Original source · versioned page text
2017-03-07 Planning & Environment Committee Agenda
The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
Planning & Environment
Committee Meeting
Tuesday, 7 March 2017
commencing at 9.30am
Committee Room, 9 Pelican Street, Tewantin
Committee: Crs Joe Jurisevic (Chair), Ingrid Jackson, Brian Stockwell, Tony Wellington
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 90 sections
Section 2
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
PRESENTATIONS -
REPORTS FOR CONSIDERATION OF THE COMMITTEE 3
1 MCU16/0117 & OPW16/0212 DEVELOPMENT APPLICATION FOR MATERIAL
CHANGE OF USE FOR MULTIPLE HOUSING TYPE 4 CONVENTIONAL (6
UNITS) & OPERATIONAL WORKS FOR EARTHWORKS, STORMWATER,
DRIVEWAYS, PARKING & LANDSCAPING SITUATED AT 11 OPAL STREET,
COOROY 3
2 OPW17/0039 - DEVELOPMENT PERMIT FOR OPERATIONAL WORKS PLACING
ADVERTISING DEVICES - SIGNAGE AT 14 HASTINGS STREET, NOOSA HEADS 31
3 132007.1259.05 - DEVELOPMENT APPLICATION TO CHANGE THE
DEVELOPMENT APPROVAL AND EXTEND THE RELEVANT PERIOD FOR
VISITOR ACCOMMODATION, OFFICE, SHOPS AND RESTAURANTS AT 215A
DAVID LOW WAY, PEREGIAN BEACH 40
4 OPW16/0016 - PLANNING & ENVIRONMENT COURT APPEAL 281/2017
REFUSAL OF DEVELOPMENT PERMIT FOR OPERATIONAL WORKS -
PRESCRIBED TIDAL WORKS SITUATED AT 2 PARKYN COURT, TEWANTIN 53
5 REC16/0015 PLANNING & ENVIRONMENT COURT APPEAL 123/2017 FOR A
DEVELOPMENT APPLICATION FOR A RECONFIGURING A LOT (1 LOT INTO 2
LOTS & ACCESS EASEMENT) SITUATED AT 2 DAVID LOW WAY, CASTAWAYS
BEACH 56
REPORTS FOR NOTING BY THE COMMITTEE 61
6 WALLACE PARK FLYING FOX MANAGEMENT STRATEGIES 61
7 NOOSA BIOSPHERE RESERVE FOUNDATION BOARD - 6 MONTHLY REPORT 74
CLOSED SESSION -
Page 2 of 91
Section 3
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
REPORTS FOR CONSIDERATION OF THE COMMITTEE
1 MCU16/0117 & OPW16/0212 DEVELOPMENT APPLICATION FOR MATERIAL
CHANGE OF USE FOR MULTIPLE HOUSING TYPE 4 CONVENTIONAL (6 UNITS) &
OPERATIONAL WORKS FOR EARTHWORKS, STORMWATER, DRIVEWAYS,
PARKING & LANDSCAPING SITUATED AT 11 OPAL STREET, COOROY
DOCUMENT INFORM AT ION
Author Coordinator Planning, Patrick Murphy
Planning & Infrastructure Department
Index ECM / Application / MCU16/0117 & OPW16/0212
Attachments 1. Proposal Plans
2. Preliminary Approval Approved Plans
APPLICATION DETAILS
Applicant Tony Rossiter, Anoma Rossiter, Sean Murphy, Sharon Sales
Proposal Development Permit for Material Change of Use of Premises - Multiple
Housing Type 4 - Conventional (6 units) and associated Operational
Works for Earthworks, Stormwater, Driveways, Parking, Erosion and
Landscaping.
Properly Made Date 30 September 2016
Information Response Date 08 December 2016
Decision Due Date 17 March 2017
Number of Submissions Nil
PROPERTY DETAILS
Property Address 11 Opal Street, Cooroy
RP Description Lot 1 SP 248165
Land Area 1,536m2
Existing Use of Land Vacant
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Cooroy & Lake Macdonald
Zone Open Space Recreation
Assessment Type Impact
Page 3 of 91
Section 4
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
RECOMMENDATION
That Council note the report by the Coordinator of Planning to the Planning & Environment
Committee Meeting 7 March 2017 regarding Application No. MCU16/0117 & OPW16/0212 for a
Development Permit for a Material Change of Use - Multiple housing Type 4 - Conventional (4
units) situated at 11 Opal Street, Cooroy and:
A. Approve the application in accordance with the following conditions:
MATERIAL CHANGE OF USE CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
161006 – A1 B Site Plan 20/01/2017
161006 – A2 B Floor Plans – Type A 21/02/2017
161006 – A3 A Elevations – Type A 21/11/2016
161006 – A4 C Floor Plans – Type B 21/02/2017
161006 – A5 B Elevations – Type B 20/01/2017
3. Development authorised by this approval must be undertaken generally in
accordance with the Approved Plans listed within this Decision Notice. The Approved
Plans must be amended to incorporate the amendments listed within this Decision
Notice and resubmitted to Council prior to the issue of any Development Permit for
Building Works.
*(Refer to Advisory Note)
Building Height
4. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
5. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the buildings do not exceed the maximum height requirement of this Decision
Notice.
Building Appearance
6. Dwelling units must be old ‘Queenslanders’ re-located to the site. The re-conditioning
of the buildings must include weatherboard clad walls and tin or zincalume roofs.
7. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages nor adjoining
properties.
Page 4 of 91
Section 5
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
8. All deck and balcony areas above ground floor must not be enclosed by permanent
fixtures such as shutters, louvres, glass panelling or the like, except where required
to satisfy any privacy condition of this Decision Notice.
Protection of Privacy
9. To ensure privacy is protected between adjoining properties, any window/s, deck or
the like that overlooks or has the potential to overlook the private open space or
habitable room windows of neighbouring properties must either:
a. have a minimum window sill height or 1.5 metres above floor level
b. be fitted with translucent glazing
c. be fitted with a fixed external screen positioned in such a way to obscure direct
view
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Building Appearance
11. All air conditioning units or other mechanical equipment must be located at ground
level, or otherwise fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties.
External Works
12. Opal Street must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice
b. remarking of the existing on-street parking bays
c. linemarking of the access driveway signage.
13. The access driveway to the site from Diamond Lane must include the construction of
a passing opportunity for vehicles traversing Diamond Lane. The overall width of the
lane formation and the passing opportunity must be sufficient to allow vehicles to
pass.
Site Access and Driveways
14. A sealed access driveway must be provided from Opal Street and Diamond Lane to
all parking and manoeuvring areas of the development. The works must include in
particular:
a. a driveway crossover in Opal Street generally in accordance with RS-051
b. a vehicle crossover in Diamond Lane generally in accordance with the
approved plans. The crossover must not cause additional ponding of
stormwater in Diamond Lane or direct runoff onto the subject site or any
adjoining property.
Page 5 of 91
Section 6
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Car Parking
15. A minimum of 10 car parking spaces must be provided on the site. The works must
include in particular:
a. 2 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use
b. Dimensions, crossfalls and gradients in accordance with Australian Standard
AS/NZS2890.1:2004
16. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Pedestrian Facilities
17. Pedestrian facilities must be provided for the development. The works must include in
particular a 1.8 metre wide footpath within the road verge for the entire length of the
site’s frontage to Opal Street. In this regard, the existing path must be removed and
replaced with the new path.
Stormwater Drainage
18. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken generally in accordance with the
approved plans.
Electricity and Telecommunication Services
19. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
20. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
21. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
22. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
23. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
24. All earthworks must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Page 6 of 91
Section 7
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Damage to Services and Assets
25. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Waste Storage
26. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.
27. A bin wash area is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water
entry to the sewerage system which can be achieved by a bunded area, with a nib
wall height of 100mm maximum, enclosing a wash area of 700mm x 700mm
minimum (max 0.7m²). Alternatively the waste area can be roofed or any other
appropriate design approved by Council.
Landscaping
28. An amended landscaping plan must be submitted to Council for endorsement prior
the issue of a Development Permit for Building Works. The amended plan must
include in particular:
a. the works shown on the Approved Plans including a 2 metre wide planting bed
of native species suitable from screening the development to the Opal Street
and Diamond Lane frontage exclusive of the access driveway, generally
uncompromised by infrastructure items;
b. details of front boundary fencing along Diamond Lane and Opal Street;
c. Screening vegetation to the side boundary setback areas uncompromised by
infrastructure;
d. Species in accordance with Planning Scheme Policy 3 Landscape Plants and
Guidelines; and
e. Plans prepared by a landscape architect, landscape designer and/or
horticulturist with a minimum of 3 years current experience in the field of
landscape design.
29. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
30. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Front Boundary Fencing
31. Front fences or walls must be setback an average of 1 metre and are articulated to
provide visual interest by stepping the design at maximum 5m intervals. The area of
land between the fence and the front property boundary shall be densely landscaped
to screen any fencing from the street.
Page 7 of 91
Section 8
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Asbestos removal control plan
32. A Queensland licensed asbestos removalist (Class A and/or Class B) must submit to
council’s Environmental Health unit an Asbestos Removal Control Plan (ARCP) for
any structures that contain asbestos containing materials (ACM) prior to relocation of
the houses to the site. The asbestos removal control plan may incorporate the Safe
Work Method Statement (SWMS) and must include:
a. Details of the asbestos removalist and copy of licence(s)
b. Details of how the asbestos removal will be carried out including dates and
methods ( e.g. tools, equipment and personal protective equipment, monitoring
etc to be used etc)
c. Details of the asbestos to be removed, including location, type and condition of
the asbestos
d. Details of the treatment, transport, quantity, tracking (if more than 250kg) and
final disposal of asbestos waste
33. An independent competent person (as defined by the Work Health Safety Regulation)
must carry out a clearance inspection for any asbestos removal work conducted (i.e.
Class A & Class B) and submit to council’s Environmental Health unit a Clearance
Certificate prior to reconstruction or occupation of the houses.
Building Demolition/Removal/Relocation
34. Where the development involves the removal, relocation or demolition of a building, a
Waste Management Plan (construction and demolition) shall be submitted and
approved by Council’s Environmental Health Officer prior to issue of a development
permit for operational works for demolition, removal or relocation of any building other
than a shed.
The purpose of the Waste Management Plan is to facilitate the segregation of waste
for the effective reuse and recycling of such materials. Segregated wastes attract
significantly reduced disposal fees at the landfill with some items free. Higher gate
fees are charged for mixed waste.
Waste Management Plans (construction and demolition) are required to be submitted
in accordance with Planning Scheme Policy 11, Waste Management Plans.
Waste storage areas are to provide for adequate separation of all reusable,
recyclable and waste materials. These shall be located so that they are convenient
and safe to use.
The Plan shall contain the following information:
a. The site area for the storage and separation of waste is to be shown on the
plan drawings accompanying the application.
b. A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
Page 8 of 91
Section 9
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected Estimated On-site Off-site *specify
waste materials volume(m³) *specify proposed *specify contractor and
re-use or on-site contractor and landfill site or
recycling methods recycling outlet other disposal
site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
Waste Storage
35. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.
36. A bin wash area is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water
entry to the sewerage system which can be achieved by a bunded area, with a nib
wall height of 100mm maximum, enclosing a wash area of 700mm x 700mm
minimum (max 0.7m²). Alternatively the waste area can be roofed, or any other
appropriate design approved by Council.
Noise
37. Written certification is required from a suitably qualified person confirming that sound
pressure levels from all mechanical plant and equipment comply with the following :
38. Air-conditioning and Refrigeration
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable = background + 3dB(A)
39. Pumps
7am to 7pm: Maximum level allowable = background + 5dB(A)
7pm to 10pm: Maximum level allowable = background + 3dB(A)
10pm to 7am: No audible noise.
Assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building. All equipment should be
operating at the same time to test the overall noise level created, with the
measurement location at either the residential boundary or outside the most exposed
part of an affected building - whichever is the closest to the plant/equipment.
Page 9 of 91
Section 10
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
40. The certification must be submitted to Council, which certifies that operational noise
from any fixed plant and equipment complies with the requirements of this Decision
Notice.
OPERATIONAL WORKS CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
16-0604-C1 B Civil Works prepared by Lindsay 1 December 2016
Consulting Pty Ltd as annotated by
Council
16-0604-C2 B Civil Works Frontage Works prepared 1 December 2016
by Lindsay Consulting Pty Ltd as
annotated by Council
16-0604-C8 A Landscape Plan prepared by Lindsay 22/09/2016
Consulting
PRIOR TO COMMENCEMENT OF WORKS
Engineering
2. All necessary approvals from external service providers (eg Unitywater) and external
parties on which the development works are proposed have been obtained and a
copy supplied to Council.
3. A condition report of the drainage system must be completed for agreement at the
prestart meeting. The condition report is to include a CCTV inspection of the existing
pipe system in Opal Street extending from nearest surface pit east and west of the
subject site.
4. A condition report including photographs of the frontage of the site must be
completed and submitted to council at the prestart meeting / prior to any works
commencing.
5. Certificates demonstrating currency of public liability insurance and works insurance
covering the works must be submitted to Council at the prestart meeting.
6. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245.
The pre-start meeting must include the relevant parties for the following aspects of
the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties
Page 10 of 91
Section 11
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
7. A Construction Management Plan must be submitted to Council prior to the pre-start
meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and
traffic control measures prior to construction
ii. Maintenance of safe pedestrian access across the frontage of the site
both during daily construction and after daily construction has ceased
iii. Proposed fencing to the site during the construction phase of the
development
iv. Adequate parking arrangements for construction workers
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off
b. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures
c. Works programme identifying key components of the works and their respective
durations
d. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
8. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five
business days of the change occurring.
9. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
DURING CONSTRUCTION
Engineering
10. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must
be repaired immediately on completion of the works associated with the
development.
11. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit. Where municipal
works are involved, such confirmation must be submitted for the respective hold
points prior to any site inspection by Council Officers.
Page 11 of 91
Section 12
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
12. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice
b. The relevant conditions of the higher order Material Change of Use approval
c. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines
d. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site
Road works (External Road works & Road Widening Works)
13. All pavement widening or construction of new pavement must join neatly to the
existing pavement so that there are no irregularities in line or level resulting at or
adjacent to the join for the length of the construction. Where necessary the existing
pavement must be brought to a satisfactory standard to allow for the above.
14. All street surfacing must consist of a minimum depth of 30mm of an approved hot
mixed asphaltic concrete.
Pavement Design and Construction
15. The pavement design shown on the engineering drawings are not approved. The final
pavement design must be agreed on-site with Council’s Engineering Officer.
16. Pavement design for privately owned works must be undertaken in accordance with
the relevant standards. Structural integrity of the driveway and car park areas will
remain the responsibility of the property owner/developer and must be certified by an
RPEQ.
Works within Road Reserve/Reinstatement
17. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
18. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable
transition to existing road and verge/footpath profiles.
19. Electrical conduits or other services proposed to be installed within existing and
proposed road reserves under existing sealed carriageways, concrete pathways,
concrete/sealed driveways or significant vegetation must be installed by boring.
Trenching is not permitted, unless specifically approved by Council.
Pathways
20. All pathways must be constructed in accordance with the following requirements:
a. All footpath/cycleway must comply with Council’s Standard Drawing RS-065.
b. All paths must have a slip resistant surface
c. Expansion and contraction joints must provide a flush finish. Installation of joints
by saw cutting is preferred to ensure a smooth ride for cyclists
d. The required work includes any modifications to ensure the footpath finishes
flush with all existing service covers and the like, or alternatively these services
are raised or altered, so as not to create a pedestrian safety hazard
Page 12 of 91
Section 13
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
21. Pathways must:
a. terminate in a manner that ensures smooth transition to existing surfaces for
public safety
b. be designed and constructed to comply with the Disability Discrimination Act
(DDA), Access to Premises Standard, Austroads and relevant sections of
AS1428 Design for access and mobility
Site Access and Driveways
22. Driveway crossovers must be constructed in accordance with Council’s Standard
Drawing RS-051
23. Any existing unnecessary or redundant property accesses must be removed, and the
kerb, footpath and verge area reinstated to match the existing footpath and/or verge
treatments. Grassed verge areas to be reinstated must be provided with 100 mm
topsoil and grass seed or turf, and must be maintained by the developer until
established.
24. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete.
b. The driveway must be constructed so as not to concentrate stormwater runoff
onto neighbouring properties
c. Underground service conduits for water supply, electricity and any other
services must be provided as part of the access driveway
d. Where there is an existing pedestrian path, a matching crossfall must be
provided for the driveway on the alignment of the path, for the full width of the
path
Earthworks
25. All earthworks shall be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development.
Stormwater Drainage
26. Appropriate scour protection must be provided at the outlet of all stormwater pipes
including temporary outlets.
27. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (eg by blocking or interfering with natural overland
flows).
28. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Environment
29. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely to be
released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
30. Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants
from the site. The erosion and sediment control measures must be designed,
installed and maintained in accordance with current best practice standards (refer to
advisory notes).
Page 13 of 91
Section 14
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
31. Prior to the completion of the development, all site surfaces must be effectively
stabilised using methods which have achieved effective short-term stabilisation and
which will continue to achieve effective stabilisation in the medium to long-term (refer
to advisory notes). For the purpose of this condition, an effectively stabilised surface
is defined as one that does not, or is not likely to result in visible evidence of soil loss
caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water
contamination.
Damage to Services and Assets
32. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION / PRIOR TO COMMENCEMENT OF USE
Certification
33. Upon completion of the work a certificate must be issued by an RPEQ certifying that
the works have been constructed in accordance with the Operational Works permit.
Landscaping
34. An amended landscaping plan must be submitted to Council for endorsement prior
the issue of a Development Permit for Building Works. The amended plan must
include in particular:
a. the works shown on the Approved Plans including a 2 metre wide planting bed
of native species suitable from screening the development to the Opal Street
and Diamond Lane frontage exclusive of the access driveway, generally
uncompromised by infrastructure items;
b. details of front boundary fencing along Diamond Lane and Opal Street;
c. Screening vegetation to the side boundary setback areas uncompromised by
infrastructure;
d. Species in accordance with Planning Scheme Policy 3 Landscape Plants and
Guidelines; and
e. Plans prepared by a landscape architect, landscape designer and/or
horticulturist with a minimum of 3 years current experience in the field of
landscape design.
35. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
36. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Page 14 of 91
Section 15
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
As Constructed Plans (Council)
37. Prior to acceptance of civil works to become Council assets “On Maintenance”, the
lodgement of satisfactory “As Constructed” records must be submitted to Council.
The “As Constructed” information must include:
a. Drawings and data certified by a qualified experienced Civil Engineer (RPEQ)
for design intent, and certified by a Licensed Surveyor in regard to the cadastre
and the location, level and type of all services and structures
b. The data must be in accordance with Council’s – Planning Scheme Policy 5 –
Engineering Design Standards – Roads, Drainage and Earthworks, and fully
detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels
c. The data must be submitted in hardcopy form and digital format (Asset Design
and As Constructed (ADAC)) where required. Guidelines on the use of ADAC
are available at www.adac.com.au
On Maintenance
38. All municipal works must be accepted ‘On Maintenance’ by Council in accordance
with Council’s relevant Planning Scheme Policy prior to the commencement of the
use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance
with the requirements of this Permit
b. as Constructed details in accordance with Council’s Planning Scheme Policy
c. maintenance and operational manuals for all proprietary or site specific devices
Off Maintenance
39. Prior to requesting an Off Maintenance inspection the developer must provide a
written request for the Off Maintenance inspection.
40. A re-inspection fee in accordance with Council’s Fees and Charge Register will be
charged where:
a. a Council inspection reveals works do not comply with approval requirements
b. submitted certification falsely states works comply with approval requirements.
B. Find the following are sufficient grounds to justify the decision despite the conflict with the
Planning Scheme:
1. The Sport and Active Recreation Strategy identifies that the subject land is surplus to
Open Space Recreation land in Cooroy;
2. The Open Space Strategy identifies that additional land is required further north,
towards Cooroy’s residential growth areas along Lake Macdonald Drive and
Pearsons Road;
3. The proposed development provides smaller dwellings with varying bedroom
configurations which improves housing choice and is identified as community benefit
by Councils Strategic Land Use Planning Section.
4. The proposed dwelling types are broadly consistent with the character provisions of
the locality; and
5. The proposal is consistent with the Preliminary Approval which is valid until 31
October 2019.
Page 15 of 91
Section 16
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
REPORT
1. PROPOSAL
The application seeks approval for Material Change of Use of Premises - Multiple Housing Type
4 - Conventional (6 units).
It is proposed to develop 2 x 3 bedroom, 2 x 2 bedroom and 2 x 1 bedroom residential units. The
6 units are proposed to be within 4 re-located double storey buildings and accessed via a
common driveway extending north to south through the site connecting Opal Street to Diamond
Lane.
The site is within the Open Space Recreation zone, which reflects the site’s previous ownership
by the Cooroy Bowls Club.
The site has a current preliminary approval for Multiple Housing – Type 4 Conventional for 6 x 2
bedroom units on the site that is valid until 31 October 2019. The preliminary approval allows for
an inconsistent use on the site and calls for an Impact Assessable Development Application for
the use to obtain a development permit.
The application is subject to the assessment against the conditions of the preliminary approval,
the provisions of The Noosa Plan and any other applicable statutory instruments.
The applicant also seeks approval for operational works.
The application is before Council as the proposed Residential use is inconsistent within the Open
Space Recreation zone. Figures 1 to 3 detail a Locality Plan, Zone Map and a Site Plan.
Subject Site
Figure 1: 2016 Aerial Photograph
Page 16 of 91
Section 17
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Subject Site
Figure 2: Zone Map
Figure 3: Site Plan
Page 17 of 91
Section 18
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
2. SITE DETAILS
2.1. Background
The following table describes all the approvals given over the site, and their current status:
File Description of Approval Council Decision Date and Comments
Reference
TPC2846 Development Permit for 5 September 1995
Indoor entertainment, new
clubhouse, sport and Conditions required the completion of frontage works
recreation - new bowling including 25 angle car parks in Opal Street and a
green meandering footpath.
Council did the road upgrades to Pearl Street and the
Club constructed the car parks.
Due to the credit for the existing clubhouse, the
planning requirement was only 13 car bays.
23431 DA Development Permit for On the 1 July 2004, Council approved 21 motel units.
Motel – 21 Accommodation Reasons for the approval despite the inconsistency with
Units (Lapsed) the zoning are outlined below:
There has been considerable community support for
the proposal, including the Chamber of Commerce;
The motel is to be developed on the same site as the
bowls club, which has a low intensity of development;
and
There is a significant need for additional short-term
accommodation such as a motel in the town of
Cooroy.
Change – Permissible Change for On the 3 July 2008, Council gave approval to use the
TPC2846 Addition to Building - outdoor area on the western side of the bowls club to
Outdoor Smoking area allow for outdoor smoking area.
MCU10/21 Development Permit for On the 31 October 2011, Council issued the following
16 Reconfiguring a Lot approvals:
Preliminary Approval for Development Permit for Reconfiguring a Lot (1 into 2
Multiple Housing Type 4: lots) to subdivide the 5,059m2 Cooroy Bowls Club site
extended until 31 October into 2 lots (5 & 11 Opal Street
2019
Preliminary Approval for Multiple Housing Type 4 – 6 x 2
bedroom units with the following grounds to justify the
decision, despite the conflict with the planning scheme:
29. The proposed use is consistent with the existing
and preferred development pattern of the
surrounding area;
30. The land is not required for Open Space
Recreation, as demonstrated in the recently
endorsed Open Space Strategy 2011 and Sport and
Recreation Strategy 2011; and
31. The proposal maintains the existing bowls club on
the majority of the site.
Page 18 of 91
Section 19
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
2.2. Site Description
The site is located within Cooroy’s town centre, on the eastern side of the railway line.
The site which previously formed part of the Cooroy Bowls Club comprises a 1536m2 rectangular
shaped lot with 30m frontage to both Diamond and Opal Street. The land is relatively flat with
some planted vegetation adjacent to the front and western boundaries; there is no development
on site.
An 8m2 sewerage easement is situated in the south-western corner of the site.
2.3. Surrounding Land Uses
North: Diamond Lane and 12 and 14 Diamond Street
Diamond Lane: a modest lane of approximately 3.0 metres in width at the site frontage and
services the rear of several properties that front Opal and Diamond Street. It is the sole access
for a duplex dwelling at 15 Opal Street.
12 Diamond Street: Cooroora Veterinary Clinic which has a rear car park which gains access
from both Diamond Street and Diamond Lane.
14 Diamond Street: a double storey residential dwelling which fronts Diamond Street.
Both 12 and 14 Diamond Street are situated within the Semi-Attached Housing Zone.
South: Opal Street and 10, 12 and 14 Opal Street
Opal Street: a local road which provides access for both residential and commercial properties.
Nine car spaces, a power pole and a stormwater drain/pit are located within the road reserve.
10, 12 and 14 Opal Street: residential properties which have access from both Opal Street and
Opal Lane, all of these properties are within the Attached Housing Zone.
East: 15 Opal Street:
15 Opal Street: a single building containing 3 dwelling units which has its only access from
Diamond Lane, this property is within the Attached Housing Zone
West: Bowls Club
The main building of the Cooroy Bowling Club is adjacent to the common boundary with the
subject site. Situated between the building and the boundary is an outdoor seating area.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
State Planning Policies;
the South East Queensland Regional Plan;
State Planning Regulatory Provisions;
any Structure Plan or Master Plan in place for declared areas;
any Preliminary Approval Overriding the Planning Scheme for the land;
the Planning Scheme for the local government area; and
any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
Page 19 of 91
Section 20
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
3.2. State and Other Statutory Instruments
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the SEQ
Regional Plan Regulatory Provisions
3.3. Preliminary Approval Overriding the Planning Scheme for the land
MCU10/2116 & REC10/2072
On 1 November 2011 Negotiated Decision Notice MCU10/2116 & REC10/2072 was issued and
included Preliminary Approval for Material Change of Use of Premises for Multiple Housing Type
4 (6 Units) with a lapse date of 31 October 2015.
An extension to the relevant period was issued on 20 August 2015 which provided for a new
lapse date of 31 October 2019.
The Preliminary Approval is for 6 x 2 bedroom dwelling units occupying two separate buildings
with each unit serviced by a single car space. Details of the approval are provided in
Attachment 2.
The following table provides a comparison of key attributes of the preliminary approval and the
current proposal.
Criteria Preliminary Approval Current Proposal
Density 14.4 14.8
Gross Floor Area 525m2 535m2
Site Cover 33.1% 30.36%
Roof pitch 16o Gable Roof Type A > 15o & Type B > 15o
Min 600m eaves to 75% of 600mm Eaves to 84% of roof Type A = complies
building perimeter Type B = 50%
Landscaped Open Space 432m2 Approximately 575m2
Length of Wall 15.6 metres Type A = 11.9
Type B = 15.7
Boundary Setbacks
Frontage 6 metres 6 metres
Side 9.8 metres 2.5 metres
Side 4 metres 2.5 metres
Rear 6 metres 6 metres
Building Height
In storeys 2 storeys 2 storeys
In Metres 6.88 metres Type A = 7.6 metres
Type B = 7.4 metres
Car parking
Covered 6 8
Visitor 2 2
Table 2: Comparison of key attributes of the preliminary approval and the current proposal
Page 20 of 91
Section 21
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
The above table identifies that there are numerous aspects of the current application which are
consistent with the Preliminary Approval.
It is acknowledged that the current proposal seeks the development of 6 dwelling units within 4
buildings whereas the original proposal sought the development of the 6 dwelling units within 2
buildings. The current proposal is not considered to be a lesser outcome in that each building has
the appearance of traditional ‘Queenslander’ dwellings, includes adequate separation between
each new building and will be consistent with other residential built form in the surrounding area.
The current proposal seeks to develop dwellings with a greater height than the preliminary
approval however it is considered that the increase in height is a minor variation. The proposed
height is also consistent with the height of the dwellings to the rear of the adjoining property at 15
Opal Street and other dwellings within close proximity of the site.
3.4. Statutory Instruments – Planning Scheme
The subject site is located in the Cooroy & Lake Macdonald Locality and is zoned Open Space
Recreation Zone. The proposed use is identified as an inconsistent use within the zone and is
required to follow an impact assessable application process.
Locality Provisions
Cooroy and Lake Macdonald Locality Code
The site is within the Cooroy & Lake Macdonald Locality and is zoned Open Space Recreation.
The proposed Multiple Housing use is identified as an inconsistent use within the Locality Code
and therefore is required to follow an impact assessable application process. In relation to the
proposal, the most relevant overall outcome states:
6.7.2dd) For the Open Space Recreation Zone—areas of open space contribute to the
desired lifestyle of residents by offering a variety of passive and active recreational
experiences that are conducive to community interaction and wellbeing.
This inconsistency with the scheme was recognised at the time the preliminary approval was
issued when it was noted:
Despite the conflict with this overall outcome, it is recognised that the proposal maintains
the predominant recreational bowling use on the majority of the site, and the proposed
units are to be developed on a portion of the land, which the bowls club submits is surplus
to the requirements of their needs.
The proposed use of the currently vacant portion of the site for multiple dwelling units is
also in keeping with recent developments on adjoining Attached Housing zoned land and is
consistent with other overall outcomes of the Locality Code to develop areas surrounding
the business centre with a higher density.
There have been no changes to the Overall Outcomes within the Cooroy and Lake Macdonald
Locality Code or to the layout and use of the Cooroy Bowls Club since the preliminary approval
was issued that create conflict with the previous assessment.
Overall outcome 6.7.2h) states:
The urban community is predominantly accommodated in detached housing, although
areas close to Cooroy centre support semi-attached and attached residential development
and other properties in Cooroy township containing aged care housing.
It is considered that the development is consistent with this relevant outcome as it proposes
multiple housing units within 70 metres of the Business Centre zone within Cooroy. The adjoining
sites are predominantly zoned for Attached Housing and Semi-Attached Housing.
The Cooroy and Lake Macdonald Locality Code provides for Specific Outcomes for new uses in
the Open Space Recreation Zone; however due to the nature of the development the most
suitable assessment criteria to compare the proposal with is the Attached Housing Zone. This is
reflective of the adjoining land at 11 Opal Street and land on the opposite side of Opal Street.
Page 21 of 91
Section 22
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Assessment against the relevant Specific Outcomes for the Cooroy and Lake Macdonald Locality
and the Attached Housing Zone is detailed in the following table. Whilst generally complying with
the specific outcomes the proposal seeks to vary the requirements for roof form, length of wall
and side boundary setbacks.
Criteria Planning Scheme Current Proposal Complies
Density 100 person/ha = 15.36 14.8
Gross Floor Area 614.4m2 535m2
Site Cover 40% max 30.36%
Roof form 12o min pitch Type A = complies
Type B = complies
Min 600m eaves to 75% of Type A = <75% X
building Type B = <75% X
Landscaped Open Space Proposed population x 30m 2
Required = 444m2 Proposed = 575m2
Length of Wall 15 metres max Type A = 11.9
Type B = 15.7 X
Boundary Setbacks
Frontage 6 metres 6 metres
Side 3.7m (half building height) 2 metres X
Side 3.7m (half building height) 2 metres X
Rear 6 metres 6 metres
Building Height
In storeys 2 storeys 2 storeys
In Metres 8 metres Type A = 7.6 metres
Type B = 7.4 metres
Car parking 8 covered 8
2 uncovered 2
Table 3: Assessment of key attributes of the proposal against the Specific Outcomes for the Semi-Attached
Housing Zone
The most relevant specific outcomes are addressed below:
Specific Outcome: 05 Laneways
O5 Access for new uses is only taken off a laneway where upgrading works are carried out to
the laneway to enable the laneway to accommodate the anticipated levels of traffic.
The proposal seeks access from both Opal Street and Diamond Lane. Diamond Lane is a narrow
lane that currently provides rear access to a number of residential and commercial premises
which front Opal Street and Diamond Street and is the sole access point for the residential
development on the adjoining land at 11 Opal Street.
To ensure a satisfactory response to this specific outcome the construction of a passing
opportunity for vehicles traversing Diamond Lane is required.
Page 22 of 91
Section 23
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Specific Outcome: 016 Roof Forms
O16 The proposed buildings are re-located dwellings which do not provide 600mm eaves to
75% of the building. The proposed type of dwelling is consistent with the surrounding
character, with similar style dwellings within the vicinity of the site which generally do not
possess substantial eaves.
Specific Outcome: O42 Buildings and structures–
O42 The use of 4 separate buildings to accommodate 6 separate dwellings positively
responds to the streetscape character as the visual bulk and architectural form of the
buildings is consistent with those situated on adjoining and nearby land. The presentation
to Opal Street and Diamond Lane includes windows to both ground floor and the upper
level, decks, staircases and carports which will present to each street front as opposed to
the large walls approved by the preliminary approval.
Whilst dwelling type B has a wall of 15.7 metres in length this relates only to the ground floor
level and includes several windows which will provide for visual interest and internal amenity,
additionally visual interest will be generated by the use of weatherboard type materials.
Side boundary setback
The dwellings are setback as follows:
Planning Scheme Proposed
Eastern boundary Type A: 3.8 metres Type A: 2.5 metres
Type B: 3.7 metres Type B: 2.0 metres
Western boundary Type A: 3.8 metres Type A: 2.5 metres
Type B: 3.7 metres Type B: 2.0 metres
Variation to the side setbacks is considered reasonable as the eastern side setback will be
consistent with the 2.0 metre setback to the double storey dwelling situated to the rear of 15 Opal
Street which has a wall height similar to that of dwelling type B. Lesser variation is required to the
western side boundary which is also considered reasonable in light of the non-residential nature
of the adjoining land use. Both of the proposed setbacks provide sufficient area for access and a
landscape buffer to be developed adjacent to the boundary of at least one metre in depth.
Land Use & Works Provisions
The following codes which regulate land use and design are most applicable to this application:
Residential Uses Code
Engineering Works Code
Landscaping Code
Removal of Existing Carpark
The application proposes a dual access arrangement whereby access will be provided from both
Diamond Lane and Opal Street. As a result of an existing carpark constructed as part of the
Bowls Club development in 1996, the proposed driveway and crossover to Opal Street will result
in the removal of 1 car park.
Consideration was given to include a condition of approval for 1 additional parking space to be
developed further to the east to off-set the reduction. However a preliminary investigation
revealed an additional carpark in this location will require significant works to relocate existing
stormwater infrastructure which currently services the existing development at 15 Opal Street. It
was further considered that the additional carpark would impact the amenity of the adjoining
residential development which it would abut.
Page 23 of 91
Section 24
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Noting the decreasing rates of patronage of the Bowls Club and carpark vacancy, it is considered
that the removal of 1 car space will not unduly impact the functioning of the Bowls Club.
Notwithstanding the deletion of 1 space, it is considered that the balance car spaces is sufficient
to accommodate the likely number of users and intensity scale of the Bowls Club use.
Overlay Provisions
There are no Overlay Codes applicable to this application.
4. CONSULTATION
4.1. IDAS Referral Agencies
The application was not required to be referred to any IDAS Referral Agencies.
4.2. Other Referrals
The application was forwarded to Unitywater and the following internal Council specialists:
Strategic Land Use Planning
Engineering
Infrastructure Charges
The most pertinent comments are provided below:
Strategic Land Use Planning
Should the land not be needed for sport and recreation purposes the preferred use of the site
would be residential purposes and specifically multiple housing.
The site is well positioned within a short flat walk of a multitude of services including
transport.
Given that Cooroy is already dominated by low density detached dwellings of 3 or more
bedrooms a higher number of smaller dwellings would improve housing choice and be of
far greater community benefit.
The need for small dwelling units is illustrated by the 23 one and two person households on
the waiting list for social housing in Cooroy.
The application was originally for 4 x 3 bedroom dwellings units and was amended in response to
the above comments from Council’s Strategic Land Use Planning Unit to provide an array of
dwelling types including 2 x 2 bedroom and 2 x 1 bedroom dwellings.
Operational Works
The access driveway to the site from Diamond Lane must include the construction of a
passing opportunity for vehicles traversing Diamond Lane. The overall width of the lane
formation and the passing opportunity must be sufficient to allow vehicles to pass.
A condition to the permit has been included to address the need to provide for passing
opportunities within Diamond Lane.
Infrastructure Charges
The development approval triggers an Infrastructure Charge Notice for $58,813.00 at CPI
December 2016.
4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Sustainable
Planning Act 2009. No properly made submissions were received.
Page 24 of 91
Section 25
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
5. CONCLUSION
The application to develop 6 dwelling units on a vacant portion of the existing Cooroy Bowls Club
land, conflicts with the purpose of the Open Space Recreation zoning. Although the conflict
exists, there are sufficient grounds for 6 dwelling units to be developed on the site.
The Sport and Active Recreation Strategy 2011 and the Open Space Strategy 2011 suggest that
the location of the currently vacant 1,536 m2 portion land is not needed for the open space
recreation purpose.
The proposed dwelling mix provides for an array of dwelling types that has been identified by
Council’s Strategic Land Use Planning Unit as providing a higher number of smaller dwellings
that will improve housing choice and be of community benefit.
The proposed use as multiple housing will provide for permanent accommodation in a dwelling
type, which is consistent with the Overall Outcomes for the Locality and is consistent with the
Preliminary Approval which is valid until 31 October 2019.
The application is, therefore, recommended for approval, with conditions.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office x Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance x Planning & Environment
Human Resources x Strategic Land Use Planning
Sustainability
Page 25 of 91
Section 26
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 1
Page 26 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 1
[a __. a,
=)" :
| ence | we ce _| j= at a Lo
ve! iE roy 4
| Be > PL om | Ee ©
DECK | ade] | <= | ie PS E
ea | LP _& aie
cI Ho=n4 i = | SSe7 |
AN Is
UPPER FLOOR PLAN GROUND FLOOR PLAN
chi. ca
22S ~ —
ug 22 2 == _ oe —— (NN
ESS —WN"NE a _
ELEVATION A ELEVATION B
slit Mt
ae aI|ssooOoOoOoOos SS _
_ al SE
ELEVATION C ELEVATION D
re [ Ase fpjs2 | fo
| | BED 2 KITCHEN a] : fete :
t = - |
not SE a ==
»> = iC DINING | oe © > = GARAGE CARPORT <0
Ee FAMILY 2 Ss | ene |
2 LOUNGE |: I \77 | LOUNGE |
Pap | | rp
WS WS
UPPER FLOOR PLAN cara CrOOR PLAN
Page 26 of 91Section 27
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 27 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
so ce OM
SS —__ LEO
ma see
_- SSS _- aaa ae _—
=e 2]2 =
ELEVATION A ELEVATION B
cso ea NNN
ELEVATION C ELEVATION D
Page 27 of 91Section 28
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 2
Page 28 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 2
By EEA ry bits Eh ee -
Ry. Ricca: I a Test | | |
AW} visitor 1 x | | |
{-]) visitor 2 3
CET :
3 Ly f | Cj | |
Sl) } pty 2124p 2124p 2124p ) 2124p 2124p Jj 2124 _[ i
e x r 4 een) <a 1 —_ , 7 ty
| | | i. | oat yl -
Ca = bro | co Pr in 2 <
YEE ae 1) (lay as & 3} 1)
‘ton _f* ee | te == | a |
: SB De Jel SBS Ata tt. OB Aled 8&6 Aa | = |
= LES err) er a = Lee | a js 5
E- “et IB >
| 3 Wa) cmc] ~jRS} | ex 5% (Ta ] =
: =a 1 | oa <x
“GH *] | }} 2 |
mane. | | | Oe
" \ | |e | - eens | 224g — xo
SS ee aL | vat) (eee am | (WS |
\ bn private ha \ fal LI tan = an S| tit ie * |
\— | Hia open space fii ma} in [8 i 2 am Nt |
: / tins wu | mmanpmanmenneatl [ ] itn i p pane ene me mnt x | |
_ Ss Hh Ai op gi IA
2124p! 2124p! 2124pI
————4. ie, — =
| GARAGE | |
| | |
1 Ww oan E20]
Fas! | FS | |
S Boe ced EE 2
— a es ts = :
Ss | Oe] SF | )
4 KITCHEN = |
4]: CS acm
a |
| DINING
| unit 2&5 unit3&6 |
unit 1 & 4 — pre |
a...
iF ceeeenemnmmnniinnticieiesinatteneient
| | 1809dh —2124sqa [212489 gdh
SSS SS
___2124sqd__1809dh
= 5550 ” 5550 we 5550 a
6010 11480
Page 28 of 91Section 29
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 29 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
: gt le
— See — E a] 44
de begs bed i,
EB ms oe =e | 3
pee ae |
1 ‘ 1 AN _ 74 728 £0 | 2, |
a | Loe | | ’
D> tt 3 1 | =
aq | Bee cle.
Da I 0924 0915 sis 924 - et
ons oe __| unit 2 & 5 unit 3&6
unit 1 & 4
aes ns Beem ate oS epee eee eee ll
{in } HA TA Hy | | Ht HH | Ly]
j Hdl] TEE TTT] || F ety
TREE colorbond roofing 1 |
LIF CPT LPT PTF Te TT] ses |
WTA APTA PRE TA 17 abe ogi HE |
Ee
. | -
| Ea — —" = Saat — |
| | | veneer
EAST ELEVATION
Th mM TTTTTTT ] TIMI rT ne
Ih NTT } | Hi] | lil HH it TEM HERTHA || II
ST | Golotbond roofing | aT ii H|
WUE EE
— i hi ee = i 7 pee en iH i cladding
— eet lal fo hela Cade
A Sz ST Mmmm
ean
| | veneer |
A : i
WEST
Page 29 of 91Section 30
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 30 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
WAL
at :
tors mari i i i =
} AZO itn
46 —T CJ ae
t
ZO CUT
| brick a ee
veneer
NORTH ELEVATION
:
qs
ri | | Vise
PATEL =i
| a | ~
brick veneer
veneer
SOUTH ELEVATION
Page 30 of 91Section 31
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
2 OPW17/0039 - DEVELOPMENT PERMIT FOR OPERATIONAL WORKS PLACING
ADVERTISING DEVICES - SIGNAGE AT 14 HASTINGS STREET, NOOSA HEADS
DOCUMENT INFORM AT ION
Author Development Planner, Wilhelm Koschade
Planning & Infrastructure Department
Index ECM/ Application/ OPW17/0039
Attachments 1. Street Views from Noosa Parade & Witta Circuit
2. Street Views from Hastings Street
APPLICATION DETAILS
Applicant Signcraft
Proposal Development Permit for Operational Work (Advertising Devices)
Properly Made Date 01/02/2017
Information Request Date Not Applicable
Information Response Date Not Applicable
Decision Due Date 29/03/2017
Number of Submissions Not Applicable
PROPERTY DETAILS
Property Address Sofitel Noosa Pacific Resort 14 Hastings Street Noosa Heads
RP Description Lot 7 RP 802632
Land Area 9946 Square Metres
Existing Use of Land Visitor Accommodation Type 4 - Conventional
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Noosa Heads
Zone Visitor Mixed Use
Overlays Natural Hazards (Flood Hazard & Bushfire Hazard)
Assessment Type Code
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 7 March 2017 regarding Application No. OPW17/0039 for a
Development Permit for Operational Works - Signage situated at 14 Hastings Street, Noosa
Heads and approve the application in accordance with the following conditions:
PLANNING
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Page 31 of 91
Section 32
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Plan No. Rev. Plan/Document Name Date
SCF477A_a 0 Diagram 1: Sign Location (Sheet 3), drawn by 21 January 2017
VISTEK
SCF477A_a 0 Diagram 2: Sign Arrangement (Sheet 4), drawn 21 January 2017
by VISTEK
SCF477A_a 0 Diagram 3: Section A-A (Sheet 8), drawn by 21 January 2017
VISTEK
SCF477A_b 0 Diagram 1: Sign Location (Sheet 3), drawn by 24 January 2017
VISTEK
SCF477A_b 0 Diagram 2: Sign Arrangement (Sheet 4), drawn 24 January 2017
by VISTEK
SCF477A_b 0 Diagram 3: Section A-A (Sheet 8), drawn by 24 January 2017
VISTEK
SCF477A_b 0 Diagram 1: Sign Location (Sheet 3), drawn by 24 January 2017
VISTEK
SCF477A_b 0 Diagram 2: Sign Arrangement (Sheet 4), drawn 24 January 2017
by VISTEK
SCF477A_b 0 Diagram 3: Section A-A (Sheet 8), drawn by 24 January 2017
VISTEK
2. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed within this Decision Notice.
Nature and Extent of Approved Development
3. This approval authorises the following signs as defined by the planning scheme and shown
on the Approved Plans:
a. Three illuminated wall signs.
4. The approved signs must not be used for the advertisement of goods and/or services not
sold or conducted on the site (ie. third party advertising).
5. The approved signs must not exceed the dimensions and sign areas as shown on the
Approved Plans.
Illumination
6. The approved signs must not incorporate flashing lights nor involve illumination by any
means other than:
a. an internal light source
b. a down light, if externally lit.
7. Illumination resulting from direct, reflected or other incidental light emanating from the
approved signs must not exceed a luminance of 300 candelas per square metre.
8. All sign illumination must be switched off between 11:00pm and sunset of the following day.
9. All conduits, wiring, switches or other electrical apparatus installed on an advertising device
must be concealed from general view.
Page 32 of 91
Section 33
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Movement
10. The approved signs must not revolve, move, contain moving parts, change its message,
flash, have a moving or flashing border, or give the impression of movement in any way.
Maintenance
11. The approved signs must be properly maintained by the owner of the property to ensure
the signs continue to comply with the Approved Plans and conditions of this Decision
Notice.
REPORT
1. PROPOSAL
The application seeks approval for a Development Permit for Operational Works to replace an
existing wall (building facia) sign in conjunction with the installation of two additional wall signs at
the existing premises along its Noosa Parade frontage. The signs comprise two new “Sofitel”
internally illuminated signs dimensioned 315mm x 4000mm and 473mm x 6000mm and a new
“Noosa Pacific Resort” internally illuminated sign with a dimension of 380mm x 8000mm. The
proposed signs are show in Figures 1 and 2 below. The proposed additional signage will have a
combined sign face area of 7.13m2 which equates to a total sign face area of 9.71m2 associated
with the Sofitel.
One sign will be fixed to the facia of the existing building and the other fixed to the facia of the
covered vehicle drop off area at the buildings entrance as shown in Figure 3 and 4 below.
Figure 1 – Sign One & Two (illuminated)
Figure 2 – Sign Three (illuminated)
Page 33 of 91
Section 34
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Sign 1
Sign 2 & 3
Figure 3 – Sign Locations
Sign 1
Sign 2 & 3
Figure 4 – Signs Illuminated
Page 34 of 91
Section 35
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
2. SITE DETAILS
2.1. Background
A Development Permit for Operational Works for Advertising Devices (Signage) was approved by
Council on 28 February 2013 (OPW13/0100). The approval granted permission to replace
existing signage throughout multiple tenancies onsite in addition to a new pylon sign to replace 4
smaller pylon signs used as menu boards along Hastings Street and a new under awning sign to
the entry of Catos Bar. Both new signs related to entertainment and dining uses established on
the site.
Signage forming part of the 2003 approval in association with the subject tenancy (Sofitel) related
to the replacement of three existing directional signs along the site’s eastern side boundary as
indicated in Figure 5 below.
Existing
directional
sign
Existing illuminated
directional sign
Existing
directional
sign
Figure 5 – Location of Existing Directional Signage
2.2. Site Description
The subject site has an area of 9,946m2 with a dual frontage of 52m to Noosa Parade and 101m
to Hastings Street. Access arrangements comprise of vehicular access via a service road off
Noosa Parade and pedestrian access from Hastings Street.
The mixed use development includes retail and entertainment and dining uses at ground floor
along Hastings Street with the visitor accommodation component over the balance of the site.
2.3. Surrounding Land Uses
A mixed use development abuts the site to the west which includes a retail use at ground floor
along Hastings Street and the residential component to the rear. Similarly, a mixed use
development adjoins the site to the east which includes an array of retail and entertainment and
dining uses and a public car park accessed via Noosa Parade.
Page 35 of 91
Section 36
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
3. ASSESSMENT
3.1. Statutory Instruments – Planning Scheme
The applicable planning scheme for the application is The Noosa Plan (16 September 2013). The
following sections relate to the provisions of the Planning Scheme.
Advertising Devices Code
In accordance with Probable Solution S7.2 of the Advertising Devices Code, the maximum
permissible illuminated signage is limited to one (1) sign per tenancy. The corresponding Specific
Outcome O7 of the code seeks to ensure an advertising device only incorporates illumination
where it is appropriate to its setting and is compatible with the visual amenity of the surrounding
area. The code further seeks to ensure illuminated signage does not cause environmental
nuisance and does not create glare, reflecting or flaring of colours.
The application seeks approval for an additional three illuminated wall signs which equates to a
total of four illuminated signs relevant to the tenancy (3 x illuminated wall signs & 1 illuminated
pylon way finding sign). Although exceeding the maximum permissible, the number of proposed
illuminated signage is consistent with the scale of the development noting the Sofitel
development is one of the largest in the vicinity. Should the site be redeveloped a far greater
amount of individual tenancies can be created over the site and permitted to have one illuminated
sign per tenancy under the self assessable provisions of the code.
The proposed illuminated signage is appropriate to the setting and the site’s resort use and will
retain the visual amenity of adjoining residential uses and mixed use developments. The
proposed wall signs fixed to the facia of the covered vehicular drop off area will be screened by
existing landscaping within the site in conjunction with mature character figs situated in a
landscaped strip between the Sofitel service road and Noosa Parade. The vegetation will provide
suitable screening to residential development to the east and adjacent the canal to the south.
Refer to Attachment 1.
Similarly, the proposed wall sign to be fixed to the facia of the building will be screened from
residential development to the east as depicted in Attachment 2, however, will be visible to
residents adjacent the canal to the south. Nevertheless, the proposed wall sign will not
significantly adversely impact the amenity of residential uses to the south given these residents
are approximately 150m away and the size of the sign.
4. CONSULTATION
4.1. IDAS Referral Agencies
Not applicable.
4.2. Other Referrals
Not applicable.
4.3. Public Notification
Not applicable.
5. CONCLUSION
Although exceeding the maximum permissible for illuminated signage per tenancy, the proposed
signage does not raise any planning concerns. The signage is justifiable given the scale of the
development. The proposed signage is appropriate to its setting and remains compatible with the
visual amenity of the surrounding area and is well screened from nearby residential uses.
Page 36 of 91
Section 37
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office x Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance x Planning & Environment
Human Resources Strategic Land Use Planning
Sustainability
Page 37 of 91
Section 38
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 1
Figure 1 – North-western view from Noosa Parade
Figure 2 – View from 19 Witta Circuit (Detached Dwelling)
Page 38 of 91
Section 39
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 2
Figure 3 – View from 32 Hastings Street (Residential)
Figure 4 – View from 30 Hastings Street (Residential)
Page 39 of 91
Section 40
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
3 132007.1259.05 - DEVELOPMENT APPLICATION TO CHANGE THE DEVELOPMENT
APPROVAL AND EXTEND THE RELEVANT PERIOD FOR VISITOR
ACCOMMODATION, OFFICE, SHOPS AND RESTAURANTS AT 215A DAVID LOW
WAY, PEREGIAN BEACH
DOCUMENT INFORM AT ION
Author Development Planner, Glen Conforti
Planning & Infrastructure Department
Index ECM / Application / 132007.1259.05
Attachments 1. Approved Plans
APPLICATION DETAILS
Applicant Scanlon Property Group
Proposal Change the development approval and extend the relevant period of
Material Change of Use for visitor accommodation, restaurant, shops
and office
Properly Made Date 13 September 2016
Decision Due Date 16 March 2017
Number of Submissions The original application attracted 2 properly made and 4 not properly
made submissions
PROPERTY DETAILS
Property Address 215A – 219 David Low Way Peregian Beach
RP Description Lots 8 – 10 P 9315 & Lot 76 MCH 2969 (currently Lot 77 SP 231615)
Land Area 23.12ha
Existing Use of Land Shopping complex (IGA and various shops) and vacant land (formerly
Peregian Beach Caravan Park)
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Eastern Beaches
Zone Semi-Attached Housing and Open Space Recreation
Overlays Natural Hazards Overlay – Bushfire hazard
Natural Hazards Overlay – High and Low Potential Acid Sulfate Soils
Assessment Type Extension to Relevant Period
Page 40 of 91
Section 41
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 7 March 2017 in regard to the request to extend the relevant period
and to change Condition 31 of approval No. 132007.1259.05 for a Development Permit for
Material Change of Use – Visitor Accommodation Type 4 Conventional, Entertainment & Dining
Type 1 Food & Beverages, Retail Business Type 2 Shop & Salon, Commercial Type 1 Office
situated at 215A David Low Way, Peregian Beach and
A. Refuse the request to extend the relevant period for the following reasons:
1. The proposed development is inconsistent with The Noosa Plan and given the time
lapsed it is relevant to examine whether there are still grounds in the community’s
interest to justify the conflict with the planning scheme.
2. The community is unlikely to be aware of the development approval given the time
lapsed since the application was lodged in 2007; changes in the area; and the
shopping complex that has been constructed on a significant portion of the site.
3. The application would be likely to attract further properly made submissions were a
further development application lodged and publicly notified today, given:
a. the time lapsed since the application was lodged in 2007;
b. the changes that have occurred in Peregian Beach, including significant urban
growth west of Peregian Beach; and
c. the development cannot proceed in its current approved form and the change is
likely to result in a substantially different development.
4. The approved development in its current form cannot proceed as a shopping complex
has been constructed on a significant portion of the site and has superseded the
development approval. Substantial changes would be required to the development
approval for it to proceed.
B. Advise the applicant that the request to change Condition 31 must be made to the Planning
and Environment Court pursuant to the Sustainable Planning Act 2009.
REPORT
1. PROPOSAL
The applicant seeks a 2 year extension to the relevant period and a 2 year extension to the
sunset provision of the development approval. Condition 31 below outlines the current relevant
period and sunset provision for the development.
31. The Development Permit for a Material Change of Use lapses if the first change of use
has not started by 28 September 2016, and all works associated with the development
have been completed by 4 February 2018.
The applicant seeks Condition 31 to be amended to read as follows:
31. The Development Permit for a Material Change of Use lapses if the first change of use has
not started by 28 September 2016 28 September 2018, and all works associated with the
development have been completed by 4 February 2018 - 4 February 2020.
Under the Sustainable Planning Act 2009, as the development approval was issued by the
Planning and Environment Court, Council is only able to extend the relevant period and the Court
is able to change the condition of approval in respect to the sunset clause. Given this
complication, advice is being sought from Council’s planning solicitor on how to frame Council’s
decision in this regard.
Page 41 of 91
Section 42
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
2. SITE DETAILS
2.1. Background
Material Change of Use
An application (132007.1259) for a Material Change of Use for visitor accommodation,
restaurant, shops and office was originally refused by Council on 21 August 2009 but
subsequently settled on 12 February 2010 through the appeal process. The application attracted
2 properly made and 4 not properly made submissions. The approval was over 4 lots, 3 with
frontage to the David Low Way and a larger lot to the rear of these lots, all accessed from the
then Unnamed Road, which is now Sandpiper Court.
The approved development comprises a commercial building fronting the David Low Way, which
includes 306m² of restaurant, 387m² of retail uses on the ground/podium level and a low cost 58
bed visitor accommodation use to the first floor with parking underneath this building To the rear
of the site and behind the Peregian Beach Hotel, 2 three storey accommodation buildings
consisting of 32 x 3 bedroom units, pool/BBQ area and 30 individual 2, 3 and 4 bedroom “beach
shacks” are approved. The most western portion of the site is conditioned to be dedicated to
council as parkland for environmental purposes.
On 24 January 2012 a permissible change was issued by the Planning and Environment Court
(Appeal No. 4783 of 2011*). The primary changes included:
Staging the development into 3 stages, being:
o Stage 1 – commercial building fronting David Low Way and rehabilitation and
dedication of the parkland to Council.
o Stage 2 – The 2 larger visitor accommodation buildings (32 x 3 bedroom units) to the
rear of the site.
o Stage 3 – 30 Beach Shacks (2, 3 and 4 bedroom individual buildings); and
An updated Stormwater Management Plan to reflect the staging and the current best
practice water management objectives.
As part of this application to change the development approval, the court did not allow the
addition of juliette balconies and additional outdoor dining facilities to the commercial and visitor
accommodation building fronting David Low Way. The court did not agree the juliette balconies
and the outdoor dining areas constituted a permissible change pursuant to Sustainable Planning
Act 2009.
As such a new impact assessable application for a development permit to include juliette
balconies and additional outdoor dining (MCU12/0023) was lodged and subsequently approved
on 26 July 2012. The application attracted 198 properly made and 12 not properly made
submissions. Of the 198 properly made submissions, 81 objected and 117 supported the
proposal. The submitters were primarily concerned with noise generated from the outdoor dining
activities.
On 15 November 2013, Council agreed to extend the relevant period to 28 September 2016 and
extend the sunset provision to 4 February 2018 (Appeal No. 4139 of 2013).
Reconfiguring of a Lot
A Development Permit for Reconfiguring a Lot (152010.627) was approved by Council on 29
October 2010. This approval created the western lot required by the material change of use
approval to be dedicated as parkland for environmental purposes and 2 other lots, being one lot
for the commercial and visitor accommodation uses fronting David Low Way and the other lot for
the majority of the visitor accommodation uses located to the rear of the site.
Page 42 of 91
Section 43
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
This subdivision approval was subsequently changed in order for the IGA and associated shops
(MCU13/0251) to be wholly sited within one lot as the development was straddling the original
approved boundaries. The lots have been sealed by Council but to date the parkland and
commercial lot have not been registered at the titles office. Figure 1 below shows the original
approved plan and the approximate location of the existing commercial development.
Figure 1 – The red line indicates the approximate location of existing IGA and shops. The black
line indicates the original approved lot. Lot 3 is the proposed park for environmental purposes
which is sealed by Council but not registered with the titles office to date.
Figures 2 and 3 show an aerial of the site and the Planning Scheme zones.
Page 43 of 91
Section 44
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Figure 2 – Aerial of the site
Figure 3 – Zone map and aerial of the site.
Page 44 of 91
Section 45
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
3. ASSESSMENT
3.1. Statutory Process
In accordance with Section 388 of the Sustainable Planning Act 2009, in deciding a request to
extend the relevant period, the assessment manager must only have regard to:
(a) the consistency of the approval, including its conditions, with current laws and
policies applying to the development, including, for example, the amount and type of
infrastructure contributions, or infrastructure charges payable under an infrastructure
charges schedule;
(b) the community’s current awareness of the development approval; and
(c) whether, if the request were refused-
(i) further rights to make a submission may be available for a further development
application; and
(ii) the likely extent to which those rights may be exercised; and
(d) the views of any concurrence agency for the approval…
The Planning Scheme’s requirements for the site remain generally the same as when the
application was originally lodged and as such the development remains inconsistent with the
Planning Scheme’s development intent for the site. The site is predominantly zoned Open Space
Recreation, with a portion of the site fronting David Low Way zoned Semi-Attached Housing. For
the area of the site zoned Open Space Recreation, the planning scheme seeks to maintain the
use of the site for the former caravan park and supports visitor accommodation units only where
associated with the caravan park use. Small scale commercial offices and medical offices are
supported for that part of the site zoned Semi-Attached Housing. The planning scheme also
seeks to ensure that buildings fronting David Low Way are of a domestic scale, visually pleasing
and consistent with the character of the area.
The application was originally refused on numerous grounds including but not limited to the
development being excessive for the site in terms of density, height, bulk and scale. The
development was also considered contrary to the Specific and Overall Outcomes of the Eastern
Beaches Locality Code which sought to protect and retain the caravan park for low cost visitor
accommodation needs. The applicant also relied on inadequate or irrelevant planning grounds to
justify the departure from the Planning Scheme.
Through the appeal process the development’s density, height, bulk and scale were reduced and
the development’s general presentation to the street significantly improved. It was also accepted
that the proposed visitor accommodation was a reasonable replacement for the caravan park as
it included low to mid-range cost visitor accommodation facilities. In terms of the commercial
aspect of the proposal, Council’s economic consultant at the time concluded ‘although ‘out of
centre’ the restaurant and retail facilities are appropriate components to the proposal. The visitor
accommodation would generate the demand and support the proposed retail and restaurant
facilities.’ The approved plans for the development are provided as Attachment 1.
A significant amount of time has lapsed since the original application was lodged in 2007 and it is
relevant to consider whether there are sufficient grounds for the development today given its
conflict with the Noosa Plan. Need has not been re-examined since the application was originally
lodged and no supporting documentation for the proposed visitor accommodation uses has been
submitted with this request. It is noted though that the applicant has lodged a further application
over the subject site seeking approval for a development which primarily comprises permanent
residents and significantly scaled back visitor accommodation. Changes in the economic
environment have also occurred in the past 10 years, which may affect need for the proposal.
Page 45 of 91
Section 46
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Significant population growth (approx. 480 dwellings or 1300 population growth, 2006-2011 ABS
data) has also occurred to the west of Peregian Beach, with many of these residents recreating
and utilising facilities in Peregian Beach. Many of these new residents would be unlikely to be
aware of the development and were this application remade today, it is likely further new
submissions would be received from this community and residents of Peregian Beach raising
reasonable objection to the development.
While a marketing sign for the development was erected on site for some time, any awareness of
the development has likely waned as a different and separate development has been approved
and constructed on a portion of the site. An IGA supermarket and speciality shops have been
constructed over approximately a third of the site to the David Low Way frontage, removing the
approved commercial uses and low cost visitor accommodation components. The development
of this shopping complex means the proposed development has been superseded and cannot
proceed without substantial changes to the approval.
Concurrence Agency
The original application was referred to the Department of Environment and Heritage as a
concurrence agency for Unexploded Ordnance (UXO).
4. CONCLUSION
The proposal remains inconsistent with the current Planning Scheme. The applicant has not re-
visited or demonstrated a need still exists for the proposal and given the time that has lapsed, it
is also likely community awareness of the development has diminished. New residents would be
unaware of the development approval and if an identical development application were remade
today new submissions are likely to be lodged with Council.
Furthermore, a new unrelated development is now constructed on a portion of the site (IGA and
associated shops) and as such this development cannot proceed as approved.
The request to extend the relevant period and sunset provision is therefore recommended for
refusal.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office X Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance X Planning & Environment
Human Resources Strategic Land Use Planning
Sustainability
Page 46 of 91
Section 47
ATTACHMENT 1
Page 47 of 91
: singers 5) STAGE 3 ATTACHMENT 1
\ sd
\ O STAGE 2
‘ RESERVE o
STAGE 1|-\ —\- f a
\ W © f . © Il
_ HB be AL
© \ 5@ tee = / abl]
\ ei ) fe i :
‘ << Ss ee y) 2
STAGE 2 \\f . if, hit if :
\ h.\\ } oats) STAGE 1
‘\ NZD z |) jf
‘ er ZV yi ry aor | f/\) x
| | : sees Aer 2
“STAGES SS eee | ;
=e ee
20
Page 47 of 91Section 48
Page 48 of 91
CABINS BUILDING B EXISTING BUILDING . essence
tig os Pe eats — 37 118 $0 of peregan beacr
“Be . Bs 9 oe AT ater . tad = Sis cep ett mannan il ad a —_ = J mM A
#23 apis eT ee eit NES See ao Ee ar aba — ; YAeWITER C8
Bi 1 a ¢ i a? Te ni Pe <= Bessy -s000 ‘ n
os Pie kewl ve e e a. ik: =e a 1 ee Mepeens "YS
if Y : eS Ye > +00) ate a) mms a? : >: Ia roe Tr aa :
y 4 m Ra AP ee amet
: caei sessasts,
— wk
a
CABINS BUILDING B _jeson EXISTING BUILDING Sia ame
wee = ‘ aie lb et ie ‘a pellet = 200 r == oho }
aa Loe E | ap . ae Bo oo a eh ts ete = +000 fl |
AP wee <UL peer, 2 et eee Ree
et joes ee a Le ———
secnona ita
CABINS BUILDING A COMMERCIAL —
ele ‘ a oer. sr? 570. bs : Hell, 1767 hee
epg ees ao hh oe? st ee ee x2 +9000 DAVID LOW WAY DAVID LOW WAY
i: | | enh al ee ee ee be aS jg Sa aanueremana —
TE | eee | =) (ma Oa ee ee Lr ores
; : ea mid Fe 4 se 2 se —— SECTIONS 1-4
pe nce i __ s
CABINS BUILDING A COMMERCIAL a |
ais x 3 " ee 7 +787 SS SSaee— ee y r savin LOW WAY
ote eS coe wee odes... Fe vee
ae i cic MT
Se a 7 Ld. rien ae i css
epee eR re eeiriribae OL | ;
= CoONicSs
SECTION 4 1.250 os |
APPEAL Cc O P|! €E § .
oe Pin
bite
Page 48 of 91Section 49
Page 49 of 91
CSSence
JM _ A
BUI DING B BUILDING A 2
—_ . ma: ms ie ‘ BD a 7 = = ~. +I = oe ¢ Ary ious
- eee Se eo. ee
wv 00x 3 ue Te hf ep ae 3} oy Ee TE -— | aa _ Tio = +78 " 5
ge tt rf. lle | 7 os
= . } siete
BUILDING B ‘ape Yes i BUILDING A CABINS &
2 ea a iy, / Pails sz+7s70 tits ,
ss sat if Th he ., 0 re y ‘ Y el mw. ae eS 53 . 30a iiss e i nl a
anil LL Beit TT} = BLL), Beamer Bs oot TR bee EPR | Lats i an on mcrae ona
} ry POOL AREA | Y peered it a = | ee ee ee Pace
Lu a eee
PEREGIAN
SECTION B wa Trmenen ements aan ae 1 250 SECTIONS A-D
Cy
ae
er
Sd
BUILDING B BUILDING A CABINS ener aes aa]
fei | wo a
ae 2 = bat) 7 a Dh — a zat : nm at ar Zz
7S gettin VTi my FS HT Oe aes LB Ae eee Gs Pe | TT a i | _ ve fi 20517_
i eT a a y (aie amma! MT OTe Lie
a) [ee tet | Peet el (BARE Ry ELE) JEL ETL conics B
SECTION C —— nes _ 12s . :
APPEAL COPIES .
Page 49 of 91Section 50
Page 50 of 91
essence
of peregian beach
—— = Sr re a HT ras : _ SS JM A
: (CARS Pee LS ee TT ae Te <= = te ARCHITECTS
rs SS es Se eee ce rit pe a eH fd a Si
Be ST Ss ae | Pe = pacigsccianan
PO Box 380 Spmngt 400¢ CLD AUST
EAST ELEVATION a ot
SITE PLANS 1:250 caer seuwsntas
pace,
wi a
= - naa as “Sas cl ES. 2 Woh Ser a —— FO: 2 remem SS ee areas
ey] ee aL Tee eel Te Sle EL. ae ee
ru sla | TT teat Ae Lo te i oats Semneteemmesciaione
ira, {la feet ted iene est | leet 1 [isn E Teaiieaee rae ese ™Y mesma
- : ae 5 Sa ma 2 Fi Hy hy) by x - i : .
=n = —— engineers design
WEST ELEVATION
Gi) ences =
(CUIENT
i a i 7 7 7 ESSENCE OF PEREGIAN
i f ep ge fg ga =. a a ee
JRE Eee eee Dy we ae, Be SITE PLANS
eel FE eR ee awa } orev orem re
ut |
NORTH ELEVATION SITE ant
Ga) SITE PLANS 1:280 a
a
[ews oa
ood
=
; 4. sae ——
7" ce ee ME, «= |
f (aes ae i i pauls. Lit a Ls | =a i eee ‘ a Tie cg — EA Lei —-
wii (ee eet El OPE eo. a conics F
pees ene ie) es. MET co
ACN O10370808
ABN @:S0°008Se0
SOUTH ELEVATION
TELEPHONE 07 3237 6888
SITE PLANS 1:250 cm eanpnnsi
(500 wweconiecs com mu
APPEAL Cc O PIE § Sa
Page 50 of 91Section 51
Page 51 of 91
essence
of peregian beach
JM A
Se eal Ee bre
Level * 36 Wyercre Si Newsesc Gic 4006
Ciuesernion Ine G@ine-aren con
z = (€) COPYRIGHT
Ee | Se fe <——
| Sz STEVES peer Lal Ee FE =
= Seamort a aoe Fb) int Ini Pa a te repsvonsr eco
ett ‘ssa i HE fg 1 a in ; = — e ge Pe aan la al | BEE = E =
[aie ET] ee sagem ti eet || ell beet as
ml Gia = = Sy Weeks BICSkeo sec woeo Heli |||) ap ot eh scene cok env oreenettte
af ean a ll eet tt a = = svmsnigerean
Biss “ BBQ i Jax rot. The boundaries shown on this plan
Pe ee Le ee aa
a Soa
: | | at i “ ee
CLIENT
SCANLON PROPERTY GROUP —
PROJECT |
ESSENCE OF PEREGIAN
DAVID LOW WAY
PEREGIAN
SS _———_= TOURIST
== == ACCOMMODATION
——s oales = = | = TYPICAL ELEVATIONS
yy |) Coe 254 —
== “= | _ oe =
i Laem Autronty — SUNErE COAST ALCON, CONDE
i Teo hewerce 20617
fo “* AS SHOWN
Plan Reterence:
Fa uid 20517_A-12
CONICS B
e2 Tpit Elevation 0100 Sie"
roeon ean
APPEAL c O P|leE#S§$ Ss
Page 51 of 91Section 52
Page 52 of 91
A
essence
of peregian beach
ARCHITECTS
QUEENSLAND PIY LTO
Level 1 36 Wyercre S. Mewsieas Qe 4006
PO Box380 SpangHt 400¢ QLD AUST
RON nor sz ag ae es"
TEL 07 32524400 FAX OF 3282 2917
ir (©) COPYRIGHT
on :
~ Me Covmeont MERER ARE THE PROPENTY CF
(dA ARCHITECTS GLO PTY LID
in a tld i tlle EJ) =P i = 1ST Be |r rms necaee
NNO MUST MOT BE USED, COPED OR REPROOUCED
Ci) =P ia Ce ee oI pee a ees K | itiimaaaratia
J | === == mapean Sah Fy es | eaves
=< Sas a= = Ls ge ee =a
—T]| ip ee Sore > | ‘ waa | ] ‘ eS
: . 4 = 3 " , ——— Set Ss == t ise -
t —— .—_— 5 — —== = + Zs The boundanes shown on thes plan
ye i should not be used for final detatied
S a E a LT Cre. engineers desig
p> SI a
; Typical Section 1:100
CLIENT
PROJECT
ESSENCE OF PEREGIAN
DAVID LOW WAY
PEREGIAN
TOURIST
ACCOMMODATION
ea tears Lak Senge na TYPICAL SECTIONS
5 Es mr om
— | | | > — E = = < | ) ! | ae = —
} { —— —= ——a + Surveyec
Come ty Cea
_ | =| : sees = = Loca! Aaatmerty —__
t Soe
| AS SHOWN
heat a ‘ “pe Piar Releronce
r= CB Ts et J a eae 20517_A-13
conics B
CONICS (BRISBANE) PTY LTD
Ss
M3 ANN STREET
2 Typical Section tt00 somes eurv ane
— at femnuue ea
SS
APPEAL COPIES rams
Page 52 of 91Section 53
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
4 OPW16/0016 - PLANNING & ENVIRONMENT COURT APPEAL 281/2017 REFUSAL OF
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS - PRESCRIBED TIDAL
WORKS SITUATED AT 2 PARKYN COURT, TEWANTIN
DOCUMENT INFORM AT ION
Author Coordinator Engineering, Mark Lewis
Planning & Infrastructure Department
Index ECM/ Application/ OPW16/0016
Attachments Nil
APPLICATION DETAILS
Applicant Quadrant Holdings Pty Ltd C/- Project Urban
Proposal Operational Works – Prescribed Tidal Works (Deck)
Properly Made Date 18 May 2016
Information Request Date 3 June 2016
Information Response Date 27 July 2016
Decision Due Date 19 September 2016
Number of Submissions Not applicable
PROPERTY DETAILS
Property Address 2 Parkyn Court, Tewantin
RP Description Lots 388 & 400 MCH 839039, Lot 178 MCH 5169
Land Area 1.451 Ha
Existing Use of Land Noosa Marina
STATUTORY DETAILS
SEQRP Designation N/A
Locality Tewantin
Zone Open Space Recreation
Overlays Acid Sulfate Soils, Flood Hazard
Assessment Type Code
RECOMMENDATION
That Council note the report by the Coordinator Engineering to the Planning & Environment
Committee Meeting dated 7 March 2017 regarding Planning and Environment Court Appeal
281/2017 and agree to defend the appeal.
Page 53 of 91
Section 54
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
REPORT
A report on this application to construct a deck on the northern side of the Noosa Marina was
presented to the Planning & Environment Committee meeting on 6 September 2016 and
subsequently deferred at the Ordinary Meeting to allow staff to hold further discussions with the
applicant on their future plans for the facility. Council staff subsequently met with the applicant
wherein additional information was provided by the applicant. This additional information was
presented to Council’s Planning & Environment Committee on 6 December 2016 wherein staff
advised that the construction of the deck was not well considered as the deck was a substantial
structure and had the potential to provide for expansion of the commercial uses on the site,
without giving due consideration to the impacts of the structure and expanded uses.
Council at its Ordinary Meeting on 15 December 2016 subsequently resolved to refuse the
Operational Works application for the following reasons:
1. The proposed deck does not comply with Overall Outcome and Specific Outcomes of the
Noosa Plan’s Watercourses Works Code and Tewantin and Doonan Locality Code.
2. The proposed deck is contrary to the “Purpose of Code” of the IDAS Code of the Coastal
Protection and Management Regulation 2003 and does not comply with Specific Outcomes
of the IDAS Code of the Coastal Protection and Regulation 2003.
3. The proposed development will create the potential to intensify the commercial uses by
increasing the available deck areas within the marina.
4. The proposed deck adds a substantial area and additional built form on the Noosa River, is
likely to increase traffic volumes on adjoining lands and there are insufficient parking
facilities available in the area
As a result of Council’s decision to refuse the application, the applicant has now lodged an
appeal with the Planning & Environment Court maintaining that the proposed deck meets
provisions of The Noosa Plan and the IDAS Code of the Coastal Protection and Management
Regulation 2003. The applicant seeks that the Planning & Environment Court approve the
application subject to reasonable and relevant conditions.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.
Previous Council Consideration
Ordinary Meeting, 15 December 2016, Item 2, Page 8
That Council note the report by the Coordinator Engineering to the Planning & Environment
Committee Meeting dated 6 December 2016 regarding application OPW16/0016 for a
Development Permit for Operational Works – Prescribed Tidal Works (Deck) at 2 Parkyn Court,
Tewantin and refuse the application for the following reasons:
1. The proposed deck does not comply with Overall Outcome and Specific Outcomes of the
Noosa Plan’s Watercourses Works Code and Tewantin and Doonan Locality Code,
2. The proposed deck is contrary to the “Purpose of Code” of the IDAS Code of the Coastal
Protection and Management Regulation 2003 and does not comply with Specific Outcomes
of the IDAS Code of the Coastal Protection and Regulation 2003,
3. The proposed development will create the potential to intensify the commercial uses by
increasing the available deck areas within the marina,
4. The proposed deck adds a substantial area and additional built form on the Noosa River, is
likely to increase traffic volumes on adjoining lands and there are insufficient parking
facilities available in the area.
Page 54 of 91
Section 55
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Finance & Risk
Should the matter proceed to trial there will be costs in defending the appeal.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes Solicitor
Internal Consultation
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office X Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Disaster Management
Governance Infrastructure Planning & Design
Human Resources X Planning & Environment
Sustainability Strategic Land Use Planning
Page 55 of 91
Section 56
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
5 REC16/0015 PLANNING & ENVIRONMENT COURT APPEAL 123/2017 FOR A
DEVELOPMENT APPLICATION FOR A RECONFIGURING A LOT (1 LOT INTO 2 LOTS
& ACCESS EASEMENT) SITUATED AT 2 DAVID LOW WAY, CASTAWAYS BEACH
Author Development Planner, Wilhelm Koschade
Planning & Infrastructure Department
Index ECM / Applications / REC16/0015 & Case / 123/2017
Attachments 1. Proposed Subdivision Layout
2. Negotiated Subdivision Layout
APPLICATION DETAILS
Applicant Nicholls Building Pty Ltd
Proposal Reconfiguring of a Lot (1 Lot into 2 Lots & Access Easement)
Number of Submissions Not Applicable
Appeal Filed 16 January 2017
PROPERTY DETAILS
Property Address 2 David Low Way, Castaways Beach
RP Description Lot 706 P 93127
Land Area 9,677m²
Existing Use of Land Duplex
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Eastern Beaches Locality
Zone Detached Housing Zone
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 7 March 2017 regarding Planning & Environment Court Appeal
123/2017 and agree to defend the appeal.
REPORT
A report on a development application for a Reconfiguration of a Lot (1 Lot into 2 Lots & Access
Easement), situated at 2 David Low Way, Castaways Beach was considered by Council’s
Planning & Environment Committee on 6 September 2016 (Agenda Item 2, Page 36). At its
Ordinary Meeting on 15 September 2016, Council resolved to issue a Preliminary Approval for a
Reconfiguration of a Lot (1 Lot into 2 Lots & Access Easement).
Page 56 of 91
Section 57
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
The following reasons were identified for the issue of a Preliminary Approval in lieu of a
Development Permit:
1. A Bushfire Management Plan (BMP) was not submitted as part of the supporting material
for the development application. The BMP was required to address Medium Bushfire
Hazard that affects the northern and southern portions of the site in conjunction with
analysis of minimum vegetation setbacks to a proposed covenant and default building
envelopes.
2. An effluent disposal report was not submitted as part of the development application. The
effluent report was required in order to identify the capacity of existing onsite systems and
whether each system (including trench areas) are wholly located within each proposed lot
they intend to serve.
The applicant submitted representations on 27 September 2016 and provided a BMP and
effluent disposal report both of which are discussed below in more detail:
Bushfire Management Plan
The submitted BMP broadly addressed Council’s concerns regarding fire hazard and
management over the site. However, the BMP recommended minimum vegetation setbacks of
12m to any building area on proposed Lots 1 and 10m to proposed Lot 2.
As depicted in Attachment 1, an amended proposal plan was provided incorporating the
recommendations of the BMP which also included a 747m2 indicative building envelope to
proposed Lot 1 and a 648m2 envelope to proposed Lot 2. The recommended minimum
vegetation setback was also provided to the perimeter of each building envelope resulting in a
significant reduction to the proposed covenant.
Following negotiations with the applicant and various amendments to the proposal plans
comprising namely reductions to indicative building areas and enlargement of the proposed
covenant, agreement was reached and a Development Permit for a Reconfiguration of a Lot (1
Lot into 2 Lots & Access Easement) was issued on 6 December 2016. The negotiated
subdivision layout is provided in Attachment 2.
Effluent Disposal Report
The submitted effluent report confirmed existing systems onsite are substandard and do not meet
minimum industry standards. The matter was referred to Council’s Building and Plumbing Section
for investigation.
The effluent report confirmed existing systems onsite are wholly within each proposed lot they
intend to serve, with the disposal area located outside the agreed covenant area.
Following issue of a Negotiated Decision Notice for a Development Permit for a Reconfiguration
of a Lot (1 Lot into 2 Lots & Access Easement), an appeal was lodged with the Planning and
Environment Court on 16 January 2017 by the applicant. The appeal seeks a reduction to the
approved covenant area over both proposed lots as shown on the approved plans submitted by
the applicant.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.
Previous Council Consideration
Ordinary Meeting, 15 September 2016, Item 2, Page 6
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 6 September 2016 regarding Application No. REC16/0015 for a
Development Permit for Reconfiguring a Lot (1 lot into 2 lots and Access Easement) situated at 2
David Low Way, Castaways Beach and issue a Preliminary Approval in accordance with the
conditions contained in the Planning & Environment Committee Agenda dated 6 September
2016.
Page 57 of 91
Section 58
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Finance & Risk
There will be costs for Council involved in defending the appeal and it is premature to advise on
the appeal prospects at this stage.
Consultation
External Consultation – Community & Stakeholders
Nil.
Internal Consultation
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office X Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Infrastructure Planning & Design
Governance X Planning & Environment
Human Resources Strategic Land Use Planning
Sustainability
Page 58 of 91
Section 59
ATTACHMENT 1
Figure 1 - Proposed Subdivision Layout
Page 59 of 91
rer 7
{> Pe; Orr :
§ a : H
« , r +
as 5 bh a
‘ ”
: ‘ a ¥
7 ” ' : wo rs
a Boa ed ,
, r .
, : = 7
yy a a pe , —~ 2 a
" m7 ie . a Poa —— ae rs
es * - : a
ae [\ ae —— a = ae em —
4 5K TP = a
ff , ” da <— > “we a ‘ — *
a yx lie 5 a — r
A ’ a on — - a ‘ , a"
2 f re ce ie
y, - 7 a an aa , “ ee
~ a
sd Ye aA a?" : NOTES
“eg & Te ol Pes
» Pr Fa “ # (1) This plan was prepared for the purpose and exclusive use of KENLYNN PTY LTD
a . ba we Pars co ONS to accompany an application to NOOSA SHIRE COUNCIL for a Developmen:
aie a ee 2 7 -": Permit to Reconfigure the land described in the plan and is not to be used for any
si — ae 4 : ° wait eal a , aa other purpose or by any other person or corporation.
2 Z - &, ~S JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for any loss or
7 , . f damage suffered howsoever arising to any person or corporation who may use or
(ro a” a" _ ¢ rely on this plan in contravention to the terms of this clause or clauses 2,3, 4,5
- - — a ‘ or 6 hereof.
= < ares j s < =" ~ = ~ = e (2) The contours on this plan are approximate and are suitable only for the
: ’ : r ~ purpose of this application. The accuracy of the contours has not been verified
L L ~ wil 2 + and no reliance should be placed upon such contours for any purpose other than
- ~ for the purpose of this application.
. 7 ‘ é ;
a> ic ) . : . (3) The dimensions, areas, size and location o* improvements, flood information
oN , - wero ad os mora ‘ (if shown) and number of lots shown on this plan are approximate only and may
na vary.
hs A ey LEGEND
\ _ 5 : =, (4) The positions of vegetation shown on this plan has been interpreted f-am
os aerial photography and are approximate only. au
- : SUBJECT SITE PROPERTY DESCRIPTION a
PROPOSED LOTS 1 & 2 ae
The Urban Design for the layout proposal has been developed to meet the stated
i VEGETATION COVENANT CANCELLING project brief, as expressed in JFF' Urban Consultants Offer for the wor! ‘the
i Design Standards stipulated by the Local Authority named on this pai +
LOT 71 ON MCH2854 : : g e :
Non-standard design solutions adopted in the preparation of the layout are listed
PARISH OF WEYBA as follows;
COUNTY OF MARCH + None -
TOTAL AREA 9677m (Deed) (6) This plan may not be reproduced unless these notes are included.
2
Figure 1 - Proposed Subdivision Layout
Page 59 of 91Section 60
ATTACHMENT 2
Figure 2 - Negotiated Subdivision Layout
Page 60 of 91
& OR gl
~ 2p}
: -
A ;
. |
4 s .
3 be
ad
“A ; , J
Pd pi : anys = =a as
¥ ‘Time | , = = =
Oe we - : Pe — : .
ee Y ip pe = ’ a
” ss 59402 =) es
ug 1 ¢ Riss a
“=, ve 2 oy _ 2 a
o ) : - y - .
r~G -— a - sei v4 > "
<2 » , on = os ;
% < od ae —s
> 4 ha NOTES
aaa r al a (1) This plan was prepared for the purpose and exclusive use of KENLYNN PTY LTD
ee . g Pg $ a P to accompany an application to NOOSA SHIRE COUNCIL for a Development
a s : em, iy? re Permit to Reconfigure the land described in the plan and is not to be used for any
P at ss - * other purpose or by any other person or corporation.
- & > JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for any loss or
. , damage suffered howsoever arising to any person or corporation who may use or
ro a ny _ rely on this plan in contravention to the terms of this clause or clauses 2, 3, 4,5
: = sal 4 or 6 hereof.
te w 5 ras i a ee es = ee {2) The contours on this plan are approximate and are suitable only for the
al a — purpose of this application. The accuracy of the contours has not been verified
N and no reliance should be placed upon such contours for any purpose other than
, . . :" for the purpose of this application.
~~ af - {3) The dimensions, areas, size and location of improvements, flood information
re , - {if shown} and number of lots shown on this plan are approximate only and may
a “ay:
; i ¥ 7 LEG EN D (4) The positions of vegetation shown on this plan has been interpreted from
y aerial photography and are approximate only.
SUBJECT SITE PROPERTY DESCRIPTION ea
PROPOSED LOTS 1 & 2 B) steer io Date
ign for the layout proposal has been developed to meet the stated
eo VEGETATION COVENANT CANCELLING project brief, as expressed in JFP Urban Consultants Offer for the works, and the
be, >t LOT 71 ON MCH2854 Design Standards stipulated by the Local Authority named on this plan.
Non-standard design solutions adopted in the preparation of the layout are listed
INDICATIVE BUILDING ENVELOPE PARISH OF WEYEA 3s follows;
COUNTY OF MARCH —
TOTAL AREA 9677m? (Deed) (6) This plan may not be reproduced unless these notes are included.
Figure 2 - Negotiated Subdivision Layout
Page 60 of 91Section 61
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
REPORTS FOR NOTING BY THE COMMITTEE
6 WALLACE PARK FLYING FOX MANAGEMENT STRATEGIES
DOCUMENT INFORM AT ION
Author Flying Fox Management Officer, Tyron de Kauwe
Planning & Infrastructure Department
Index ECM/ Subject/ Fauna
Attachments 1. Community Feedback Survey
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Flying Fox Management Officer to the Planning &
Environment Committee Meeting dated 7 March 2017 providing an update on the implementation
of the Wallace Park Flying Fox Management Plan and the costs to continue to implement the
Plan which will be considered during the 2017/18 budget process.
REPORT
1. BACKGROUND
The Grey-headed Flying-fox (Pteropus poliocephalus) is listed as vulnerable under the
Commonwealth Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act), and
recognised to have a declining population across its range. According to the EPBC Act Policy
Statement, camps are considered nationally important if they have contained ≥ 10,000 grey-
headed flying-foxes in more than one year in the last 10 years, or have been occupied by more
than 2,500 grey-headed flying-foxes permanently or seasonally every year for the last 10 years.
Since the beginning of the year, the Flying Fox Management Officer has identified between 305
and 1865 grey-headed flying-foxes routinely roosting in Wallace Park.
Due to the high conflict between flying-foxes and residents adjacent to Wallace Park, Noosa
Council engaged Ecosure to develop a Management Options Report and a Flying Fox
Management Plan. Based on recommendations from these reports and experience of other
management programs, Council implemented four main strategies:
1. Creation of a vegetative buffer through habitat clearing around the perimeter of the
Western and Southern sides of Wallace Park.
2. Installation and trial of a sprinkler deterrent system. Eight sprinklers were installed in the
canopy along a trial area on the Western perimeter to disturb and deter roosting flying-
foxes a further 15-20 metres and extend the size of the buffer zone.
3. Provision of a subsidised services initiative to provide residents within the high conflict area
vehicle and clothesline covers, automatic air fresheners, two free professional solar panel
cleans and free loaning of high pressure water cleaners.
4. Employment of a Flying Fox Management Officer to liaise with residents and implement
strategies 2 and 3
Page 61 of 91
Section 62
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
2. VEGETATIVE BUFFER ZONE
Vegetation was cleared for 10-15 metres between the rear of residential properties and the
commencement of the roosting habitat to shift the presence of flying-foxes away from the trees
overhanging properties. The area along the Western boundary was selected as it has the highest
level of conflict, with flying-foxes consistently utilising the south-western corner of the park in hot
weather due to the increased shade, and also due to pre-existing stormwater infrastructure
occurring in this area. Therefore, should any future maintenance be required, works will not
disturb habitat.
In some sections of the buffer zone, patches of vegetation were retained along the rear of
properties to provide a visual barrier for residents, to avoid direct vision of the flying foxes. At
these points the buffer size is at least 10 metres
3. SPRINKLER DETERRENT SYSTEM
A trial sprinkler deterrent system was installed along the south-western perimeter to disturb and
deter roosting flying-foxes in the area they most frequently utilise. Eight sprinklers were installed
in the canopy along 129 metres on the perimeter of Trial section 2, shown in Figure 1. The
sprinklers were timed to activate for 30 seconds at 8:00am every Monday, Wednesday, Friday
and Saturday for the first week to determine efficacy. This timing is within the guidelines of the
Department of Environment and Heritage Protection (DEHP) Code of Practice for the Flying-fox
roost management permit.
The initial trial was performed with two members of Flying Fox Rescue and Release to oversee
the impact of the sprinkler system on the wellbeing of the flying-foxes. Upon commencement of
sprinkler use, flying-foxes within the buffer zone responded by flying up and moving 20-25 metres
away from the sprinkler before quickly settling again. Most moved directly parallel to the spray
arc, while some moved 5-10 metres further north, only to shift parallel when the next sprinkler in
the sequence activated.
The timing of the sprinkler sequence has subsequently been manipulated after consultation with
several bat carers as to the optimal times to reduce potential for accidental dispersal and risk of
heat stress. A start time of 7:30am was considered optimal as this allows appropriate time for the
flying-foxes to settle within the roost and ensure only those within the spray arc are disturbed and
the entire colony is not dispersed. Similarly, this ensured that all noise from disturbances would
not affect residents too early in the morning.
As yet, there has been no habituation to the sprinkler deterrent system and it remains an
effective management technique. Should it occur, the sequence and timing of activation will be
manipulated.
The south western area of Wallace Park (the area adjacent to section 1 on the map) has been
the most highly utilised area within the park and extends across into the hospital grounds. The
densest understorey exists within this area and the flying-foxes have primarily occupied these
areas as their maternity camps and for cooling throughout the hottest months. Based on the
proximity of this area to both the largest congregation of flying-foxes and also the hospital
grounds, an extension of the SDS should be carefully implemented and continually monitored.
Page 62 of 91
Section 63
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Figure 1. Map of trial section and proposed expansion zones for the sprinkler deterrent system- Section 2 is
the current trial area and section 1 is the proposed expansion
Therefore, it is recommended that the system be expanded into this section, as per the Ecosure
Management Options Report and Management Plan, to alleviate conflict to those on the
Southern boundary. Furthermore, it is vital that continual monitoring is implemented to determine
the effectiveness of the SDS on this area, as well as meeting DEHP reporting requirements.
Installation of 6-8 sprinklers along the southern boundary will cost $8,500.
4. SUBSIDISED SERVICES INITIATIVE
In 2015/2016, Eurobodella Shire Council implemented a subsidised services program for 740
eligible properties, offering covers for cars, caravans, boats and clotheslines, removal of exotic
Cocos Palms, air fresheners for houses and cars, doormats for local businesses and free access
to high pressure water cleaners. Out of the 740 eligible properties, currently under 200 properties
have subscribed to the services. The Natural Resource Manager has reported a large increase in
community tolerance for the flying-fox colony.
Due to the success of the Eurobodella model in mitigating conflict issues, a public engagement
program was undertaken on 16 October 2016. A survey was performed to determine the interest
of affected residents in proposed subsidised services and gain feedback on their main issues, if
any, with flying-foxes in the highest conflict areas around Wallace Park.
From these consultations, Council offered a subsidised services initiative that provided automatic
home air fresheners, car exterior covers, clothesline covers, professional solar panel cleaning
and free access to high pressure water cleaners, to 55 residences within the high conflict area.
Page 63 of 91
Section 64
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
The program was commenced when flying-foxes consistently inhabited the south-western portion
to pre-empt the time LRFF historically arrive. At time of writing, 25 out of the 55 residences have
subscribed to at least one of the services provided (43.6%) (Figure 2). Table 1 shows that the
total costs of services provided was $6,218, with an average of $248.72 worth of services
provided to each subscriber.
Subsidised Service No of Current Cost 2016/17 Budget Notes
Subscribers excl. GST
Automatic Home 15 $322.62 $600.00 Dispensers and continuous
Air Fresheners refills were provided to
residents. Subscriptions were
triple that of the number of
residences that indicated
interest in the initial
consultation.
Car Exterior 14 $1,527.64 $2,000.00 Covers were provided for any
Covers car requested.
Clothesline Covers 16 $2,540.34 $3,400.00
High Pressure $1,170.00 $2,000.0 Three cleaners were purchased
Water Cleaners and stored at Council, to be
loaned out by eligible residents.
Initial budget for four cleaners.
Professional Solar 8 $657.00 $2,000.00 Two free solar panel cleans
Panel Cleaning were offered to every property.
The contractor also provided
the client with a service report
on the efficacy of their system.
Initial budget was for annual
cleaning. Only 1 clean each
delivered thus far.
Total $6,217.60 $10,000.00
Table 1. Subsidised services cost comparison actual cost versus consultation based budget
Page 64 of 91
Section 65
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Figure 2. Properties eligible for the subsidised services initiative and current subscribers
Green - Subscribed & Yellow – Eligible
Based on residents’ feedback it is recommended that the program be continued in 2017/18. In
addition, residents have also requested that Council consider funding other items that have been
damaged, such as replacing an awning or gazebo and professional roof cleaning. Not all
residents have requested these items, but given the impact from droppings, it is considered
reasonable that a subsidy of $100 for discretionary items be considered. The budget required to
continue the current program (with the inclusion of the new discretionary subsidy) is shown in
Table 2. No more pressure cleaners (HPWC) or covers are required for those already
subscribed, as the longevity of these products has been guaranteed for the duration of the next
financial year. Continued offering of air freshener refills and solar panel cleaning have been
budgeted based on the same uptake as the trial period. Maintenance budget is estimated for any
possible incidental costs for the HPWC.
Page 65 of 91
Section 66
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Subsidised Service 2017/18 Budget Notes
Current Area
Automatic Home Air $500.00 Four refills for every household subscribed.
Fresheners Initially provided with 3 canisters that should
last 6-8 months. Based on reuptake by the
same subscribers
Car Exterior Covers Nil Still within manufacturer warranty and
should not require another for continuation.
Clothesline Cover Nil Still within manufacturer warranty and
should not require another for continuation.
High Pressure Water Cleaners $1,000.00 No further purchases- Discretionary money
for any maintenance required
Professional Solar Panel $1,500.00 Two free solar panel cleans offered to every
Cleaning property. Based on reuptake by the same
subscribers
Discretionary Costs $5,500.00 Introduction of customer request to the value
of $100. Cost of every eligible household
subscribing
Total $8,500.00
Table 2 - Cost estimate of continued services in initial area
Due to the success of this program, it is recommended that the boundary of the subsidy area be
extended to include 30 further properties, as shown in figure 3, and offer the same services to the
initial residences. This would increase the range of the program from 75 metres to 91-185 metres
from the boundary of the habitat and is based on further feedback from residents. These
properties were selected as they are situated adjacent to the areas where the majority of the
flying-foxes inhabit in the south and where they primarily fly out in the north. Furthermore, the
remainder of the properties within each of the gated communities to the north were included to
ensure the entirety of the estate had access to the program. Based on current subscription rates,
it is predicted that a further 13 properties will subscribe from the expanded area. Table 3 details
the budget required for the expansion area.
Subsidised Service 2017/18 Budget Notes
Expansion Area
Automatic Home Air $350.00 Dispenser and three refills
Fresheners
Car Exterior Covers $850.00 Based on 2016/17 subscription rates.
Clothesline Cover $1,100.00 Based on 2016/17 subscription rates.
High Pressure Water Cleaners Nil No further purchases required.
Professional Solar Panel $700.00 Two free solar panel cleans offered to every
Cleaning property. Based on 2016/17 subscription
rates
Discretionary Costs $3,000.00 Introduction of customer request to the value
of $100. Cost of every eligible household
subscribing
Total $6,000.00
Table 3 - Budget for subsidy program for expanded area
Page 66 of 91
Section 67
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Figure 3 – Proposed Expansion area of the Subsidised Service Initiative
5. PUBLIC ENGAGEMENT
On 20 February 2017, the Flying Fox Management Officer performed a face-to-face interview
with individual residents to provide feedback. Twenty residences provided feedback on the day
and those not home were provided with forms to return to Council. Public consultation was
undertaken to determine residents’ satisfaction with the management techniques utilised, their
tolerance of the flying foxes and whether their overall amenity was improved.
Many residents were still concerned with the issues related to flying fox fly-out over their
properties. It is hoped that addition of further properties in the subsidised service initiative and
inclusion of a broader range of services will sufficiently mitigate this issue, as the flight path itself
cannot be altered through any current/known management techniques.
Residents on the southern boundary responded that their amenity had not been greatly improved
as flying foxes still inhabited areas close to the rear of their property. As such, they showed great
interest in the SDS being extended into their section.
Residents indicated the impact on their amenity from the flying foxes in the past was 7.72 out of
10, with 10 being extreme impact (Figure 4). In contrast, current impact was noted as 2.84 out of
10. This rapid decline since October 2016 was largely attributed to Council’s increased
management in the area, with appreciation that lower abundance of flying foxes also contributed.
Page 67 of 91
Section 68
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Similarly, residents identified that their level of satisfaction with Council’s management of the
conflict was 2.37 out of 10. Since greater focus was provided since October 2016, this
satisfaction rating has risen to 7.03 out of 10 at present. Furthermore, the provision of the
subsidised services program was given a rating of 7.58 out of 10 for resident satisfaction.
Residents were also asked to comment on whether the appointment of a Flying Fox
Management Officer responsible for managing the conflict and be a point-of-contact was
beneficial. Of the twenty respondents, 95% of respondents claimed that this had provided a
positive change, with 70% strongly agreeing with the statement and only one person claiming it
made no change.
When asked whether they were satisfied with the current level of communication with Council
about flying-foxes, 90% of respondents agreed with the statement, with 35% of all respondents
strongly agreeing.
Many respondents also provided feedback suggesting that greater vegetative manipulation was
required to reduce canopy connectivity or understorey density to discourage roosting in some
areas. It is recommended that further investigation should be undertaken into the impacts of
understorey management on flying-fox distribution, should the SDS not appropriately alleviate the
concerns of nearby residents.
Resident Feedback
9.00
8.00
7.00
6.00
Rating Given
5.00
4.00
3.00
2.00
1.00
0.00
Previous impact of FF Current impact of FF Previous level of Current level of Level of satisfaction w
on lifestyle on lifestyle satisfaction w Council satisfaction w Council subsidy program
mgmt mgmt
Question Type
Figure 4- Feedback from residents on current and previous satisfaction with flying fox management
6. MANAGEMENT COSTS
The Flying-Fox Management Officer's role is to implement the key recommendations of the
Ecosure Management Options Report. These are to trial a sprinkler system to 'nudge' the flying-
foxes away from residential areas and deliver a subsidy program to mitigate the impacts of
Flying-foxes for neighbours (droppings and smell).
Page 68 of 91
Section 69
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Although in early stages of the trial, the sprinkler system appears to be successful and it is
appropriate to expand the sprinkler system across other residential boundaries as per the
Ecosure Management Options Report. The subsidy program also has had a positive uptake by
neighbours and has improved relations between Council and residents. Subsidies include
cleaning of solar panels, free use of water pressure cleaners, air fresheners, car covers and
clothes line covers
Based on the ongoing need for monitoring and management of the aforementioned strategies
and community feedback, it is recommended that the Flying-Fox Management Officer's position
be continued for another 6 months to 4 October 2017. This will support the delivery of the
sprinkler system and continue to provide subsidies for residents.
In addition, the Flying-Fox Management Officer would be expected to:
respond to customer requests and complaints;
draft media releases
monitor the location, numbers and behaviour of Flying-foxes, particularly in high conflict
sites such as Wallace Park
work with fauna care volunteers to deal with sick, injured orphaned and dead bats
participate in the sprinkler system trial and monitor its effectiveness as guided by the
Flying-fox management plan and permit
work with Environment Health Officers with the aerial mosquito treatment program around
Goat Island to ensure that bats are not dispersed to residential areas
participate in educational events such as National Bat Night
design interpretive material such as fact sheets, signs and displays.
If time permits the Flying Fox Management Officer could also assist with responses to other
wildlife matters such as bird attacks (magpies and pee-wees), marine animal strandings (turtles,
whales, dolphins), reptile issues in public areas (snakes) and wildlife mass mortality events
(sooty shearwaters, bats and heat stress events) and implementation of Koala Conservation Plan
actions
Costs for Level 5 position:
To end of financial year 16/17: $23,299 (to be considered in Budget Review 3)
Next financial year 17/18: $23,299 (to be considered in 2017/18 budget process)
Total: $46,598
Previous Council Consideration
Ordinary Meeting, 17 November 2016, Item 5, Page 6
That Council note the report by the Flying Fox Management Officer to the Planning &
Environment Committee Meeting dated 8 November, 2016 and implement a Subsidised Services
Initiative to provide covers for cars and clotheslines, automatic air fresheners, professional
cleaning of solar panels and access to high pressure water cleaners at a total cost of $10,000
based on predicted subscription.
Page 69 of 91
Section 70
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Ordinary Meeting, 19 November 2015, Item 8, Page 17
That Council note the report by the Principal Environment Officer to the General Committee
Meeting dated 16 November 2015 and:
A. Thank the submitters for their comments on the Ecosure flying fox management options
report;
B. Agree to implement the flying fox management actions as detailed in the report, including
funding of $23,500 for buffer creation in priority management areas as well as interpretive
signage (with funding to be sourced at the next quarterly budget review);
C. Review the effectiveness of flying fox deterrent and camp re-establishment trials currently
being undertaken by other Councils and research organisations and provide a future report
to Council; and
D. Continue to monitor the flying foxes and provide educational material for residents and
visitors.
Finance & Risk
If Council resolved to proceed with the continuation of the current Subsidised Services Initiative
and inclusion of a case by case provision, operational funding of $8,500 would need to be
considered in the next budget for ongoing storage, supervision and provision of the subsidised
services to residents. A new initiative request has been submitted for consideration in the
2017/18 budget process.
If the recommended extension of the program is undertaken, operational funding of $6,000 would
need to be considered in the next budget. This is based on current subscription rates and costs
during the trial period. A new initiative request has been submitted for consideration in the
2017/18 budget process.
To deliver the Subsidised Services Initiative and continue with the extension to the sprinkler
system the current Flying-fox Management Officer position will need to be extended to 4 October
2017 at a cost of $46,598. The additional $23,299 required to the end of 2016/17 is to be
considering during Budget Review 3. The remaining $23,299 required in the 2017/18 financial
year will be considered during the budget process.
There is a risk that if LRFF return in large numbers again, the services offered may not be
sufficient to address residents’ concerns and improve their tolerance, and further services may
need to be explored through continued public engagement.
The flying-foxes may independently vacate the Wallace Park camp at some time and/or relocate
to another urban or rural camp.
Service Cost
Continuation of Subsidised Services Program $8,500.00
Expansion of Subsidised Services Program $6,000.00
Extension of Sprinkler System $8,500.00
Extension of Flying Fox Management Officer position $46,598.00
Total $69,598.00
Page 70 of 91
Section 71
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Consultation
External Consultation - Community & Stakeholder
Throughout the trial period, the Flying Fox Management Officer has been in contact with both
eligible and ineligible residents around Wallace Park.
The Flying Fox Management Officer has engaged volunteers for Noosa Parks Association to
assist in weekly flying fox surveys to improve the accuracy of results.
When delivering the car covers to each subscriber, the Flying Fox Management Officer asked for
and received feedback on the progress of the current management strategies from willing
residents.
On 20 February 2017, the Flying Fox Management Officer performed a face-to-face interview
with individual residents to provide feedback. Those not home were provided with forms to return
to Council.
Internal Consultation
Council’s Management Accountant has been advised that this project may require consideration
in the next Budget Review.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer to the Mayor & CEO Community Facilities X Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office X Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service X Civil Operations
Economic Development Infrastructure Planning & Design
Governance X Planning & Environment
Human Resources Strategic Land Use Planning
Sustainability
Page 71 of 91
Section 72
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 1
Page 72 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 1
SD ON alam FE a. i tae
ae = Se i cacags arte
a MENLO ROCCE <e= Saleetee
- ee TTS oe a=
_ et :
Resident details
NAME: EMAIL:
ADDRESS: PHONE:
There are only 10 questions- Where required, please rate from 1-10 (1-Lowest, 10-Highest) and stay within
this range. Thank you.
1. Before October 2016, how great was the impact of the flying-foxes on your lifestyle?
Minimal 1 2 3 4 5 6 Zz 8 9 10 Extreme
2. Before October 2016, what was your level of satisfaction with Council’s management of the issue?
Minimal 1 2 3 4 5 6 r 8 9 10 Extreme
3. Did you sign up to the subsided services initiative? Yes (answer 4a) No (answer 4b)
4. a) lf so, how satisfied were you with the subsided services initiative?
Minimally 1 2 3 4 5 6 7 8 9 10 Extremely
b) If not, did you feel this program was beneficial for affected residents? Yes No
If not, why not?
5. The appointment of a Flying Fox Management Officer responsible for managing this conflict has
been beneficial?
Strongly Disagree Disagree No Change Agree Strongly Agree
If disagree, please provide suggestions
6. | am satisfied with the current level of communication with Council about flying-foxes?
Strongly Disagree Disagree No Change Agree Strongly Agree
If disagree, why not?
Please fill out back as well
NOOSA COUNCIL PO Box 141 P. (07) 5329 6500 [email protected]
doce REL ed TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 72 of 91Section 73
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 73 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
BI ae am wae -
eT ae SS
xn ‘ Se,
a NOOSA COUNCIL FR giEsx=° oko
mo s =. <n smb an
a i Seen :
a ate
7. | have had greater input into the flying-fox management in my area than before October 2016?
Strongly Disagree Disagree No Change Agree Strongly Agree
If disagree, please provide suggestions
8. Currently, how great is the impact of the flying-foxes on your lifestyle?
Minimal 1 2 3 4 5 6 T 8 9 10 Extreme
9. Currently, what is your level of satisfaction with Council’s management of the issue?
Minimal 1 2 3 4 5 6 7 8 9 10 Extreme
10. Additional comments or feedback:
Thank you for your participation.
Please return completed forms to- Noosa Shire Council
Attention: Tyron de Kauwe
PO Box 141
Tewantin QLD 4565
Or scan and email to: [email protected]
NOOSA COUNCIL PO Box 141 P. (07) 5329 6500 [email protected]
may acl TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 73 of 91Section 74
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
7 NOOSA BIOSPHERE RESERVE FOUNDATION BOARD - 6 MONTHLY REPORT
DOCUMENT INFORM AT ION
Author Chief Executive Officer, Brett de Chastel
CEO’s Office
Index ECM/ Subject/ Noosa Biosphere Reserve Foundation - Management
Attachments 1. Six Monthly Progress Report from Noosa Biosphere Reserve
Foundation Board
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Planning & Environment
Committee Meeting dated 7 March 2017 and note the progress report to Council by the Noosa
Biosphere Reserve Foundation for the six-month period to 31 December 2016 provided at
Attachment 1 to the report.
REPORT
As Council is aware, the Noosa Biosphere Reserve Foundation (NBRF) was established by
Council in 2015.
Council has two roles with the NBRF Board. Firstly, it has the right to appoint one Director of the
Board with Mayor Wellington being the current appointee. Secondly, the Council provides
funding under a Funding Agreement entered into on 1 June 2015. Under that funding
agreement, NBRF is required to provide a number of reports and information to Council.
Council has now received the six monthly report from the NBRF Board pursuant to section 5.2 (b)
of the Funding Deed which is attached to this report for the information of Council.
The Funding Agreement between the Council and NBRF includes a number of reporting and
other requirements in clauses 4 and 5 of that Deed. The current status of some of those key
requirements are set out below:
Clause 4.2 – requirement for NBRF to seek Council’s approval before NBRF commits to any
purchase, contract, undertaking or activity that has financial commitments beyond the period
of approved funding where Council funding is required. NBRF has complied with this
requirement by seeking Council’s approval (resolution in December 2015) for its multi-year
projects.
Clause 5.1 (a) – a requirement to develop a management plan for the Noosa Biosphere
Reserve in accordance with the management principles set out in Schedule 7 of the
Environment Protection and Biodiversity Conservation Regulation 2000. Subsequent to
entering into the Funding agreement with NBRF, we became aware that this requirement only
applies to Biosphere Reserves that were managed by the Commonwealth e.g. Uluru. That
legislative requirement does not apply to non-Commonwealth administered Biospheres. As
such, this requirement is not needed for the Noosa Biosphere Reserve.
Page 74 of 91
Section 75
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Clause 5.1 (b) – Develop an Operational Plan and Budget aligned with the objectives for the
Company and the Public Trust for each financial year and submit to Council for review no
later than three months before the beginning of each financial year. In accordance with
advice provided in December 2016, NBRF have advised that they will not need to draw down
on all of their operational funding for the 2016/17 financial year. As such, NBRF have drawn
down $70,000 of their operational funding for 2016/17 and have not drawn down the balance
operational funding of $70,000 resulting in a saving to Council’s budget (general rate funded).
The project funding of $250,000 for 2016/17 has been drawn down (environment levy
funded). In relation to the 2017/18 budget, the CEO is meeting with the Chairperson of
NBRF shortly to discuss their proposed budget for next year. This can be considered by
Council as part of the 2017/18 budget process.
Clause 5.1 (e) – In conjunction with the Council, develop appropriate key performance
indicators that best reflect the performance of the NBRF against the objects of the Public
Trust and submit to Council for review no less than 3 months before the beginning of each
financial year. Council may recall that NBRF reported to Council in its last annual report on a
range of KPIs that related to specific projects using a traffic light system. The CEO believes
that there is an opportunity to improve those KPIs and will be meeting with the Chairperson of
the NBRF Board shortly to formalise the final set of KPIs which needs to be agreed by both
parties. This was intended to be finalised prior to this time but has been delayed by other
priorities.
Clause 5.2 (a) – Prepare an annual report for each financial year and submit to Council no
later than 30 November each year. The annual report is to include evidence that the funding
is being successfully applied to the objects of the company and public trust and particularly to
the delivery of projects funded by the Council contribution. The NBRF Board reported on this
at the end of 2016 and that report was provided to Council in December 2016. (Note that an
annual report was not required in November 2015 as there was no Council funding provided
in 2014/15 – refer Council resolution dated 7 May 2015).
Clause 5.2 (b) – Prepare a progress report against the utilisation of the funding towards the
NBRF program and performance against agreed key performance indicators to 31 December
each year (6 month progress report) and submit to Council no later than 31 January each
year. This report attaches the NBRF 6 monthly report to 31 December. Of interest is the
proposed establishment of a Governance Sub-Committee and new members of the Board.
Clause 5.2 (c) – Provide an audited financial report (which identifies the use of the funding
provided by Council for the NBRF program). This was provided to the December 2016
Council meeting.
Previous Council Consideration
Ordinary Meeting, 15 December 2016, Page 11, Item 9
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 12 December 2016 and note the annual report for the financial year 2015/16 to Council by
the Noosa Biosphere Reserve Foundation which also incorporates their September 2016
quarterly report.
Page 75 of 91
Section 76
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Ordinary Meeting, 7 May 2015, Page 12, Item 4
That Council note the report by the Executive Officer to the Planning & Organisation Committee
Meeting dated 28 April 2015 and:
A. Agree to the revisions made to the draft funding deed between Council and the Noosa
Biosphere Foundation Ltd as detailed in Attachment 1 to the report; and
B. Authorise the Chief Executive Officer to amend Clause 4 – Payments to provide for the
project funding under Clauses 4.1 B ii) and iii) to be paid after 30 June 2015 and to finalise
the arrangements.
Ordinary Meeting, 12 March 2015, Page 10, Item 3
That Council note the report by the Executive Officer to the Planning & Organisation Committee
Meeting dated 3 March 2015 and the further report to the General Committee Meeting dated 9
March 2015 and:
A. Agree to enter into a funding deed with the Noosa Biosphere Reserve Foundation Ltd as
provided in Attachment 1 to the report to Planning & Organisation Committee dated 3
March 2015 with the following changes:
1. Clause 4.1 Payments
Amend clause 4.1 b) ii) to read “$250,000 (excluding GST) – payable to the NBRF
Public Trust from the Environment Levy for projects that conserve and/or improve
biodiversity in the Noosa Shire and have tangible and measurable outcomes”.
Amend clause 4.1 b) iii) to read “$80,000 (excluding GST) – payable to the NBRF
Public Trust for economic projects consistent with the purposes of the Trust.
2. Clause 6.2 Repayment of Funding
Amend as outlined in the further report to General Committee dated 9 March 2015.
B. Authorise the Chief Executive Officer to make minor alterations to the Deed, as may be
necessary, and enter into a formal agreement with the Foundation;
C. Agree in principle to a one-off contribution of $10,000 being for the establishment and initial
operating costs of a community based incorporated association that is aligned with the
purposes of the Noosa Biosphere Reserve Trust, subject to no membership fees being
charged until after the second annual general meeting;
D. Apply the exception to the requirement for tendering under Section 236(1)(b)(ii) of the Local
Government Regulation 2012 for the occupancy of part of Council owned premises located
on Lot 1, RP96529 at 52 Doonella Street, Tewantin as the proposed lease is to a not for
profit community organisation; and
E. Authorise the Chief Executive Officer to enter into negotiations with the Noosa Biosphere
Reserve Foundation Ltd and finalise a lease for part of Council owned premises located on
Lot 1, RP96529 at 52 Doonella Street, Tewantin, for a period of 3 years, with a 3 year
option
Finance & Risk
The purpose of this report is to provide the Council with a copy of the NBRF six-monthly report.
Obviously, the financial risk occurs if the NBRF does not deliver good outcomes in accordance
with the purpose of the funding. The annual report provides Council with details of progress with
particular projects being facilitated by the NBRF Board.
Page 76 of 91
Section 77
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Consultation
External Consultation - Community & Stakeholder
Liaison with Chairperson of the NBRF
Internal Consultation
Nil.
Departments/Sections Consulted:
X Chief Executive Officer Community Services Corporate Services
X Executive Officer to the Mayor & CEO Community Facilities Financial Services
Executive Support Community Development ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property & Facilities
Waste & Environmental Health Revenue Services
Executive Office Planning & Infrastructure
Community Engagement Building & Plumbing Services
Customer Service Civil Operations
Economic Development Disaster Management
Governance Infrastructure Planning & Design
Human Resources Planning & Environment
Sustainability Strategic Land Use Planning
Page 77 of 91
Section 78
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 78 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
ATTACHMENT 1
Lu e
<7 blosphere
Noosa Biosphere Reserve Foundation Limited
(‘NBRF” / “The Foundation”)
Quarterly Report to Council
Quarter ended 31 December 2016
(Q2 FY 2017)
Attachments —
1. Nick Heath CV (hard copy provided in Cllrs Room)
2. Karen Hussey CV (hard copy provided in Cllrs Room)
3. Kerri Watson CV (hard copy provided in Cllrs Room)
4. Keeping it in Kin Kin Presentation
Page 78 of 91Section 79
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 79 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
QUATERLY REPORT TO COUNCIL — Q2 FY 2017
1. Introduction
On behalf of the Noosa Biosphere Foundation (NBRF), | am pleased to provide Noosa
Council with an update on activities by the NBRF during the period round year end 2016.
We last met with Council in December 2016 and provided you with a financial report and
narrative on activities from 2015 to 30 June 2016.
We have held our first Board meeting for 2017 on 3 February 2017; key matters arising
from that meeting are included in this quarterly update report.
2. Appointments
We are fortunate to have three professionals join us in different capacities following our
Board meeting on 3 February 2017.
Nick Heath — Strategy Officer
Nick has agreed to join us as a consultant on a part time basis helping
the Board to focus on a few key issues, including the need to develop
and execute on a well-defined strategy, developing relationships which
will enhance our fundraising opportunities and delivering on an
advocacy position after our Fish Management Workshops.
Nick brings a wealth of experience pertinent to these aspirations of the NBRF, in particular
his experiences with WWF, the Barrier Reef and many years working with governmental
groups, including Ministers of the Environment. (Refer Attachment 1 for CV - hard copy
provided in Clirs Room)
Karen Hussey joins the Board
2 The NBRF has developed a close, working relationship with the Global
Change Institute for a number of months through 2016. Several of the
Board noted that Karen’s exceptional background and her engagement
A i with us meant her joining the Board would help fill out some of the skill
/ matrix needed for the Board going forward in 2017.
Consequent to Rowland Hill not being able to re-join the Board at our last AGM in
December 2016, we now have 7 members of a diverse but complementary skill set on the
Board.
We also resolved that, in future, we will seek broader, public input to Board Membership. In
this connection, the Board also approved in principle, the establishment of a Governance
Sub Committee to formalise a number of our policies and processes to ensure we are able
to fulfil our Charter most effectively. (Refer Attachment 2 for CV - hard copy provided in Cllrs
Room)
1
Page 79 of 91Section 80
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 80 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
QUATERLY REPORT TO COUNCIL — Q2 FY 2017
; Kerri Watson — KPI Officer
: -\ Kerri made contact with the Foundation last year prior to her relocating
a> s to Noosa late January 2017. Following several conversations during this
o period, Kerri has agreed in principle to provide part time consulting
WW services in respect of our execution on currently nominated KPI’s;
S namely, Funding, Projects, Governance and UNESCO renomination.
We have reached agreement on a redundancy package with our former Executive Officer
and are now able to fill in some of the gaps in our office capabilities.
The more immediate requirement of work for Kerri will revolve around engagement on the
UNESCO 10th year anniversary process; commencing with a joint review of (form filling)
requirements with NCBA and representatives from UNESCO/Canberra on 19th and 20th
February. (Refer Attachment 3 for CV - hard copy provided in Cllrs Room)
3. Programs
3.1. BRING BACK THE FISH (BBTF)
, G. = a i.
eae ee tee
Cae. ala aes
, wy elias aie
yee
. ; RX AS sa
a a A MM kee | oe
pale Mh | _ mee Lhe S
ane SF) ECS GTN
Good progress has been made in recent months round work in the lake area to review
Prawn population changes; approval for oyster bed restorations and construction and
installation of the oyster reefs. The next step is to develop a Communication Program,
which will be rolled out over coming months.
2
Page 80 of 91Section 81
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 81 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
QUATERLY REPORT TO COUNCIL — Q2 FY 2017 fees: a.
laws? qe
esc es.
3.2. INTEGRATED FISH MANAGEMENT PLAN
ames e
1 ui ca ¥ 3 0 oY = ee ee. &
\ x td el
ae Wiel Ue ee i oe ie
} | | Se
/ y; ae =
II
if
ai
Approval has been reached for WWF to run a series of workshops to develop an integrated
plan to continue after the Bring Back the Fish Program. Nick Heath provided an outline of
the proposed workshop; they have drawn up an outline of possible actions and themes but
further work is required to establish greater granularity.
3.3. MAPPING KOALA HEALTH
_, ” iat =
f 4) ay :
hg a 1 ae
, 1 : , LS &! y
te fj ia i } or
X aad an TS:
ak eS pes Y ae :
— aa yer aT NWS: Sy
\ a6 ae . isa bf
' a 0 Se IP yi es
2 al — Si by WES ata ‘
ain 4 Fay! Pe. ‘ , : t NSF F ee feet ¢ Ny pies £3
fester ey * ' c ? + . x 24 i a E in 4
Breeterse oP ewy toe pe ite ‘St an mm chee
The USC team continue with the mapping exercise using sniffer dogs — further detail will be
presented at the next report.
3
Page 81 of 91Section 82
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 82 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
QUATERLY REPORT TO COUNCIL — Q2 FY 2017
3.4. KEEPING IT IN KIN KIN
r , P ¥ P
! o
" \ e 7
fj Th fy hae Tm « Py
ye ee Ys > aha
i .# i ne ' :
ty Pa a i) , |
‘ , . ry m ‘ | : "
g< y r ro iN \ | | : ‘
’ ‘ _= .| + he 4 ; - : wit
ars | wee). amet ! mye
Bae ats PUR ee © ie YRS oe
i wt ae a). ~ Cao See Tai Bes i aes pnd
Rachel Lyons and Phil Moran gave a presentation updating progress on the 4 components
of the program; essentially, the LIDAR study results are in which show quite dramatic levels
of soil movement over time; the analysis of the study has been completed and ready for
peer review by Professor Hart (as agreed with The Thomas Foundation — Rowland Hill); an
area for “show case” remediation has been established and substantial work completed on
the property; and a reasonably significant area of weed/cat claw control has been
conducted. (Refer Attachment 4 for summary).
The next stage is to determine how the learnings can be rolled out in scale.
4
Page 82 of 91Section 83
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 83 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
QUATERLY REPORT TO COUNCIL — Q2 FY 2017
4. Financial Report
Noosa Biosphere Reserve Foundation Ltd ATF Noosa Biosphere Reserve Trust
Financial Statement for the 6 month period to 31 December 2016
Grant Funding a a
Noosa Council Grants received oo
Environmental SSCSC*~“‘~‘~sSC“‘CCCW#*C'SQ6OOOOOOO|--C~C«dSC(“‘CSNCCC*#*”
Other Grants Received po
The Thomas Foundation ee ee $284,090.91} |
Less Program Disbursements pO
USC - Bringing the Fish Back to Life | CisT: CS 99,225.00{ | Cd
NDLC - Contributions | $6,000.00] =| sd
MRCCC - Cod Hatchery Support po | 200.00
Tourism Noosa - Zero Emissions | $9091] |
908,515.91)
Surplus from Grant Funding 6 months ended 30 June 2016 ee Ae
Add Opening Grant Funding as at 1 July 2016 | ti‘ $553,109.82
Closing Grant Funding on hand 31 December 2016 | ti—“‘<‘iLSS «$730,684.82
a
Contributions 2016-17 pO
Noosa Shire Council 1st Qtr $35,000.00} P|
Noosa Shire Council 2nd Qtr $35,000.00 $70,000.00; . . #|[| |
a
FinterestReceved ——S=~—Ss—tSSCSC~“‘~‘~*~*rCSC*«w CWB] DOB]
a OC
Cash operating expenses pO
[Accounting 8 t00.00 |
Bank Fees and Charges | $3678[ —“‘iTSCd
Bookkeeping | $342.00 | |
Meeting Expenses | $101.48}
[Donations szzese[ |
[insurances CT CTC 888459
[Postage 7
Printing and Stationery | EN
Superannuation - Executive Officer YY $482.32 [|
Telephone fT SC~«dCi‘“‘ CBSA CYSCCCSC~C~C~CS
Web Site a
a $163.20] |
Wages - Executive Officer Pong |
[Consultants 8730.25
Pt 88,406.94)
Surplus from Operations 6 months ended 30 June 2016 Ps $33,861.56
Add Opening Operations Surplus as at 1 July 2016 | ti—‘<—‘iS 812,961.70
Closing Operations Surplus 31 December 2016 ee ee ee
Total Reserves (Grant Funding and Operational) Available Carry Forward $877,508.08
5
Page 83 of 91Section 84
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 84 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
On behalf of
The Noosa Biosphere Reserve Foundation Limited
Chairman
Campbell Corfe
February 14 2017
6
Page 84 of 91Section 85
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 85 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Noosa & District
Landcare
Ee 2S
a — ~ — =
“ a \ =i ==
rae: =e:
Wen = ; =i
=| Project Update
4 Fi —— s
NBF Board Meeting 3/2/17
K . Pin Cickie Pasieet~ le . >
‘Keeping it in Kin Kin’ Project - keeping po
Kin Kin’s soils in place and by doing so LA ‘pseu -
improving agricultural productivity, a oy
waterway health and water quality within Aad noosa
the Noosa Catchment. wy biosphere © st0catchments
CARING
* Within the 2016/17 financial year, the wm MES hile. | FOR
; : ; aoe NOOSA aia ae | OUR
roject comprises 4 specific activities. COUNTRY
sid - i = _ mm MECOONGIE
Be one a Group
Ree oy e a: Noosa Integrated
~ eee pe ve Country Noosa $
‘s = ae es ees Catchment Assn. Inc.
BINS ee cae ae
Wat ea, as’ iets See ——
. Bing, x 7m Sey he PARKS z. =
oo Pee Re pay > ~NOOSA m Thomas.
, SY mts association inc.
= PERN es
= LA Noosa & District
1 Landcare
Page 85 of 91Section 86
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 86 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Activity 1 - LIDAR Change Analysis & lo» a :
Area Prioritisation eet |
Activity overview — to identify areas within the catchment that kgs :
are impacted by soil loss and deposition, including hill slopes and ‘tars
creek lines. This is undertaken by LIDAR (Light Detection &
Ranging) which uses a near-infrared laser to map the land from we
aircraft. The project will compare imagery from 2008 to 2015to ~—|s
identify active erosion and deposition areas. A prioritization ieee
exercise will then inform the problem sites in greatest need of sie =
remediation in the Catchment. ae
Saree katy nena
Update — Draft report produced and currently being reviewed by
Prof Barry Hart (Thomas Foundation preferred reviewer). Moving} Sizsy.,
to the ‘Action Plan / Prioritisation’ stage in late February. © s22c2:2:ens
A Noosa & District
Landcare
: |
Interim Results — aj
example |
me
Active landslip on upper
slopes and deposition
caught by dam/s
When 2008 LIDAR imagery is placed over
the 2015 imagery we can see where
‘change’ in elevation has occurred and
can therefore measure areas of soil loss :
and gain.
eee <a. aS
: re esaa—— 3] ee = a
Page 86 of 91Section 87
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 87 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Interim Results — po :
example “ om
. | d li >.
Active landslip on upper yk
slopes and deposition
caught by dam/s
When 2008 LIDAR imagery is placed over
the 2015 imagery we can see where
‘change’ in elevation has occurred and
can therefore measure areas of soil loss ,
and gain.
| es S| |
Pee Ser i
Interim Results —
example 5 ees ;
Yi g Ser aS
. . . ‘ ss r Se
Active landslip on upper Le
slopes and deposition PO ere
caught by dam/s ee =
When 2008 LIDAR imagery is placed over ie
the 2015 imagery we can see where :
‘change’ in elevation has occurred and
can therefore measure areas of soil loss a
and gain. . j
a a
Page 87 of 91Section 88
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 88 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Interim Results:
Interim Results — focus Soil Mobilisation in Kin Kin Catchment 2008-2015
areas:
2,486,691 tonnes of soil
Active channel & gully mobilised
erosion
Slumping on hillslopes Over an area of 208 ha
Riparian/ Creek bank (Total observed range dataset -
erosion 50cm-9m erosion depth)
—. : a os
SS Mo Me 3 a
Sibi? ba A LS . .
a aes f ONS Pr &
NG Be >a
v pp. Hi arias nig oe
7 Q YR WSS. as ;
: / 59 me rag 15 - ‘4 f
Page 88 of 91Section 89
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 89 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Activity 2 — Riparian Restoration On-ground Demonstration Works
Activity overview —
On-ground demonstration site for
remediation of active hill-slope and riparian oe
erosion. Glasby’s property — Kin Kin. fmm
Over 850m of stock exclusion fencing and Rae We :
2300 trees (1/2 ha) will be planted as part of "issiMiecammee: F
this project. 6 a! r
R eh y UJ rn
es Soe — ca Noosa & District
Landcare
: |
Noosa Biosphere Riparian, Gully & Hill Slope Restoration
Project —- Glasby property, Kin Kin
2 Fencing &
ea Ne
7 Se
es oy, eas
Page 89 of 91Section 90
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 90 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Fencing and AEP aes DS Sea
revegetating slumps Bore Fa a nT
ee P — er a ea Pea os
; eta es ig a) Ween 2 A AT ¢
‘ ss ghcightan SNP SN all oa RRO eee ak dite
and eroding creek ieee 6a I mane
id le etl i ee Se tn ae Wa aes ee
banks parece. Wa. TS ein ee
fi TIRE 6 SON el te re eae pee wees Nene Pre Mee abo” ale Sages
Fa PT hoe NN SE 0S lige
; NY ‘gel re ae mer « nee % ie ; ‘ _— ee
Oh ir Sag y, Bo a Sie 8
‘3 RS Y PBN a \ CMe i 7 Bee : pe wt
ha EGE NE) as po a ae
7 ee ‘ oh x ET oe Le r Cu Ss fag eNiar
ie ace wt ene a
=> aa te Be S ee hea 7h
ane wa Bel £) SSAA... ,
ali ait satire cea
2 joan Se \ me ii i *
* z 4 = a ae hoa = eee ' Lt - Rp ee
i ee Se AF ta *. aed bt ES Veeae Pe
ee eee, ag gee Ripe RT cia
Masih ar = ets ae cakes fe : es: age ae ax
en Qe P BE i Bie eer fags, eR a er age 4 aiegy Comey adi Fag
al Gin Te ES Pa ap er bE TURP TERS eee Un kg eee a ae
a Rg ras, i ae, er ie te
Ree ito eee < : pee et At
ONE Lie oo ee ae Bee ae oat 3 : Ue RS ME DI nn AS img Kare ea a's
pobatien BOE sien ae Pele ee ee eee Pea. hae ote gS
ed lee ee Oe PCN Pied ee
Se ike i ee a
4,months on.... nee tae : “
ae a teeta ek) ee i gigs ‘
happy trees and ney ce Fi ee
me hy 64 f a ye R's
happy people ya ie
eo te . , A
Betas mah mr. Le oN
ae aa
. Ne OO Sa anlar ame
Ge $ A ma EE ae pa oe
BPs wail oe os ges3
~ : Nae a eg : ae Lae eo
ee ; rf eho on nS zy . me eof fas iy ae is ai oe
nS ee ieee Seek i lo ee © wea
A ts ~ aes a? g De
S es Pie. ob 5 | ee ee: ; ~ s + <a
. 2 ‘ FRaN!) 9 gy a SS
y i i {ies ene ay. Pie : An
EY Se, eee ae
B® a et a ae me
4 rv : , oy, RS ie ‘ N ise Pigs
oy by Sar," <a RRS ‘i ee ee a & oii ie ‘
Os sa et 4 mast a! ie - ms
a ae 7 ain. a Oe ee fg ste Ne :
: Ps - . eae 5 Eee Bo
fo a Ya ci a ee
Page 90 of 91Section 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Page 91 of 91
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
FR
Activity 3 - Cats Claw Creeper Vine (Canopy Weed) Treatment,
Survey and Action Plan Development Dene
Activity overview — ov
Cats Claw Creeper Vine manual and chemical control in current Ps
know areas, while surveys of remaining areas of the catchment Pa)
will be undertaken. rane
An Action Plan will be tne in partnership with SEQC, NC i te
and NDLG so that future funding for vine eradication is strategic
and targeted.
$20,000 on ground funds from SEQC. tes
Activity Update — OTe: Wt cet
200ha over ~so lineal (windy & rugged) kilometers of creekline ; iF a F
vegetation surveyed a - Th ee
284 infestation sites recorded y a sa
g2 sites (all those below Wahpunga Park treated) a
Biocontrol released on several larger infestation sites ne x K .
=< ae
eae of further funds from SEQC to finish the re
survey above Kin Kin township prior to action plan development. ; initia
wma Landcare
° ay Legend | teeny
t , ; 2h ws ° Weed Treatment Point & Control
i €® a | ft ae 4 Weed infestation Point eines’
wide ine ree ch 4 nN a _ ——— a Catchments Project
mM aa E fe ae |__|] Te es Job #11531
fo fo es “ST beg ae Kin Kin Creek
ee f KON KIN CREEK [a i Ce : & é & tributaries
; BT. x ae er Pi * eer ee f ss ES
4 i ew a a Pee’, kp 4 \ Aaa cnee? a ;
or . i te & mf : P VA
e eee yh? Be. oe Ses
ae" oe \ Sa so |
See on aj
F . iit —— 4 : p iS a ‘ {
gy Pris: : ; FS el iS sea 3 :
D abt ie 27 Jae \Eaey a " i ay
ee k ig ws . : 4 | | \ Pee | “ j ; is ‘ c a dapper tt
1 ae POY Saas pres” Ne / <- : ree ,
Page 91 of 91