RFI - Attachment 2 - Updated Engineering OPW Plans
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn PROPOSED INDUSTRIAL DEVELOPMENT
CIVIL - MATERIAL CHANGE OF USE & OPERATIONAL WORKS
LOT 252 ON SP104257
FOR
DEVCON CAPITAL 9 PTY LTD
AT
11 LEO ALLEY ROAD, NOOSAVILLE
Development Application no. MCU20/0127 & OPW20/0211
Consulting Civil &
Structural Engineers
Project Management
& Planning
PROJECT No. 192297 - FOR APPROVAL SUBJECT SITE
PROJECT MANAGER: MARK CUMMING PH - 07 5443 7777
Sheet List Table
Sheet Number Sheet Title
LOCALITY PLAN
REVISION: C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 13 pages
Page 2
LEGEND
MRV
BAY
AMENITIES
FFL 13.50
5 6 7 8 9 10
FFL 13.35 FFL 13.15 FFL 13.15 FFL 12.95 FFL 12.95 FFL 12.85
4
FFL 13.50
²
PARKING
FFL
RL 12.15
17 18 19 20 21
FFL 13.35 FFL 13.15 FFL 13.15 FFL 12.95 FFL 12.95
3
FFL 13.50
16 15 14 13 12 11
FFL 13.35 FFL 13.15 FFL 13.15 FFL 12.95 FFL 12.95 FFL 12.85 STORMWATER DRAINAGE NOTES
2
FFL 13.50
²
PARKING
1
FFL 13.30
BIN WASH AREA DETAIL
STORMWATER MANAGEMENT PLAN - NORTH
SCALE 1:400 (A3) STORMWATER MANAGEMENT PLAN - SOUTH
Consulting Civil & PROPOSED INDUSTRIAL 192297 C001
Structural Engineers STORMWATER COMPLEX 11 LEO ALLEY ROAD, E
Project Management MANAGEMENT PLAN DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 3
LEGEND
AMENITIES
5 6 7 8 9 10
FPL 13.15 FPL 12.95 FPL 12.95 FPL 12.75 FPL 12.75 FPL 12.65
4
FPL 13.30
FPL
17 18 19 20 21
FPL 13.15 FPL 12.95 FPL 12.95 FPL 12.75 FPL 12.75
3
FPL 13.30
16 15 14 13 12 11
FPL 13.15 FPL 12.95 FPL 12.95 FPL 12.75 FPL 12.75 FPL 12.65
2
FPL 13.30
1
FPL 13.10
³ SCALE 1:400 (A3)
³
³
Consulting Civil & PROPOSED INDUSTRIAL 192297 C100
Structural Engineers BULK EARTHWORKS PLAN COMPLEX 11 LEO ALLEY ROAD, E
Project Management DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 4
BLOCKWORK
RW2 BF1
BP2
RETAINING WALLS
BP1
RW1
RW5 ²
BP1 STEP FOOTING DETAIL
BP1 BP1
SCALE 1:40 (A3)
RW3 RW4 SEWER BRIDGING DETAIL
Consulting Civil & PROPOSED INDUSTRIAL 192297 C110
Structural Engineers RETAINING WALL DETAILS COMPLEX 11 LEO ALLEY ROAD, D
Project Management DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 5
CONCRETE SPOON DRAIN DETAIL
SCALE 1:40 (A3)
Consulting Civil & PROPOSED INDUSTRIAL 192297 C120
Structural Engineers SITE SECTIONS COMPLEX 11 LEO ALLEY ROAD, C
Project Management DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 6
LEGEND
AMENITIES
5 6 7 8 9 10
SCALE 1:400 (A3)
4
17 18 19 20 21
3
16 15 14 13 12 11
2
(A) ROCK ENTRY/EXIT PAD FOR BUILDING SITES
FIGURE 1 - PLACEMENT OF CHECK DAM SEDIMENT TRAPS
1 CHECK DAM SEDIMENT TRAP
‘ ’
FIGURE 1 - GEOFABRIC LINED BUND
GEOFABRIC LINED BUND
Consulting Civil & PROPOSED INDUSTRIAL 192297 C150
Structural Engineers EROSION AND SEDIMENT COMPLEX 11 LEO ALLEY ROAD, D
Project Management CONTROL PLAN DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 7
EROSION AND SEDIMENT CONTROL NOTES
CONSTRUCTION MANAGEMENT PLAN
EXCAVATED SEDIMENT TRAP
EXCAVATED SEDIMENT TRAP
INSTALLATION:
·
·
‘ ’
GRATED STORMWATER FIELD INLET TRAP
INSTALLATION OF SEDIMENT FENCE
‘ ’
SEDIMENT BASIN SIZING
Consulting Civil & PROPOSED INDUSTRIAL 192297 C151
Structural Engineers EROSION AND SEDIMENT COMPLEX 11 LEO ALLEY ROAD, C
Project Management CONTROL DETAILS DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 8
AMENITIES
DJ DJ
5 6 7 8 9 10
ET2
SJ
SJ SJ
DJ DJ DJ DJ DJ DJ
ET2 ET2 ET2 ET2
4
SJ
SJ
SJ
SJ
SJ
SJ
SJ
SJ
CJ
REINFORCED CONCRETE PAVEMENT
CJ
CJ
SJ SJ SJ SJ SJ SJ SJ SJ SJ SJ SJ SJ
SCALE 1:20 (A3)
CJ
SJ
SJ
SJ
CJ
DJ
SJ
SJ
SJ
SJ
CJ
ET2 ET2
SJ
SJ SJ
CJ CJ
ET1
ET1
17 18 19 20 21
SJ
SJ
ET2
CJ CJ
SJ
DJ DJ DJ DJ DJ
SJ
SJ
ET2 ET2
SJ
SJ
SJ
SJ
CJ
SJ
SJ
CJ
CJ
SJ SJ SJ SJ SJ SJ SJ SJ SJ SJ
DJ
SJ SJ
3
DOWEL JOINT TO EXISTING SLAB - DJ
SJ
SJ
SJ
SJ
SJ
CJ
CJ
CJ
SJ
SJ
ET2 ET2 ET2 ET2
SJ
DJ DJ DJ DJ DJ DJ
SJ SJ
16 15 14 13 12 11
SJ
DJ
CJ
SJ
SJ
SJ SJ
LEGEND
SJ
DJ
SJ SJ CONSTRUCTION JOINT - CJ
CJ
2
SJ
SJ
SJ SJ
DJ
150
SJ
ET2 ET2
CJ
SJ
SJ SJ
1 SAWN JOINT - SJ
DJ
SJ
SJ SJ
SJ
DJ SJ SJ
ET1
SJ
SJ
EDGE THICKENING DETAIL 1 (ET1)
SCALE 1:20 (A3)
GD
SCALE 1:400 (A3) SCALE 1:20 (A3)
GRATED DRAIN - GD
EDGE THICKENING DETAIL 2 (ET2)
SCALE 1:20 (A3)
Consulting Civil & PROPOSED INDUSTRIAL 192297 C200
Structural Engineers EXTERNAL PAVEMENT PLAN COMPLEX 11 LEO ALLEY ROAD, D
Project Management DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 9
SECTION Y
SCALE 1:40 (A3) C001
TYPICAL BIORETENTION BASIN AND OVERFLOW PIT DETAIL
SCALE 1:40 (A3)
TYPICAL BIORETENTION CLEANOUT DETAIL
SCALE 1:40 (A3)
290
BIORETENTION BASIN
This bioretention basin reduces the pollution of
our waterways by reducing the amount of
heavy metals, litter, suspended solids, and
210
nutrients discharged to the nearby waterway.
SCALE 1:40 (A3)
BIORETENTION EDUCATION SIGN SECTION X
TO BE FIXED USING S/S SCREWS TO POST OR FENCE AT EACH BIORETENTION BASIN IN SCALE 1:200 (A3)
SCALE 1:40 (A3) C001
A PUBLIC AREA OR VISIBLE TO PUBLIC FROM FOOTPATH
NOT TO SCALE
SECTION THROUGH DRIVEWAY - WESTERN SIDE (EASTERN SIDE DIFFERS)
Consulting Civil & PROPOSED INDUSTRIAL 192297 C300
Structural Engineers STORMWATER DETAILS COMPLEX 11 LEO ALLEY ROAD, C
Project Management DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 10
LEGEND
AMENITIES
5 6 7 8 9 10
4
17 18 19 20 21
CATCHMENT A
3
CATCHMENT AREAS (m²)
16 15 14 13 12 11
CATCHMENT D
1% AEP PEAK FLOW CALCULATION
2
CATCHMENT B
1
BIORETENTION BASIN WEIR FLOW CALCULATION
CATCHMENT C
SCALE 1:400 (A3)
Consulting Civil & PROPOSED INDUSTRIAL 192297 C380
Structural Engineers STORMWATER CATCHMENT COMPLEX 11 LEO ALLEY ROAD, D
Project Management PLAN DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 11
LEGEND
RL 12.15
17 18 19 20 21
FFL 13.35 FFL 13.15 FFL 13.15 FFL 12.95 FFL 12.95
3
FFL 13.50
16 15 14 13 12 11
FFL 13.35 FFL 13.15 FFL 13.15 FFL 12.95 FFL 12.95 FFL 12.85
2
FFL 13.50
“ ”
1
FFL 13.30
SCALE 1:400 (A3)
Consulting Civil & PROPOSED INDUSTRIAL 192297 C400
Structural Engineers SEWER AND WATER COMPLEX 11 LEO ALLEY ROAD, F
Project Management CONNECTION PLAN DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 12
REFER WATER AND SEWER PLAN DRAWING NO. C400 FOR DETAILED LAYOUT
ORIENTATION OF FIRE HYDRANT SERVICE AND WATER POTABLE SERVICE
DN150
DN25
DN65
NOT TO SCALE
Consulting Civil & PROPOSED INDUSTRIAL 192297 C410
Structural Engineers WATER CONNECTION COMPLEX 11 LEO ALLEY ROAD, A
Project Management DETAILS 1 DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 13
DN150
DN25
DN65
Consulting Civil & PROPOSED INDUSTRIAL 192297 C411
Structural Engineers WATER CONNECTION COMPLEX 11 LEO ALLEY ROAD, A
Project Management DETAILS 2 DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By
Page 14
LEGEND
AMENITIES
5 6 7 8 9 10
4
17 18 19 20 21
3
16 15 14 13 12 11
2
1
SWEPT PATH PLAN - NORTH
SCALE 1:400 (A3) SWEPT PATH PLAN - SOUTH
Consulting Civil & PROPOSED INDUSTRIAL 192297 C900
Structural Engineers SWEPT PATH PLAN COMPLEX 11 LEO ALLEY ROAD, A
Project Management DEVCON CAPITAL 9 PTY NOOSAVILLE
APPROVAL & Planning LTD
Issue Date Description By