Original source · versioned page text
Part RFI - Effluent Disposal Report
Job No: 20/0688 Date Tested: 08/08/2020 Site : 503 Middle Creek Road, Federal Client : Donovan Biss SCALE 1:500 Proposed Advanced Secondary ASTP (To be installed) Proposed Macerator Pump (To be installed) 12m 30m Proposed Studio 10.6m BH1 16% BH6 BH5 PN1 10m Slope PT1 PT2 BH3 BH2 PN3 PN2 BH4 3% PN4 Slope Proposed Residence Proposed Covered Surface Drip Irrigation Area - 320m2 (To be planted out (minimum 32 plants), mulched, bordered and installed) Wasteflow or Netafim Pressure- Compensating Dripper lines to be used)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.