Original source · versioned page text
Glen - REC13/0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
List Of Contents 1. Summary 3 2. Introduction 4 3. Stormwater Detention Requirement 5 4. Stormwater Discharges To No 2 Pearsons Road 6 5. Runoff Rates To Floodway Model 8 5.1 Catchment Areas And Subdivision 8 5.2 Design Rainfall Data 8 5.3 Model Calibration 10 5.4 Linkage From Catchment Model To Floodway Model 11 6. Floodway Profiles, Pre-Development 13 7. Floodway Profiles, Post-Development 17 7.1 Mitigation Concept For Increased Stormwater Runoff 17 7.2 Model Simulation 17 7.3 Sensitivity Test 18 8. Certification 19 List Of Figures (following text) 1 Locality And Lot Plan 2 Urbs Models Of Stormwater Detention Requirement 3 Proposed Change In Discharge Scenarios To No 2 Pearsons Road 4 Catchment Subdivision For Pre-Development Urbs Model 5 Catchment Subdivision For Post-Development Urbs Model 6 XPStorm Hydraulic Model Network 7 Photographs Of Eastern Floodway On 25 November 2013 8 Photographs Of Western Floodway On 25 November 2013 9 Proposed Floodway Modifications 10 Longitudinal Floodway Profiles 11 Floodway Cross-Section Changes – West Tributary 12 Footbridge And Bio-Basin Schematics 13 Flood Levels And Flood Boundaries Appendices A. Design Rainfall Data B. Rational Method Calculations Of Floodway Inflows, Pre-Development C. Rational Method Calculations Of Floodway Inflows, Post-Development D. Floodway Storage Volumes Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.