                                   Form 6 - Decision Notice
                                   INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2006/1304                          Date of Decision:        21 June 2007

1.     APPLICANT DETAILS

 Name:               Wellclose Pastoral Company

 Postal address:     CARE Kidd & Co Designers
                     PO Box 262
                     NOOSA HEADS QLD 4567
 Phone no:           5447 5633              Fax no:       5447 5833

2.     PROPERTY DESCRIPTION

 Street address:     74 Peregian Esplanade Peregian Beach

 Real property       Lot 351 P 93114 County of March, Parish of weyba
 description:

3.     OWNER DETAILS

 Name:               Australian Pastoral House Pty Ltd

 Postal address:     CARE McCullough Robertson Lawyers
                     GPO Box 1855 BRISBANE QLD 4001

4.     REFERRAL AGENCIES

 Referral Agency            Address                                                     Basis
 N/A

5.     APPLICATION TYPE

 Development                      Development Details                        Preliminary        Development
                                                                              Approval             Permit
 Operational Works                Landscaping, Stormwater, Silt      &            No                Yes
                                  Sediment Control, Driveway         &
                                  Parking

6.     DECISION DETAILS

Council decided to approve the application and grant a Development Permit, subject to conditions.

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil

8.     SUBMISSIONS

Not Applicable.

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached.
Full text of the other 7 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                              2 of 8

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Nil

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                             Date:       21 June 2007




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  3 of 8




                                       Noosa Council Conditions
                                       INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION



Landscaping

1.    The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the
      approved plan of Development. The approved plans are Landscape Plan Drawing No. 0606 prepared by
      Tom Walsh Landscaping dated July 2006 and may be amended by these conditions

2.    All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
      be visible at all times to ensure prompt access in case of emergency.

3.    The landscape construction is to be implemented in accordance with the amended landscape plan,
      planting schedule and horticultural industry best practices.

4.    Prior to the commencement of all works, all trees to be retained except where required to be removed due
      to building operations must be protected with barricade fencing to prevent damage from soil stockpiling
      and compaction of the root zone, parked cars and machinery

5.    Provide 2 x 45 litre Banksia integrifolia trees midway the concrete footpath and the edge of the roadway.
      All street trees are to be provided with 1 metre mulch collars and staked securely for support and
      protection. Refer to the amended landscape plan for details and location.

6.    All native plant species located in group plantings shall not be subjected to any hedging maintenance
      regimes.

7.    All environmental weeds located east of the building line and road reserve area are to be removed prior to
      the commencement of all landscape works

8.    All street trees and internal trees 45 litre and greater must be securely staked and tied to assist their
      growth during the establishment period

9.    The density of planting must achieve the set out requirements as detailed on the approved landscape
      plan.

10.   The applicant must ensure that all landscaping treatment does not unduly restrict/prevent access to
      service meters within the site.

11.   All trees must be located a minimum of a minimum of 1.0 metres from all services to prevent root/service
      conflict and to provide future ease of maintenance requirements

12.   This Development Permit lapses if the development has not happened by 21 June 2009, unless
      application to extend the currency is approved by Council.
Frontage Works, Access, Car Parking, Stormwater Disposal, Sediment & Erosion Controls and Filling of the Site.
13.   The development shall be carried out in accordance with Engineering drawings Nos.

             7494/1-SW1-B         dated 19 January 2007        by Cardno

             7494/1-SW2-B         dated 19 January 2007        by Cardno

             7494/1-SW3-B         dated 19 January 2007        by Cardno

             7494/1-SW4-B         dated 19 January 2007        by Cardno

              or as modified herein.

14.   Roof and surface runoff connection to Council’s kerb and channel shall be as shown on drawing No.
      7494/1-SW1-B . Kerb adaptors shall be used in the kerb.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    4 of 8


15.   The transportation of all materials to and from the site shall be undertaken in a manner such that no
      particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
      be covered to prevent materials including dust being windblown from the vehicle..

16.   The total required pavement thickness shall be based on the Department of Transport’s Pavement Design
      Manual using soaked CBR tests of the subgrade.

      The design pavement thickness, together with CBR test results shall be submitted to Council’s Manager -
      Land Development for approval prior to placement of pavement material.

17.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
      first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
      These devices are to remain in place during the civil works and construction phases of the development.
      The location and type of device to be installed shall be established at the “pre start” meeting with
      Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
18.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
      intention to commence works to arrange a “pre start” meeting regarding the civil works.

19.   The principal contractor must have all the appropriate insurance and public liability documentation to carry
      out the works. The principal contractor is also responsible to ensure that any sub contractors also have
      the appropriate insurance and public liability documentation.

20.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
      signed approved drawings and conditions by the applicant.

21.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
      (This person will be the contact for the project).

22.   Council standards shall apply to these works unless otherwise modified herein.

23.   The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
      during the construction of the engineering works to ensure that Council property, road pavements or
      facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
      furniture etc.) are protected against any damage or interference whatsoever.

      If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
      Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
      engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager-Land
      Development and shall forthwith rectify the damage to that property or facility at its cost and to the
      satisfaction of the Manager-Land Development, prior to the commencement of the use or, alternatively,
      the Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
      being paid by the Applicant to the Council prior to the commencement of the use, provided that in the
      case of emergency the Council shall be entitled to rectify such damage at the cost of the Applicant, such
      cost being paid prior to the commencement of the use.

      A management strategy to ensure no damage occurs to Council services shall be given to Council for
      assessment prior to the pre start meeting.

24.   The development of the site shall be carried out in such a manner as to prevent dust and/or sand
      nuisance to residents and/or tenants in the vicinity of the development.

25.   Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
      pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
      hours are approved by the Manager-Land Development or his nominee.

26.   All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
      Traffic Control Devices and Traffic Infrastructure (Roads) Act.

27.   Safe pedestrian access on Peregian Esplanade shall be maintained at all times. Should footpath / road
      closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410
      512 505) must be notified prior to the proposed closure.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                               5 of 8


28.   Sediment and erosion control measures must be in place prior to works commencing. If such measures
      are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
      sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
      natural waterways. Although the sediment and erosion control measures have been approved on drawing
      No. 7494/1-SW4-B, Council’s Manager – Land Development may request further controls to be installed
      should approved measures be inefficient.

29.   The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant traps in
      accordance with the manufacturers specifications.

30.   The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps on a
      weekly basis and after each storm event.

      The owners of the subject property shall enter into an ongoing maintenance contract with a Registered
      Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on a regular three
      monthly cycle and on a “On Call” basis in the case of an emergency.

      The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be included in
      the maintenance program for the completed development.

31.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
      on construction works during the maintenance period, which is a minimum period of 12 months duration.
      Such bond must be lodged by, and shall only be accepted from the Developer for the works.

32.   The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
      completed.

33.   These works are also to be in compliance with the relevant conditions of Development Permit No.
      2006/0273.

34.   Notwithstanding that Council has checked the plans with due care, where it is found during construction
      that variations from Council's standards exist, then Council standards shall apply




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                              6 of 8



                                    Local Laws, Policies & State
                                    Regulation Requirements
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      Should any changes or modifications to the approved plans be required as a result of construction
        constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be
        made. Amended plans clearly indicating the changes must be lodged with this application along with the
        appropriate fees.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                                           7 of 8



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                       8 of 8

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c064b12\@[email protected]

Used in these records

About this file

File size
33 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00001304.001 [As Published].pdf · 33 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.