Original source · versioned page text
Glen - REC13/0146 Flood Study BSM 30 April 2014. Email 2 Attachment 2
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
The consequent changes in local discharges from the site, to No2 Pearsons Road, are collated from Tables 4, 6 and 7 and summarised in Table 8, below. The changes are seen to be non-adverse, from Q1 to Q100. Table 8: Changes To Local Stormwater Discharges (m3/sec) From Site To No 2 Pearsons Road Scenario Q1 Q2 Q5 Q10 Q20 Q50 Q100 Pre-Development 0.25 0.30 0.45 0.56 0.66 0.85 0.97 Post-Development 0.003 0.004 0.006 0.14 0.27 0.48 0.63 Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.