is mapped on Figure 13.

7.3     Sensitivity Test

The sensitivity of the development to uncontrolled regrowth along the floodways was examined by
applying a Manning’s n of value of 0.15 to all overbank sectors of all of cross-sections of the model. The
100 year flood levels predicted by this test are summarised in Table 21, on the following page of this
report, and in Figures 10 and 13. The design levels for the development platform should take due account
of these flood levels.




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                          Page 18

Page 20

 

Table 21: 100 Year Flood Levels (m) With Manning’s n 0.150 On All Overbank Areas

 

 

 

XPStorm Node Flood Level
3 101.78
4 101.67
5 101.16
6 101.15
7 101.11
8 101,00
9 100.98
10 100.98
11 100.91
12 100.81
13 100.55
14 100.43
15: 100.16
23 101.53
24 101.27
25 101.00
26 100.83
oF 100.70
28 100.50
29 100.30
30 100.00

 

 

 

 

8.0 CERTIFICATION

I hereby certify that the findings described in this report have been deduced by industry-standard
analytical procedures and that the Sunshine Coast Regional Council can rely on those findings in their
considerations of the relevant development application.

 

Denis Ogle, RPEQ 2405, 30 April 2014

 

Rrichane Gtarmwater Manacament Pty T td Dacument File: VallavSNF Dac Page 19

Page 21

NORTH




                                                                                                                                                                                                                                                      CORDWO
                                                                                                                                                                                                                                                            OD
                                                                                                                                                                                                                                                                                                      DRIVE




                                                                                                                                                                                                                                                                     M A SONRY
                                                                                                                                                                                                                                            16

                                                                                                                                                                                                                                                                                                  8



                                                                                                                                                                                                                                                      15
                                                                                                                                                                                                                                                                                                  9                           1
                           AD



                                                                                                                                                                                                                                                                                                                            RP173883
                         RO
                       NS




                                                                                                                                                                                                                                                                                                      10




                                                                                                                                                                                                                                                                           ST RE
                     SO




                                                                                                                                                                                                                                                           14
                    AR




                                                                                                                                                                                                                                                                                 ET
                    PE




                                                                                                                                                                                                                                                                                                                   11
                                                                                                                                                                                                                                                                                                                                  7




                                                                                                                                                                                                     32
                                                                     No 2, PEARSONS ROAD                                                                                                                                                                                                                           12
                                                                                                                                                                                                                                                                                                                              6


                            44                                                                                                                                                                      31
                                       43                                                                                                                                                                                                                                                                     13
                                                 42
                                                                                                                                                                                                                                                                                                                        5
                                                           41
                                                                     40                                                                                                              30
                            45                                                 39
                                                                                         38
                                                                                                   37
        E LM




                                                                                                             36                    33                                                                     28    27
                                                                                                                       35                                                                                                                                                                     100
                                                                                                                                                                                     29                                                                                                       PARK

                                                                                                                                  34
          STREE




                             46                                                                                                                                                                                               26
                T




                                  47        48        49
                                                                50                                                                                                              20
                                                                          51                                                                                   100                                                                               25
                                                                                    52                                                                                                                                   24
                                                                                              53                             56                                PARK
                                                                                                        54
                                                                                                                  55                                                                      21
                                                                                                                                                                           19
                                                                                                                                                                                                          22                                                     4
                                                                                                                            57                                                                                 23                                                                     BIO BASIN

                                                                                                                                                                                                                                                  3

                                                                                                                                                                      17                                                           2
                                                                                                                                                                                                                                                                             E
                                                                                                                                        BLUE R EN
                                                                                                                                                                                               18                    1
                                                                                                                                                                                                                                                                    D    RIV
                                                                                                                                                                                                                                                                ALD
                                                                                                                                                                                                                                                     ON
                                                                                                                                                                                                                                                  CD
                                                                                                                                             W




                                                                                                                                                                                                                                              A
                                                                                                                                                                                                                                          E M
                                                                                                                                                    PLA                                                                            LA K
                                                                                                                                                       C   E




                                                                                                                                                                                                                                                                                                                        0              SCALE        100 m


                                                                                                                                                                                                                                                                                                                                                   28 Apr 2014


                                                                                                                                                                                     VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
                                                                                                                                                                                     LOCALITY AND LOT PLAN                                                                                                                                     FIGURE 1

Page 22

NORTH




                                                                                                                                                                                                                                                                        CORDWO
                                                                                                                                                                                                                                                                              OD
                                                                                                                                                                                                                                                                                                                    DRIVE




                                                                                                                                                                                                                                                                                       M A SONRY
        PARTIAL-AREA LIMITS, FOR CALCULATION OF
        PRE- AND POST-DEVELOPMENT FLOW RATES                                                                                                                                                                                                                  16

                                                                                                                                                                                                                                                                                                                8



                                                                                                                                                                                                                                                                        15
                                                                                                                                                                                                                                                                                                                9                           1
                                             AD



                                                                                                                                                                                                                                                                                                                                          RP173883
                                           RO
                                         NS




                                                                                                                                                                                                                                                                                                                    10




                                                                                                                                                                                                                                                                                             S T RE
                                       SO




                                                                                                                                                                                                                                                                             14
                                      AR




                                                                                                                                                                                                                                                                                                   ET
                                      PE




                                                                                                                                                                                                                                                                                                                                 11
                                                                                                                                                                                                                                                                                                                                                7




                                                                                                                                                                                                                       32
                                                                                       No 2, PEARSONS ROAD                                                                                                                                                                                                                       12
                                                                                                                                                                                                                                                                                                                                            6


                                              44                                                                                                                                                                      31
                                                         43                                                                                                                                                                                                                                                                 13
                                                                   42
                                                                                                                                                                                                                                                                                                                                      5
                                                                             41
                          E LM




                                                                                       40                                                                                                              30
                                              45                                                 39
                                                                                                           38
                                                                                                                     37                              33                                                                           27
                                                                                                                               36                                                                                           28
                                                                                                                                         35                                                                                                                                                                 100
                                                                                                                                                                                                       29                                                                                                   PARK
                            STREE




                                                                                                                                                    34
                                               46                                                                                                                                                                                               26
                                  T




                                                    47        48        49
                                                                                  50                                                                                                              20
                                                                                            51                                                                                   100                                                                               25
                                                                                                      52                                                                                                                                   24
                                                                                                                53                             56                                PARK
                                                                                                                          54
                                                                                                                                    55                                                                      21
                                                                                                                                                                                             19
                                                                                                                                                                                                                            22                                                     4
                                                                                                                                              57                                                                                 23                                                                 BIO BASIN

                                                                                                                                                                                                                                                                    3

                                                                                                                                                                                        17                                                           2
                                                                                                                                                                                                                                                                                               E
                                                                                                                                                          BLUE R EN
                                                                                                                                                                                                                 18                    1
                                                                                                                                                                                                                                                                                      D    RIV
                                                                                                                                                                                                                                                                                  ALD
                                                                                                                                                                                                                                                                       ON
                                                                                                                                                                                                                                                                    CD
                                                                                                                                                               W




                                                                                                                                                                                                                                                                A
                                                                                                                                                                                                                                                            E M
                                                                                                                                                                      PLA                                                                            LA K
                                                                                                                                                                         C   E




                                                                                                                                                                                                                                                                                                                                      0              SCALE        100 m


                                                                                                                                                                                                                                                                                                                                                                 28 Apr 2014


                                                                                                                                                                                                       VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
                                                                                                                                                                                                       URBS MODELS OF STORMWATER DETENTION REQUIREMENT                                                                                                       FIGURE 2

Page 23

                                   AD
                                 RO
                                                                                                                                             NORTH




                               S
                            ON
                             S
                          AR
                      PE
                                 PARTIAL-AREA LIMIT, FOR CALCULATION OF
                                 PRE-DEVELOPMENT FLOW RATES
                                                                          No 2, PEARSONS ROAD
        ELM
            STREET




                                                              PRE-DEVELOPMENT SCENARIO
                               AD
                             RO
                             S
                        S ON
                     AR
                     PE




                           PARTIAL-AREA LIMIT, FOR CALCULATION OF
                           POST-DEVELOPMENT FLOW RATES
                                                                         No 2, PEARSONS ROAD

                                 44
                                              43                  FLOW
                                                        42   IN EXCESS S
                                                                       OF Q5
                                                                                    39
      ELM




                                 45                                                           38
                                                                                                        37                              33
                                                                                                                  36
                                                                                                                            35               BIO
       STREET




                                                                                                                                       34
                                 46
                                                                                                    FLOWS UP
                                                                                                             TO Q5
                                         47        48        49
                                                                    50
                                                                               51
                                                                                         52
                                                                                                   53                             56
                                                                                                             54
                                                                                                                       55


                                                                                                                                 57




                                                             POST-DEVELOPMENT SCENARIO
0       SCALE                            100 m
                                                                                                                                                     28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PROPOSED CHANGE IN DISCHARGE SCENARIOS TO No 2 PEARSONS ROAD                                                                                 FIGURE 3

Page 24

                                                                                                                                                                                       NORTH




                                                                                                                                                            T
                                                                                                                                                         E C
                                                                                                                                                    GE
                                                                                                                                                  W IL




                                                                                                                                                                       E
                                                                                                                                                                  IV
                                                                                                                                                                DR


                                                                                                                                         A   LD
                                                                                                                                       ON
                                                                                                                                     CD
                                                                                                                                  MA
                                                                                                                     KE
                                                                                                             LA


                                        ST RE ET
                               G EM
                                                                                                   COOROY
                       EL M




                                                                                                CEMETERY
                         S TREE
                              T




                                                                                      E
                                                                                 DRIV
                                                                             A LD
                                                                            ON
                                                                            CD
                                                                       E M
                                                                     LA K




                         COOROY
                                                                                                           ET
                                                                                                         S TRE
                                                                                                  KAURI




                                                                                                                                      ST
                                                                                                                                 NE
                                                                                                                        I   VI
                                                                                                                     OL
                                                                 SAPPHIRE STREET
                                                   STREET




                                                            PEARL STREET

                                                                                                                     RD
                                                                                                                 N
                                                                                                           TI
                                                                                                    AN
                       MA P




                                                      ELM




                                                                                          T   EW
                        LE
                              STRE ET




                                                                 DIAMOND ST

                                                                                                                                                                           0   SCALE           500 m
                                                                                              KAURI ST




      EM ERA LD
                  ST




                                                                                                                                                                                                  28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
CATCHMENT SUBDIVISION FOR PRE-DEVELOPMENT URBS MODEL         FIGURE 4

Page 25

                                                                                                                                                                                      NORTH




                                                                                                                                                                                                                                                                                    T
                                                                                                                                                                                                                                                                                   E C
                                                                                                                                                                                                                                                                                 GE
                                                                                                                                                                                                                                                                              WIL
                                                                                                                                                                                                                                                                                                   E
                                                                                                                                                                                                                                                                                              IV
                                                                                                                                                                                                                                                                                         DR


                                                                                                                                                                                                                                                                         LD
                                                                                                                                                           T
                                                                                                                                                        E C




                                                                                                                                                                                                                                                                      NA
                                                                                                                                                   GE




                                                                                                                                                                                                                                                                    O
                                                                                                                                                 W IL




                                                                                                                                                                      E
                                                                                                                                                                                                                                                                  CD
                                                                                                                                                                                                                                                                MA
                                                                                                                                                                 IV
                                                                                                                                                               DR



                                                                                                                                                                                                                                                           KE
                                                                                                                                             D
                                                                                                                                        AL
                                                                                                                                      ON

                                                                                                                KE
                                                                                                                               MA
                                                                                                                                    CD
                                                                                                                                                                                                                                                         LA
                                                                                                        LA

                                         T
                               ST RE E
                        G EM
                                                                                                                                                                                                                      ET
                                                                                              COOROY
                                                                                                                                                                                                              E M STRE
                                                                                                                                                                                                             G
                 EL M




                                                                                           CEMETERY
                   S TREE




                                                                                                                                                                                                                                                     COOROY
                        T




                                                                                  E
                                                                              RIV




                                                                                                                                                                                                      EL M
                                                                           D D




                                                                                                                                                                                                                                                     CEMETERY
                                                                       AL
                                                                      ON
                                                                      CD
                                                                 E M




                                                                                                                                                                                                       ST R E
                                                               LA K




                   COOROY




                                                                                                                                                                                                         ET
                                                                                                      ET
                                                                                                    S TRE
                                                                                             KAURI




                                                                                                                                   ST
                                                                                                                               E
                                                                                                                          IN
                                                                                                                OL
                                                                                                                     IV
                                                                                                                                                                                                                           DETAIL PLAN - SITE AREA   0          SCALE            200 m
                                                           SAPPHIRE STREET
                                             STREET




                                                      PEARL STREET

                                                                                                                RD
                                                                                                            N
                                                                                                      TI
                                                                                               AN
                 MA P




                                                ELM




                                                                                          W
                                                                                       TE
                  LE
                     STRE ET




                                                           DIAMOND ST
                                                                                                                                                                          0   SCALE           500 m
                                                                                         KAURI ST




EM ERA LD
            ST




                                                                                      OVERALL PLAN
                                                                                                                                                                                                                                                                                                       28 Apr 2014


                                                                                                                                                                                                                     VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
                                                                                                                                                                                                                      CATCHMENT SUBDIVISION FOR POST-DEVELOPMENT URBS MODEL                   FIGURE 5

Page 26

 

 

SCALE

BSM—

200m

28 Apr 2014

 

 

 

| VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY

 

 

| XPSTORM HYDRAULIC MODEL NETWORK

| [FIGURE 6 |

 

 

 

Page 27

     LOOKING DOWNSTREAM FROM NODE 10, THROUGH NODE 11 TO NODE 12




      LOOKING DOWNSTREAM FROM NODE 12, THROUGH NODE 13 TO NODE 14

                                                                    28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PHOTOGRAPHS OF EASTERN FLOODWAY ON 25 NOVEMBER 2013          FIGURE 7

Page 28

           LOOKING DOWNSTREAM FROM NODE 25, TO NODE 26




             LOOKING UPSTREAM FROM NODE 27, TO NODE 26
                                                                 28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PHOTOGRAPHS OF WESTERN FLOODWAY ON 25 NOVEMBER 2013          FIGURE 8

Page 29

                                                               NORTH




                                             0       SCALE     100 m




                                                                   28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PROPOSED FLOODWAY MODIFICATIONS                              FIGURE 9

Page 30

WESTERN TRIBUTARY




   EASTERN TRIBUTARY



                                                                                28 Apr 2014


                       VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
                       LONGITUDINAL FLOODWAY PROFILES                      FIGURE 10

Page 31

                               DETAIL OF CHANNEL RESHAPING




                           TYPICAL CROSS-SECTION DETAILS




                                                             28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
FLOODWAY CROSS - SECTION CHANGES, WEST TRIBUTARY      FIGURE 11

Page 32

                                                            DECK LEVEL 100.55 (10 YR FLOOD LEVEL)
                   0.25 M                0.4 M


  APPROACH FILL                                                                       APPROACH FILL



                        0.2 M DIA PILE           IL 98.63
                                                                         0.45 M DIA PILE




                  PROPOSED FOOTBRIDGE, LOOKING DOWNSTREAM
               (ONE 8.8 M CLEAR BRIDGE SPAN, PLUS THREE 2.2 M CLEAR BOARDWALK SPANS)




                                                                                                   Q5 STORAGE LEVEL
                                                                                                     Q1 STORAGE LEVEL
                   0.3 M BIO-STORAGE             0.7 M           0.4 M           0.1 M
                                                                                                                         WEIR


                                                                                                 N-3
                                                                                           1-O
                                                                                           SAND SURFACE AREA 200 M2



                                                                           1 M x 1M (INT) RISER BOX
                                                                           0.7 M WIDE x 0.4 M DEEP NOTCH IN ONE SIDE
           OUTLET PIPE, DIA AS REQ'D                                       SAFETY / TRASH RACK AS REQ'D
           TO CONVEY Q5 = 0.63 M3/SEC




                      BIO-BASIN SCHEMATIC, WESTERN TRIBUTARY


                                                                                     Q5 STORAGE LEVEL
             0.2 M BIO-STORAGE
                                                         0.2 M       0.07 M           Q1 STORAGE LEVEL

                                                                                                                        WEIR
                                                                                              -5
                                                                                     1 - ON
                                                                                  SAND SURFACE AREA 150 M2



                                                                   1 M x 1M (INT) RISER BOX
                                                                   1.0 M WIDE x 0.2 M DEEP NOTCH IN ONE SIDE
      OUTLET PIPE, DIA AS REQ'D                                    SAFETY / TRASH RACK AS REQ'D
      TO CONVEY Q5 = 0.35 M3/SEC




                            BIO-BASIN SCHEMATIC, EASTERN TRIBUTARY


                                                                                                                           28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
FOOTBRIDGE AND BIO - BASIN SCHEMATICS                        FIGURE 12

Page 33

                                                   NORTH




                                0        SCALE      50 m




                                                           28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
FLOOD LEVELS AND FLOOD BOUNDARIES                     FIGURE 13

Page 34

                             Appendices



          A.   Design Rainfall Data

          B.   Rational Method Calculations Of Floodway Inflows, Pre-Development

          C.   Rational Method Calculations Of Floodway Inflows, Post Development

          D.   Floodplain Storage Volumes




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                 Page 20

Page 35

                                      Appendix A



                                 Design Rainfall Data




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc   Page 21

Page 36

Saori k eta cercutag

“ Bureau of Meteorology

 

Location

Label: Cooroy
Latitude: 26° 24' 26"

Longitude: 152° 54! 51"

$)]

(Nearest grid cell: 152.9125 (E)]

mm)

Rainfall depth for Durations, Exceedance per Year (EY), and Annual Exceedance Probabilities (AEP).

EY

Duration : 1EY

1 min : ; 27
2 min 4.8
3 min 6.8
4 min 8.5
Simin 10.1
10 min 16.1
15 min - 20.4
30 min 28.9
1 hour 39.3
2 hour 52.3
3 hour — : 61.6
6 hour 81.4
12 hour 106.3
24 hour 134.9
48 hour 164.5
72 hour — 181.6
96 hour 194.2
120 hour 204.9
144 hour 214.8
/168 hour 7

224.5

11.4
18.2

- 23.0
326
44.4

59.4
70.4
93.9
124.0
158.8
194.4
214.5
229.4
241.2
252-3)
263.2

20%
42
7.4

10.4
13.0
15.4,
24.5
30.9

43.9

10% 5%
49 ~— 5.6
88 10.1
aza] 14a]
15.300 17.5
18.0 20.6
28.5 32.4
; 36.0 40.9
514 58.6
71.2 817,

118.0 137.6

97.8 113.4,

162.8 191.6

222.5 264.1

294.8 353;6
S712 450.7

413.8 505.7

442.8 542.9
465.2 570.8

484.2 593.7,
501.3 613.4

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc

95.7
134.5

164.3

231.0
321.7,
436.1,
564.9
640.0
690.6 :

106.4
“151.0
185.3
262.3
367.6
502.8
659.8
753.4
816.5
861.7
895.5

Page 37

                                      Appendix B



          Rational Method Calculations Of Floodway Inflows, Pre-Development




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc           Page 23

Page 38

Concentration Times


Subareas 1 - 5

Average Stream Velocity: 5-6% catchment slope = hilly; T = 1206 / 0.9 x 60 = 22 mins

Components Of Flow: 40 m sheet flow @ 10%        = 9 mins
                    530 m steep [email protected] m/sec = 7 mins
                    730 m [email protected] – 1.1 m/sec = 12 mins
                     Total:                          28 mins

Bransby-Williams: T = 58 L / A0.1 Se0.2 = 58 x 1.206 / 66.8 0.1 x 1.04 0.2 = 46 mins

From 22, 28, 46 mins (average 32) : Adopt Tc = 30 mins




Subarea 7

55 m sheet flow @ 4-5% = 12 mins
230 m swale/channel @ 5% = 4 mins
Total:                     16 mins



Subarea 8

130 m sheet flow, partly lawn @ 7% = 16 mins




Subarea 9

85 m sheet flow @ 8% = 13 mins


   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                 Page 24

Page 39

Subareas 12 — 16

Std inlet time for 10% grade = 9 mins
150 m pipe/kerb along Tewantin Rd@ 6% = 1.2 min
60 m pipe/kerb along Kauri St@ 4% grade = 0.6 mins
115 m pipe/kerb along Pearl St @ 4% grade = 1.2 mins
115 m pipe flow to sapphire [email protected]% grade = 1.8 mins
260 m open easement [email protected]% grade = 6.0 mins

370 m natural floodway @ hydraulic model 0.8 m/sec = 7.7 mins
Total: = 27 mins

Subarea 17

130 m sheet flow @ 4% = 19 mins

Subarea 18

90 m sheet flow @ 4%, partly lawn = 16 mins

Subarea 19
85 m sheet [email protected]%, average grass = 19 mins

85 m natural [email protected] m fall = 5 mins
Total: 24 mins

Q=0.00278 x FxCxIx A

(F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Subs Fi | C10 Tc I (mm/hr) A Q (m3/s)
(min)| 1/2 / 5 / 10 / 20 / 50 / 100 | (Ha)} 1/2 /5 / 10 / 20 / 50 / 100
1-5 | 0.21 | 0.74 | 28 60/67 / 90 / 107 / 123 / 140 / 155 | 66.8 | 6.0/7.6/11.5/14.2/16.9 /21.5 /24.6
7 0.20 | 0.74 | 16 80/90 /120/ 140 / 158 / 183 / 202 | 2.2 | 0.29/0.35/0.52/0.63 /0.75/ 0.95/ 1.10
8 0.06 | 0.71 16 80/90 /120/ 140 / 158 / 183 / 202 | 2.0 | 0.25/0.30/0.45/0.55 / 0.65 / 0.83/ 0.96
9 0.10 | 0.72 | 13 89 /100/133/ 155 / 175 / 201 / 221 | 1.64 | 0.23/0.27/ 0.40 / 0.49 / 0.59 / 0.74 / 0.85
12-16 | 0.50 | 0.80 | 24 61/73/ 98 / 116 / 130 / 153 / 165 | 44.4 | 4.8/5.8 /8.6 /10.8 /12.8 /16.3/ 18.7
17 0.00 | 0.70 | 19 73: 182/109 / 129 / 148 / 167 / 186 | 1.9 | 0.22/0.26/ 0.38 / 0.48 / 0.57 / 0.71 / 0.83
18 0.04 | 0.71 16 80/90/120/ 140 / 158 / 183 / 202 | 1.7 | 0.21/0.26/0.38/0.47/0.56/0.71/0.81
19 0.09 | 0.72 | 24 65/ 73/ 98/ 116/ 130/ 152 / 166 | 1.99 | 0.21/0.25 / 0.37 / 0.46 / 0.54 / 0.70 /0.79

 

 

Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc

Page 25

 

Page 40

                                      Appendix C



          Rational Method Calculations Of Floodway Inflows, Post-Development




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc            Page 26

Page 41

Concentration Times


Subarea 7

As per “Pre-Development”, Tc = 16 mins



Subarea 8

QUDM std inlet time, 6 – 7% slope = 10 mins



Subarea 9

Most of the area is within the 100 yr flood boundary: adopt Tc = 5 mins.



Subareas 10 - 18

50 m sheet flow across lawn @ 8% = 13 mins
50 m swale/pipe @ 1%             = 1 min
Total:                            = 14 mins



Subarea 19

30 m sheet flow across lawn @ 3% = 10 mins
45 m pipe / swale @ 2%           = 1 min
Total:                            = 11 mins



Subarea 20

Most of the area is within the 100 yr flood boundary: adopt Tc = 5 mins



Subarea 29 - 35

70 m sheet flow across lawn @3% = 17 mins
65 m pipe/kerb @ 2 m fall       = 1 min
160 m pipe @ 6 m fall           = 2 mins
Total:                           = 20 mins



   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc     Page 27

Page 42

Subarea 36

QUDM std inlet time for 8% grade = 10 mins
70 m wq-swale & pipes @ 1% = 2 mins
Total : = 12 mins

Subarea 37

As per “Pre-Development” : 16 mins

 

Subarea 38
QUDM std inlet time for 1.5% grade = 15 mins
5-10 m pipe = 0 mins
Total: = 15 mins
Q=0.00278 x FxCxIx A (F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)
Subs Fi C10 Tc I (mm/hr) A Q (m3/s)

(min) 1/2/ 5 / 10 / 20/50 / 100 | (Ha) 1/ 2/5/10 / 20/50 / 100
0.30 | 0.76 16 80/90/ 120/140 / 158/ 183/202 | 2.25 | 0.30/ 0.36/ 0.54 / 0.67 / 0.79 / 1.00/ 1.15
0.60 | 0.82 10 97/109 / 147/171 / 194/224/245 | 0.29 | 0.05/0.06/ 0.09 / 0.11 /0.13 /0.17/0.19
9 0.00 | 0.70 5 121/137 /185 / 216 / 247 / 288/318 | 0.72 | 0.14/0.16/ 0.25 /0.30/ 0.36 / 0.46 / 0.53
10-18 | 0.50 | 0.80 14 84/96 / 128 / - / - / -/ - | 1.35 | 0.20/0.24/0.37/ ----/ ---- / ---- / ----
19 0.60 | 0.82 11 94/106 /143 / 166 / 189 / 218/238 | 0.37 | 0.06/0.08 / 0.11 /0.14/0.17/0.21 /0.24
20 0.00 | 0.70 5 121/137 / 185 / 216 / 247 / 288/318 | 0.99 | 0.20/0.22 / 0.34 / 0.42 /0.50/ 0.64 /0.74
29-35 | 0.46 0.79 20 71/80/106/ --- / --- / --- /--- | 3.09 | 0.39/0.46/0.68/ --- / --- / --- /---
36 0.45 0.79 12 92 /103 /138/ 160 / 183/211 /231 | 1.32 | 0.21/0.25/0.38/0.48 / 0.56 /0.70/0.80
37 0.08 0.72 16 80 /90/ 120/140 / 158 / 183/202 | 0.84 | 0.11/0.13 / 0.19 / 0.24 / 0.28 / 0.35 /0.41
38 0.60 | 0.82 15 82/92 /124/ 144/ 164/ 188/206 | 0.40 | 0.06/0.07 / 0.11 / 0.13 / 0.16 / 0.20 / 0.23

 

 

oo;

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 28

Page 43

                                      Appendix D



                              Floodplain Storage Volumes




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc   Page 29

Page 44

PRE-DEVELOPMENT FLOODPLAIN STORAGE VOLUMES (CUBIC METRES)

USNODE DSNODE 1YEAR 2YEAR 5SYEAR 10YEAR 20 YEAR 50 YEAR 100 YEAR

3 4 273 286 356 398 438 490 549
4 5 127 136 178 204 225 250 273
5 6 583-612 724 815 900 957 988
6 7 648 669 776 910 1031 1075 1090
7 8 139 178 341 465 535 560 702
8 9 197 227 318 392 499 563 635
9 10 175 200 281 340 422 497 564
10 11 300 345 491 592 712 842 947
11 12 247 = 282 403 480 561 668 750
12 13 314 362 523 590 663 827 960
13 14 470 558 867 988 1071 1262 1462
14 15 310 386 615 718 792 900 1000
23 24 224 256 329 369 425 497 547
24 25 114 136 193 225 262 307 340
25 26 312 352 440 485 535 598 641
26 27 158 192 278 321 379 447 493
27 28 185 221 317 368 428 505 554
28 29 260 311 454 526 611 715 786
29 30 420 475 631 741 863 1026 1212
TOTAL 5456 6184 8515 9927 11352 12986 14493

POST-DEVELOPMENT FLOODPLAIN STORAGE VOLUMES (CUBIC METRES)

USNODE DSNODE 1YEAR 2YEAR SYEAR 10YEAR 20 YEAR 50 YEAR 100 YEAR

3 4 208 217 253 293 326 375 420
4 5 85 8691 114 148 168 195 229
5 6 646 667 785 896 929 951 1030
6 7 650 673 812 955 990 1000 1108
7 8 144 187 413 511 760 966 1065
8 9 225 263 436 568 681 756 818
9 10 197 9229 364 492 588 650 699
10 11 339 396 624 830 993 1095 1179
11 12 280 322 473 573 683 764 823
12 13 347 = 397 567 649 819 952 1047
13 14 523 607 941 1074 1268 1520 1697
14 15 323 400 630 736 822 953 1053
23 24 224 261 346 392 446 511 560
24 25 161 191 264 303 352 413 456
25 26 285 331 444 510 590 687 751
26 27 235 280 382 437 502 583 638
27 28 223 275 395 459 534 626 680
28 29 305 373 538 626 735 862 924
29 30 381 9 431 568 669 790 948 1063
TOTAL 5781 6591 9349 11121 12976 14807 16240

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 30

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.