Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Glen - REC13/0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

List Of Contents

1.    Summary                                                               3

2.    Introduction                                                          4

3.    Stormwater Detention Requirement                                      5

4.    Stormwater Discharges To No 2 Pearsons Road                           6

5. Runoff Rates To Floodway Model                                            8
5.1 Catchment Areas And Subdivision                                          8
5.2 Design Rainfall Data                                                     8
5.3 Model Calibration                                                       10
5.4 Linkage From Catchment Model To Floodway Model                          11

6.    Floodway Profiles, Pre-Development                                    13

7. Floodway Profiles, Post-Development                                      17
7.1 Mitigation Concept For Increased Stormwater Runoff                      17
7.2 Model Simulation                                                        17
7.3 Sensitivity Test                                                        18

8.    Certification                                                         19


List Of Figures (following text)

1     Locality And Lot Plan
2     Urbs Models Of Stormwater Detention Requirement
3     Proposed Change In Discharge Scenarios To No 2 Pearsons Road
4     Catchment Subdivision For Pre-Development Urbs Model
5     Catchment Subdivision For Post-Development Urbs Model
6     XPStorm Hydraulic Model Network
7     Photographs Of Eastern Floodway On 25 November 2013
8     Photographs Of Western Floodway On 25 November 2013
9     Proposed Floodway Modifications
10    Longitudinal Floodway Profiles
11    Floodway Cross-Section Changes – West Tributary
12    Footbridge And Bio-Basin Schematics
13    Flood Levels And Flood Boundaries


Appendices

A.     Design Rainfall Data
B.     Rational Method Calculations Of Floodway Inflows, Pre-Development
C.     Rational Method Calculations Of Floodway Inflows, Post-Development
D.     Floodway Storage Volumes




     Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc    Page 2
Log in to download the original file

Glen - REC13_0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.