Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Glen - REC13/0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Concentration Times


Subarea 7

As per “Pre-Development”, Tc = 16 mins



Subarea 8

QUDM std inlet time, 6 – 7% slope = 10 mins



Subarea 9

Most of the area is within the 100 yr flood boundary: adopt Tc = 5 mins.



Subareas 10 - 18

50 m sheet flow across lawn @ 8% = 13 mins
50 m swale/pipe @ 1%             = 1 min
Total:                            = 14 mins



Subarea 19

30 m sheet flow across lawn @ 3% = 10 mins
45 m pipe / swale @ 2%           = 1 min
Total:                            = 11 mins



Subarea 20

Most of the area is within the 100 yr flood boundary: adopt Tc = 5 mins



Subarea 29 - 35

70 m sheet flow across lawn @3% = 17 mins
65 m pipe/kerb @ 2 m fall       = 1 min
160 m pipe @ 6 m fall           = 2 mins
Total:                           = 20 mins



   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc     Page 27
Log in to download the original file

Glen - REC13_0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.