Original source · versioned page text
Glen - REC13/0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
Table 21: 100 Year Flood Levels (m) With Manning’s n 0.150 On All Overbank Areas XPStorm Node Flood Level 3 101.78 4 101.67 5 101.16 6 101.15 7 101.11 8 101,00 9 100.98 10 100.98 11 100.91 12 100.81 13 100.55 14 100.43 15: 100.16 23 101.53 24 101.27 25 101.00 26 100.83 oF 100.70 28 100.50 29 100.30 30 100.00 8.0 CERTIFICATION I hereby certify that the findings described in this report have been deduced by industry-standard analytical procedures and that the Sunshine Coast Regional Council can rely on those findings in their considerations of the relevant development application. Denis Ogle, RPEQ 2405, 30 April 2014 Rrichane Gtarmwater Manacament Pty T td Dacument File: VallavSNF Dac Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.