Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2017-03-07 Planning & Environment Committee Agenda

of 91

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      7 MARCH 2017


2.      SITE DETAILS
2.1. Background
The following table describes all the approvals given over the site, and their current status:

 File             Description of Approval      Council Decision Date and Comments
 Reference

 TPC2846          Development Permit for       5 September 1995
                  Indoor entertainment, new
                  clubhouse,    sport   and     Conditions required the completion of frontage works
                  recreation - new bowling        including 25 angle car parks in Opal Street and a
                  green                           meandering footpath.
                                                Council did the road upgrades to Pearl Street and the
                                                  Club constructed the car parks.
                                                Due to the credit for the existing clubhouse, the
                                                  planning requirement was only 13 car bays.

 23431 DA         Development Permit for       On the 1 July 2004, Council approved 21 motel units.
                  Motel – 21 Accommodation     Reasons for the approval despite the inconsistency with
                  Units (Lapsed)               the zoning are outlined below:
                                                There has been considerable community support for
                                                  the proposal, including the Chamber of Commerce;
                                                The motel is to be developed on the same site as the
                                                  bowls club, which has a low intensity of development;
                                                  and
                                                There is a significant need for additional short-term
                                                  accommodation such as a motel in the town of
                                                  Cooroy.

 Change –         Permissible Change for       On the 3 July 2008, Council gave approval to use the
 TPC2846          Addition to Building -       outdoor area on the western side of the bowls club to
                  Outdoor Smoking area         allow for outdoor smoking area.

 MCU10/21         Development Permit     for   On the 31 October 2011, Council issued the following
 16               Reconfiguring a Lot          approvals:
                  Preliminary Approval for     Development Permit for Reconfiguring a Lot (1 into 2
                  Multiple Housing Type 4:     lots) to subdivide the 5,059m2 Cooroy Bowls Club site
                  extended until 31 October    into 2 lots (5 & 11 Opal Street
                  2019
                                               Preliminary Approval for Multiple Housing Type 4 – 6 x 2
                                               bedroom units with the following grounds to justify the
                                               decision, despite the conflict with the planning scheme:
                                               29. The proposed use is consistent with the existing
                                                   and preferred development pattern of the
                                                   surrounding area;
                                               30. The land is not required for Open Space
                                                   Recreation, as demonstrated in the recently
                                                   endorsed Open Space Strategy 2011 and Sport and
                                                   Recreation Strategy 2011; and
                                               31. The proposal maintains the existing bowls club on
                                                   the majority of the site.




                                                                                       Page 18 of 91
Log in to download the original file

2017-03-07 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.