Skip to the record
Accept no imitations.

Original source · versioned page text

Glen - REC13/0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

The consequent changes in local discharges from the site, to No2 Pearsons Road, are collated from
Tables 4, 6 and 7 and summarised in Table 8, below. The changes are seen to be non-adverse, from Q1 to
Q100.

Table 8: Changes To Local Stormwater Discharges (m3/sec) From Site To No 2 Pearsons Road
 Scenario              Q1        Q2         Q5        Q10         Q20       Q50      Q100
 Pre-Development      0.25      0.30       0.45       0.56       0.66       0.85      0.97
 Post-Development    0.003     0.004      0.006       0.14       0.27       0.48      0.63




   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                         Page 7
Log in to download the original file

Glen - REC13_0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.